The following items of work were undertaken and completed by the end of 1935:- Taipo Road-tar painting with chippings road surface at Kowloon Reservoir; repairs to road surface between Tai Wai and Sha Tin Railway Crossing; repairs to bridge at 15 Mile, Taipo; surfacing Taipo Market area; erection of village nameplates; tar painting with chips near San Hui, Castle Peak; repairs to channels between Castle Peak and Tsun Wan; patching road surface between Au Tau and Mai Po; erection of village nameplates and street nameplates at Un Long: erection of sign posts at Fanling cross roads and Golf Club cross roads; and strengthening and improving the road surface between Au Ha Gap and Sha Tin Kok for a distance of about two miles including margins, channels and 4"/6" macadam tarpainted with chippings together with provision of subsoil drainage.

The following are particulars of the area laid during the year:-

Square yards. Expenditure Tarring and chippings 57,894 $58,963.08 New dry macadam surface 53,019 Granolithic paving 829

95.

Maintenance of Telephones:- The lines and instruments were maintained in good order. A telephone was removed from old Sheung Shui Railway Station to the new Station.

Expenditure $4,276.36

96.

Maintenance of Sewers, Nullahs, etc.:- Sewers, storm water drains, trained nullahs and concrete channels were cleansed, repaired and maintained in good condition. Sundry repairs were carried out to channels.

97.

Expenditure $333.97

Electric Lighting:- The total number of street lamps in use at the end of the year was thirty-two, an increase of eighteen over the previous year, the additional lamps being installed at Un Long.

Expenditure $869.50

98. Typhoon and Rainstorm Damage:- The following damage was caused by rainstorm throughout the year, repairs being completed by the end of 1935:- Tai Po Road-wash-out to embankment at 5 Mile and at 6 Mile, repairs to landslip, catchwater and channel at 12 Mile, and removing minor...

Edit History

2026-05-09 23:45:34 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Q 31- The following items of work were undertaken and completed by the end of 1935:- Taipo Road-tar painting with chippings road surface at Kowloon Reservoir; repairs to road surface between Tai Wai and Sha Tin Railway Crossing; repairs to bridge at 15 Mile, Taipo; surfacing Taipo Market area; erection of village nameplates; tar painting with chips near San Hui, Castle Peak; repairs to channels between Castle Peak and Tsun Wan; patching road surface between Au Tau and Mai Po; erection of village nameplates and street nameplates at Un Long: erection of sign posts at Fanling cross roads and Golf Club cross roads; and strengthening and improving the road surface between Au Ha Gap and Sha Tin Kok for a distance of about two miles including margins, channels and 4"/6" macadam tarpainted with chippings together with provision of subsoil drainage. The following are particulars of the area laid during the year:- Square yards. Expenditure Tarring and chippings 57,894 $58,963.08 New dry macadam surface 53,019 Granolithic paving 829 95. Maintenance of Telephones:- The lines and instruments were maintained in good order. A telephone was removed from old Sheung Shui Railway Station to the new Station. Expenditure $4,276.36 96. Maintenance of Sewers, Nullahs, etc.:- Sewers, storm water drains, trained nullahs and concrete channels were cleansed, repaired and maintained in good condition. Sundry repairs were carried out to channels. 97. Expenditure $333.97 Electric Lighting:- The total number of street lamps in use at the end of the year was thirty-two, an increase of eighteen over the previous year, the additional lamps being installed at Un Long. Expenditure $869.50 98. Typhoon and Rainstorm Damage:- The following damage was caused by rainstorm throughout the year, repairs being completed by the end of 1935:- Tai Po Road-wash-out to embankment at 5 Mile and at 6 Mile, repairs to landslip, catchwater and channel at 12 Mile, and removing minor...
Baseline (Original)
Q 31- The follwoing items of work were undertaken and com- pleted by the end of 1935:-Taipo Road-tar painting with chippings road surface at Kowloon Reservoir; repairs to road surface between Tai Wai and Sha Tin Railway Crossing; repairs to bridge at 15 Mile, Taipo; surfacing Taipo Market area; erection of village nameplates; tar painting with chips near San Hui, Castle Peak; repairs to channels between Castle Peak and Tsun Wan; patching road surface between Au Tau and Mai Po; erection of village nameplates and street nameplates at Un Long: erection of sign posts at Fanling cross roads and Golf Club cross roads; and strengthening and improving the road surface between Au Ha Gap and Sha Tau Kok for a distance of about two miles including margins, channels and 4"/6" macadam tarpainted with chippings together with pro- vision of subsoil drainage. The following are particulars of the area laid during the year:- Tarring and chippings New dry macadam surface Granolithic paving 95. Expenditure Square yards. 57,894 53,019 829 $58,963.08 Maintenance of Telephones:-The lines and instru- ments were maintained in good order. A telephone was re- moved from old Sheung Shui Railway Station to the Station. new Expenditure $ 4,276.36 96. Maintenance of Sewers, Nullahs, etc.:-Sewers, storm water drains, trained nullahs and concrete channels were cleansed, repaired and maintained in good condition. Sundry repairs were carried out to channels. 97. Expenditure $ 333.97 Electric Lighting:-The total number of street lamps in use at the end of the year was thirty-two an increase of eighteen over the previous year, the additional lamps being installed at Un Long. Expenditure $ 869.50 98. Typhoon and Rainstorm Damage: -The following damage was caused by rainstorm throughout the year, repairs being completed by the end of 1935:-Tai Po Road-wash-out to embankment at 5 Mile and at 6 Mile, repairs to landslip, catchwater and channel at 12 Mile, and removing minor
2026-05-09 23:45:34 · Baseline
View content

Q 31-

The follwoing items of work were undertaken and com- pleted by the end of 1935:-Taipo Road-tar painting with chippings road surface at Kowloon Reservoir; repairs to road surface between Tai Wai and Sha Tin Railway Crossing; repairs to bridge at 15 Mile, Taipo; surfacing Taipo Market area; erection of village nameplates; tar painting with chips near San Hui, Castle Peak; repairs to channels between Castle Peak and Tsun Wan; patching road surface between Au Tau and Mai Po; erection of village nameplates and street nameplates at Un Long: erection of sign posts at Fanling cross roads and Golf Club cross roads; and strengthening and improving the road surface between Au Ha Gap and Sha Tau Kok for a distance of about two miles including margins, channels and 4"/6" macadam tarpainted with chippings together with pro- vision of subsoil drainage.

The following are particulars of the area laid during the year:-

Tarring and chippings

New dry macadam surface

Granolithic paving

95.

Expenditure

Square yards.

57,894

53,019

829

$58,963.08

Maintenance of Telephones:-The lines and instru- ments were maintained in good order. A telephone was re- moved from old Sheung Shui Railway Station to the Station.

new

Expenditure

$ 4,276.36

96.

Maintenance of Sewers, Nullahs, etc.:-Sewers, storm water drains, trained nullahs and concrete channels were cleansed, repaired and maintained in good condition. Sundry repairs were carried out to channels.

97.

Expenditure

$ 333.97

Electric Lighting:-The total number of street lamps in use at the end of the year was thirty-two an increase of eighteen over the previous year, the additional lamps being installed at Un Long.

Expenditure

$ 869.50

98. Typhoon and Rainstorm Damage: -The following damage was caused by rainstorm throughout the year, repairs being completed by the end of 1935:-Tai Po Road-wash-out to embankment at 5 Mile and at 6 Mile, repairs to landslip, catchwater and channel at 12 Mile, and removing minor