124. Tsat Tse Mui Quarry-Extension and Improvements. Under this heading a weighbridge was installed and 10 bins of 4 cubic yards capacity each were provided to improve the present loading arrangements at the Quarry.

Expenditure

$6,191.53

125. Rewiring of Government Buildings.-The following twenty-five buildings were completely rewired for fans and lights (total number of points, 2,292):-Hong Kong Volunteer Headquarters; Nos. 405-407, The Peak; Nos. 1-8 Leighton Hill; Nos. 97, 99, 101, 102, 105 and 107 Wongneicheong Road; Wanchai Market; Wanchai Scavenging Coolie Quarters; Belcher Street Scavenging Coolie Quarters; Hong Kong Magistracy Building; D.S.P.'S Quarters, Central Police Station; Belilios School and Central Market.

Expenditure

$21,245.41

126. Laying Telephone Cable from the main route Victoria Gap-Gough Hill. The old aerial route was replaced by an underground cable.

Expenditure

$5,428.92

127. Laying Telephone Cable between G.P.O. and Cable Hut at Happy Valley.-The cable was laid to supplement an existing one which was too small for its purpose.

Expenditure

$25,155.78

128. Reinstatement of Government Retaining Walls.-This work was referred to in paragraph 113 of last year's Report.

One of the walls on the Tai Hang Road was in bad condition and a contract for taking down about 200 linear feet of the wall and rebuilding it in cement concrete with rubble facework was let to the General Construction Co. on 28.10.33 for a sum of $7,080.00. Good progress was made towards the end of the year.

Expenditure

$4,314.34

129. Central Police Station: Extension to Store. The work consisted of enclosing a portion of the ground floor verandah of the existing Store to provide increased accommodation.

Expenditure

$1,189.90

130. Victoria Hospital: Tennis Court.-The work consisted of relevelling the site, forming channels, and the erection of a wire netting fence.

Expenditure

$2,345.96

Edit History

2026-05-09 14:40:44 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
35 124. Tsat Tse Mui Quarry-Extension and Improvements. Under this heading a weighbridge was installed and 10 bins of 4 cubic yards capacity each were provided to improve the present loading arrangements at the Quarry. Expenditure $6,191.53 125. Rewiring of Government Buildings.-The following twenty-five buildings were completely rewired for fans and lights (total number of points, 2,292):-Hong Kong Volunteer Headquarters; Nos. 405-407, The Peak; Nos. 1-8 Leighton Hill; Nos. 97, 99, 101, 102, 105 and 107 Wongneicheong Road; Wanchai Market; Wanchai Scavenging Coolie Quarters; Belcher Street Scavenging Coolie Quarters; Hong Kong Magistracy Building; D.S.P.'S Quarters, Central Police Station; Belilios School and Central Market. Expenditure $21,245.41 126. Laying Telephone Cable from the main route Victoria Gap-Gough Hill. The old aerial route was replaced by an underground cable. Expenditure $5,428.92 127. Laying Telephone Cable between G.P.O. and Cable Hut at Happy Valley.-The cable was laid to supplement an existing one which was too small for its purpose. Expenditure $25,155.78 128. Reinstatement of Government Retaining Walls.-This work was referred to in paragraph 113 of last year's Report. One of the walls on the Tai Hang Road was in bad condition and a contract for taking down about 200 linear feet of the wall and rebuilding it in cement concrete with rubble facework was let to the General Construction Co. on 28.10.33 for a sum of $7,080.00. Good progress was made towards the end of the year. Expenditure $4,314.34 129. Central Police Station: Extension to Store. The work consisted of enclosing a portion of the ground floor verandah of the existing Store to provide increased accommodation. Expenditure $1,189.90 130. Victoria Hospital: Tennis Court.-The work consisted of relevelling the site, forming channels, and the erection of a wire netting fence. Expenditure $2,345.96
Baseline (Original)
35 124. Tsat Tse Mui Quarry-Extension and Improvements. Under this heading a weighbridge was installed and 10 bins of 4 cubic yards capacity each were provided to improve the present loading arrangements at the Quarry. Expenditure $6,191.53 125. Rewiring of Government Buildings.-The following twenty-five buildings were completely rewired for fans and lights (total number of points, 2,292):-Hong Kong Volunteer Head- quarters; Nos. 405-407, The Peak; Nos. 1-8 Leighton Hill; Nos. 97, 99, 101, 102, 105 and 107 Wongneicheong Road; Wanchai Market; Wanchai Scavenging Coolie Quarters; Belcher Street Scavenging Coolie Quarters; Hong Kong Magistracy Building; D.S.P.'S Quarters, Central Police Station; Belilios School and Central Market. Expenditure $21,245.41 126. Laying Telephone Cable from the main route Victoria Gap-Gough Hill. The old aerial route was replaced by an underground cable. Expenditure $5,428.92 127. Laying Telephone Cable between G.P.O. and Cable Hut at Happy Valley.-The cable was laid to supplement an existing one which was too small for its purpose. Expenditure $25,155.78 128. Reinstatement of Government Retaining Walls.-This work was referred to in paragraph 113 of last year's Report. One of the walls on the Tai Hang Road was in bad condition and a contract for taking down about 200 linear feet of the wall and rebuilding it in cement concrete with rubble facework was let to the General Construction Co. on 28.10.33 for a sum of $7,080.00. Good progress was made towards the end of the year. Expenditure $4,314.34 129. Central Police Station: Extension to Store. The work consisted of enclosing a portion of the ground floor verandah of the existing Store to provide increased accommodation. Expenditure $1,189.90 130. Victoria Hospital: Tennis Court.-The work consisted of relevelling the site, forming channels, and the erection of a wire netting fence. Expenditure $2,345.96
2026-05-09 14:40:44 · Baseline
View content

35

124. Tsat Tse Mui Quarry-Extension and Improvements. Under this heading a weighbridge was installed and 10 bins of 4 cubic yards capacity each were provided to improve the present loading arrangements at the Quarry.

Expenditure

$6,191.53

125. Rewiring of Government Buildings.-The following twenty-five buildings were completely rewired for fans and lights (total number of points, 2,292):-Hong Kong Volunteer Head- quarters; Nos. 405-407, The Peak; Nos. 1-8 Leighton Hill; Nos. 97, 99, 101, 102, 105 and 107 Wongneicheong Road; Wanchai Market; Wanchai Scavenging Coolie Quarters; Belcher Street Scavenging Coolie Quarters; Hong Kong Magistracy Building; D.S.P.'S Quarters, Central Police Station; Belilios School and Central Market.

Expenditure

$21,245.41

126. Laying Telephone Cable from the main route Victoria Gap-Gough Hill. The old aerial route was replaced by an underground cable.

Expenditure

$5,428.92

127. Laying Telephone Cable between G.P.O. and Cable Hut at Happy Valley.-The cable was laid to supplement an existing one which was too small for its purpose.

Expenditure

$25,155.78

128. Reinstatement of Government Retaining Walls.-This work was referred to in paragraph 113 of last year's Report.

One of the walls on the Tai Hang Road was in bad condition and a contract for taking down about 200 linear feet of the wall and rebuilding it in cement concrete with rubble facework was let to the General Construction Co. on 28.10.33 for a sum of $7,080.00. Good progress was made towards the end of the year.

Expenditure

$4,314.34

129. Central Police Station: Extension to Store. The work consisted of enclosing a portion of the ground floor verandah of the existing Store to provide increased accommodation.

Expenditure

$1,189.90

130. Victoria Hospital: Tennis Court.-The work consisted of relevelling the site, forming channels, and the erection of a wire netting fence.

Expenditure

$2,345.96