Fanling-Kowloon Road-Resurfacing Lok Ma Chau Road from its junction with main road to approach path to Police Station. Repairs to embankment North of Au Tau Bridge, to channelling on Kam Tin Road and to embankment North of Un Long Village.

Tarpainting two miles of main road between Un Long and Castle Peak. Construction of Car Parks between 10th to 13th Miles-Castle Peak Road. Construction of subsoil drainage and repairs to road surface in cutting at Tsun Wan Village.

Repairs to invert of single span bridge at 8 Miles. Strengthening and improving the road surface from Fanling Cross Roads (at the junction with approach road to the Royal Hong Kong Golf Club) to Sheung Shui Railway Station, also to Level Crossing between Fanling and Sheung Shui Railway Stations. The work included margins, channels and 4"/6" macadam tarpainted with chippings.

Fanling-Sha Tau Kok Road.-Strengthening and improving the road surface in the vicinity of Sha Tau Kok Police Station for a distance of about one mile including margins, channels and 4"/6″ macadam tarpainted with chippings together with provision of subsoil drainage.

Sha Tau Kok-Sheung Shui Patrol Path.-Provision of passing places at regular intervals. Construction of extra span to existing bridge near Sheung Shui.

year:

The following are particulars of the area laid during the

Square yards. Expenditure Tarring and chippings 167,139 $79,538.07 New dry macadam surface 102,945 Granolithic paving 1,156

96. Maintenance of Telephones:-Lines and instruments were maintained in good order. Aerial telephone route at 9 Mile on Castle Peak Road was repaired.

Expenditure $4,274.39

97. Maintenance of Sewers, Nullahs, etc.:-Sewers, storm water drains, trained nullahs and concrete channels were cleansed, repaired, and maintained in good condition. Sundry repairs were carried out to channels, and improvements effected to rocky streamcourses.

Expenditure $309.21

Edit History

2026-05-09 19:49:04 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
31 Fanling-Kowloon Road-Resurfacing Lok Ma Chau Road from its junction with main road to approach path to Police Station. Repairs to embankment North of Au Tau Bridge, to channelling on Kam Tin Road and to embankment North of Un Long Village. Tarpainting two miles of main road between Un Long and Castle Peak. Construction of Car Parks between 10th to 13th Miles-Castle Peak Road. Construction of subsoil drainage and repairs to road surface in cutting at Tsun Wan Village. Repairs to invert of single span bridge at 8 Miles. Strengthening and improving the road surface from Fanling Cross Roads (at the junction with approach road to the Royal Hong Kong Golf Club) to Sheung Shui Railway Station, also to Level Crossing between Fanling and Sheung Shui Railway Stations. The work included margins, channels and 4"/6" macadam tarpainted with chippings. Fanling-Sha Tau Kok Road.-Strengthening and improving the road surface in the vicinity of Sha Tau Kok Police Station for a distance of about one mile including margins, channels and 4"/6″ macadam tarpainted with chippings together with provision of subsoil drainage. Sha Tau Kok-Sheung Shui Patrol Path.-Provision of passing places at regular intervals. Construction of extra span to existing bridge near Sheung Shui. year: The following are particulars of the area laid during the Square yards. Expenditure Tarring and chippings 167,139 $79,538.07 New dry macadam surface 102,945 Granolithic paving 1,156 96. Maintenance of Telephones:-Lines and instruments were maintained in good order. Aerial telephone route at 9 Mile on Castle Peak Road was repaired. Expenditure $4,274.39 97. Maintenance of Sewers, Nullahs, etc.:-Sewers, storm water drains, trained nullahs and concrete channels were cleansed, repaired, and maintained in good condition. Sundry repairs were carried out to channels, and improvements effected to rocky streamcourses. Expenditure $309.21
Baseline (Original)
31 Fanling-Kowloon Road-Resurfacing Lok Ma Chau Road from its junction with main road to approach path to Police Station. Repairs to embankment North of Au Tau Bridge, to channelling on Kam Tin Road and to embankment North of Un Long Village. Tarpainting two miles of main road between Un Long and Castle Peak. Construction of Car Parks between 10th to 13th Miles-Castle Peak Road. Construction of subsoil drainage and repairs to road surface in cutting at Tsun Wan Village. Re- pairs to invert of single span bridge at 8 Miles. Strengthening and improving the road surface from Fanling Cross Roads (at the junction with approach road to the Royal Hong Kong Golf Club) to Sheung Shui Railway Station, also to Level Crossing between Fanling and Sheung Shui Railway Stations. The work included margins, channels and 4"/6" macadam tarpainted with chippings. Fanling-Sha Tau Kok Road.-Strengthening and improving the road surface in the vicinity of Sha Tau Kok Police Station for a distance of about one mile including margins, channels and 4"/6′′ macadam tarpainted with chippings together with provision of subsoil drainage. Sha Tau Kok-Sheung Shui Patrol Path.-Provision of pass- ing places at regular intervals. Construction of extra span to existing bridge near Sheung Shui. year: The following are particulars of the area laid during the Tarring and chippings New dry macadam surface Granolithic paving Expenditure Square yards. 167,139 102,945 1,156 $79,538.07 96. Maintenance of Telephones:-Lines and instruments were maintained in good order. Aerial telephone route at 9 Mile on Castle Peak Road was repaired. Expenditure $4,274.39 97. Maintenance of Sewers, Nullahs, etc.:-Sewers, storm water drains, trained nullahs and concrete channels were cleansed, repaired, and maintained in good condition. Sundry repairs were carried out to channels, and improvements effected to rocky streamcourses. Expenditure $309.21
2026-05-09 19:49:04 · Baseline
View content

31

Fanling-Kowloon Road-Resurfacing Lok Ma Chau Road from its junction with main road to approach path to Police Station. Repairs to embankment North of Au Tau Bridge, to channelling on Kam Tin Road and to embankment North of Un Long Village.

Tarpainting two miles of main road between Un Long and Castle Peak. Construction of Car Parks between 10th to 13th Miles-Castle Peak Road. Construction of subsoil drainage and repairs to road surface in cutting at Tsun Wan Village.

Re- pairs to invert of single span bridge at 8 Miles. Strengthening and improving the road surface from Fanling Cross Roads (at the junction with approach road to the Royal Hong Kong Golf Club) to Sheung Shui Railway Station, also to Level Crossing between Fanling and Sheung Shui Railway Stations. The work included margins, channels and 4"/6" macadam tarpainted with chippings.

Fanling-Sha Tau Kok Road.-Strengthening and improving the road surface in the vicinity of Sha Tau Kok Police Station for a distance of about one mile including margins, channels and 4"/6′′ macadam tarpainted with chippings together with provision of subsoil drainage.

Sha Tau Kok-Sheung Shui Patrol Path.-Provision of pass- ing places at regular intervals. Construction of extra span to existing bridge near Sheung Shui.

year:

The following are particulars of the area laid during the

Tarring and chippings

New dry macadam surface

Granolithic paving

Expenditure

Square yards.

167,139

102,945

1,156

$79,538.07

96.

Maintenance of Telephones:-Lines and instruments were maintained in good order. Aerial telephone route at 9 Mile on Castle Peak Road was repaired.

Expenditure

$4,274.39

97. Maintenance of Sewers, Nullahs, etc.:-Sewers, storm water drains, trained nullahs and concrete channels were cleansed, repaired, and maintained in good condition. Sundry repairs were carried out to channels, and improvements effected to rocky streamcourses.

Expenditure

$309.21