No.
HONG KONG ISLAND
—
Contd.
Appendix IV-Contd.
Project
219
Date of Inclusion
DRAINAGE
DH22
DH23
Deep Water Bay Sewerage Scheme, Stage II
62/3
Stanley Sewerage Scheme, Stage II
62/1
DH25
Permanent Training of Hill Streams at Eastern End of Stubbs Road
64/1
PORT WORKS
*PH16
Lei Yue Mun South Beacon
62/JUN
KOWLOON AND NEW KOWLOON
ROADS AND BRIDGES
RK54
RK55 *RK56
Reprovisioning of Link Road between Kwun Tong Road and Ngau Tau Kok Road Tin Kwong Road Improvements
63/3
60/3
Roads and Gardens Depot, Kai Tak Airport
62/3
RK 58
RK62
RK63
RK65
Additional Marking Checkered Hill-Approach to Kai Tak Airport Widening of Chatham Road from Gascoigne Road to Winslow Street Access Road from Nga Tsin Wai Road to Prince Edward Road Fat Kwong Street, Construction of Unformed Section
64/1
64/2
64/2
64/2
RK68
Jordan Road Ferry Concourse Interim Improvement
64/3
| PORT WORKS
*PK14 PK17
Repairs of Structures on Kowloon ex-Naval Camber Alteration to Kweilin Street Refuse Pier
62/3
64/2
NEW TERRITORIES
ROADS AND BRIDGES
†RN47
Lam Tei Road
63/1
*RN48
Improvements of Bend at M.S. 10, Castle Peak Road
63/1
RN49
Realignment of Tai Po Road at M.S. 12}
63/3
RN55
Foot-bridge at Sha Tin
64/3
DN13
DN14
*DN15
*PN13
DRAINAGE
Cheung Chau, Drainage and Roads
Peng Chau (Silver Mine Bay) Roads and Drains Sai Kung Roads and Drains
PORT WORKS
Improvements to Pier at 13 M.S., Castle Peak Road *PN15 Boom at Gin Drinkers Bay Refuse Dump *PN16
PN17
62/3
62/3
62/3
Light Beacon below Castle Peak Road, 15 M.S. Navigational Light at Shek Kok Tsui, Lamma Island
63/2
63/2
62/JUN
PN18
PN19
Mooring Facilities at Gin Drinkers Bay Refuse Dump Widening of Peng Chau Pier
62/3 64/APR
64/1
PN20
PN21
Light Beacons-Silver Mine Bay, Datum Rock and Douglas Rock Light Beacon, Ma Yan Pai (Junk Rock), Long Harbour
64/1
64/2
PN23
Silverstrand Beach Seawall
64/3
PN24
Sha Lo Wan Pier (North West Lantau)
64/3
* Completed Items
† RN47
Transferred to C
Page 225Page 226
No comments yet.
Private notes are available after approval.