AnnualReport-1937 — Page 690

Administrative Reports 行政報告書 All AI Reviewed

– Q 29

Particulars of the additional areas laid with improved surfacing were:

Tarring and sanding
21" granolithic paving laid on footways
Slab paving laid on footways
New dry macadam surfacing

Square yards.
91,899
3,748
22
78,199

Expenditure
$23,504.23

90. Maintenance of Telephones:-Lines and instruments were maintained in good order.

Expenditure
$400.40

91. Maintenance of Sewers, Nullahs, etc:-Sewers, storm water drains, and trained nullahs were cleansed, repaired, and maintained in good condition. Open channels and nullahs were cleansed by the Sanitary Department. Sand deposits, as they accumulated were removed.

Expenditure
$4,162.86

92. Street Lighting:-The total number of electric street lamps in use at the end of the year was 583, an increase of twenty-five over the previous year.

Expenditure
$23,955.63

93. Typhoon and Rainstorm Damages:-Repairs were carried out to the following buildings:-Kowloon City Police Station, Lai Chi Kok Prison, Shamshuipo Police Station and Cheung Chau Wan Market. Damages to various roads, surfacing and embankments were made good. Telephone poles and lines were also repaired.

Sand and silt were removed from, and repairs carried out to nullahs, culverts and channels at Grampian Road, Kai Tak Airport, Lai Chi Kok, Tonkin Street, Nanchang Street and Upper Taipo Road and at various catchpits. Repairs were also carried out at the Waterboat Dock at Lai Chi Kok and at Shamshuipo Ferry Pier.

Expenditure
$31,034.45

94. Maintenance of Water works, Lai Chi Kok:-The total quantity of water supplied during the year was 96.33 million gallons an increase of 3.90 million gallons on 1936 and an average consumption of 264,000 gallons per day. In the portions of Camp and Pratas Streets to the south-west of Castle Peak Road 280 and 200 feet of 6" spun iron main were laid.

Details of consumption are given in Table X.

Expenditure
$3,727.99

Page 690

Page 691

Edit History

2026-05-10 07:10:04 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Q 29 Particulars of the additional areas laid with improved surfacing were: Tarring and sanding 21" granolithic paving laid on footways Slab paving laid on footways New dry macadam surfacing Square yards. 91,899 3,748 22 78,199 Expenditure $23,504.23 90. Maintenance of Telephones:-Lines and instruments were maintained in good order. Expenditure $400.40 91. Maintenance of Sewers, Nullahs, etc:-Sewers, storm water drains, and trained nullahs were cleansed, repaired, and maintained in good condition. Open channels and nullahs were cleansed by the Sanitary Department. Sand deposits, as they accumulated were removed. Expenditure $4,162.86 92. Street Lighting:-The total number of electric street lamps in use at the end of the year was 583, an increase of twenty-five over the previous year. Expenditure $23,955.63 93. Typhoon and Rainstorm Damages:-Repairs were carried out to the following buildings:-Kowloon City Police Station, Lai Chi Kok Prison, Shamshuipo Police Station and Cheung Chau Wan Market. Damages to various roads, surfacing and embankments were made good. Telephone poles and lines were also repaired. Sand and silt were removed from, and repairs carried out to nullahs, culverts and channels at Grampian Road, Kai Tak Airport, Lai Chi Kok, Tonkin Street, Nanchang Street and Upper Taipo Road and at various catchpits. Repairs were also carried out at the Waterboat Dock at Lai Chi Kok and at Shamshuipo Ferry Pier. Expenditure $31,034.45 94. Maintenance of Water works, Lai Chi Kok:-The total quantity of water supplied during the year was 96.33 million gallons an increase of 3.90 million gallons on 1936 and an average consumption of 264,000 gallons per day. In the portions of Camp and Pratas Streets to the south-west of Castle Peak Road 280 and 200 feet of 6" spun iron main were laid. Details of consumption are given in Table X. Expenditure $3,727.99 Page 690 Page 691
Baseline (Original)
Q 29 Particulars of the additional areas laid with improved sur- facing were: Tarring and sanding 21" granolithic paving laid on footways Slab paving laid on footways New dry macadam surfacing Expenditure Square yards. 91,899 3,748 22 78,199 $23,504.23 90. Maintenance of Telephones:-Lines and instruments were maintained in good order. Expenditure $400.40 91. Maintenance of Sewers, Nullahs, etc:-Sewers, storm water drains, and trained nullahs were cleansed, repaired, and maintained in good condition. Open channels and nullahs were cleansed by the Sanitary Department. Sand deposits, as they accumulated were removed. Expenditure $4,162.86 92. Street Lighting:-The total number of electric street lamps in use at the end of the year was 583, an increase of twenty-five over the previous year. Expenditure $23,955.63 93. Typhoon and Rainstorm Damages:-Repairs were carried out to the following buildings:-Kowloon City Police Station, Lai Chi Kok Prison, Shamshuipo Police Station and Cheung Cha Wan Market. Damages to various roads, surfacing and embankments were made good. Telephone poles and lines were also repaired. Sand and silt were removed from, and repairs carried out to nullahs, culverts and channels at Grampian Road, Kai Tak Airport, Lai Chi Kok, Tonkin Street, Nanchang Street and Upper Taipo Road and at various catchpits. Repairs were also carried out at the Waterboat Dock at Lai Chi Kok and at Sham- shuipo Ferry Pier. Expenditure $31,034.45 94. Maintenance of Water works, Lai Chi Kok:-The total quantity of water supplied during the year was 96.33 million gallons an increase of 3.90 million gallons on 1936 and an average consumption of 264,000 gallons per day. In the portions of Camp and Pratas Streets to the south-west of Castle Peak Road 280 and 200 feet of 6" spun iron main were laid. Details of consumption are given in Table X. Expenditure $3,727.99 Page 690Page 691
2026-05-10 07:10:04 · Baseline
View content

– Q 29

Particulars of the additional areas laid with improved sur-

facing were:

Tarring and sanding

21" granolithic paving laid on footways

Slab paving laid on footways

New dry macadam surfacing

Expenditure

Square yards.

91,899

3,748

22

78,199

$23,504.23

90. Maintenance of Telephones:-Lines and instruments were maintained in good order.

Expenditure

$400.40

91. Maintenance of Sewers, Nullahs, etc:-Sewers, storm water drains, and trained nullahs were cleansed, repaired, and maintained in good condition. Open channels and nullahs were cleansed by the Sanitary Department. Sand deposits, as they accumulated were removed.

Expenditure

$4,162.86

92. Street Lighting:-The total number of electric street lamps in use at the end of the year was 583, an increase of twenty-five over the previous year.

Expenditure

$23,955.63

93. Typhoon and Rainstorm Damages:-Repairs were carried out to the following buildings:-Kowloon City Police Station, Lai Chi Kok Prison, Shamshuipo Police Station and Cheung Cha Wan Market. Damages to various roads, surfacing and embankments were made good. Telephone poles and lines were also repaired.

Sand and silt were removed from, and repairs carried out to nullahs, culverts and channels at Grampian Road, Kai Tak Airport, Lai Chi Kok, Tonkin Street, Nanchang Street and Upper Taipo Road and at various catchpits. Repairs were also carried out at the Waterboat Dock at Lai Chi Kok and at Sham- shuipo Ferry Pier.

Expenditure

$31,034.45

94. Maintenance of Water works, Lai Chi Kok:-The total quantity of water supplied during the year was 96.33 million gallons an increase of 3.90 million gallons on 1936 and an average consumption of 264,000 gallons per day. In the portions of Camp and Pratas Streets to the south-west of Castle Peak Road 280 and 200 feet of 6" spun iron main were laid.

Details of consumption are given in Table X.

Expenditure

$3,727.99

Page 690Page 691

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.