Portland Street, Prince Edward Road, Reclamation Street, Sai Yeung Choi Street, Sai Yee Street, Shantung Street, Soy Street, San Lau Street, Salisbury Road, Tam Kung Road. Tai Street. Tai Nan Street, Tong Mi Road, Tung Choi Street, Tung Chau Street, Yaumati Ferry, Yim Po Fong Street, Yu Chau Street.

Expenditure

$102,449.03

134. Drainage :-(a) Training Nullahs.--In connexion with the general development of the district the open nullah south of K.I.L. 1527, Lo Lung Hang was arched over.

Expenditure

$922.70

(b) Miscellaneous Drainage Works.-New sewers and storm water drains were constructed to a length of 10,471 feet, varying in diameter from 6″ to 38″, principally in Yaumati, Mongkok, To Kwa Wan and Kau Pui Shek. Reinforced concrete decking was constructed to Waterloo Road Nullah between the Chinese Y.M.C.A. and the drainage depot at Fo Pang, and to Shek Shan Nullah from To Kwa Wan Road to the sea. Parapet walling was erected along the south side of Argyle Street Nullah between Fa Yuen Street and Yim Po Fong Street, Mongkok, and along certain lengths of Sung Wong Toi Road nullah between Ma Tau Chung Road and Pak Tai Street. The number of drain connections made was 484. Many new gullies with flat gully gratings were constructed and connected to the storm water drainage system.

Expenditure

$82,715.38

135. Miscellaneous.-Concrete surfacing at Kowloon Junior School and a few minor works to other buildings were carried out under this head.

1932 Expenditure

$3,958.84

136. Water Works.-The following mains were laid under this heading:-140 lineal feet of 6″ cast iron pipe in Prince Edward Road. 335 lineal feet of 3″ wrought iron pipe in Dundas Street. 960 lineal feet of 3″ wrought iron pipe in Prince Edward Road.

Expenditure

$6,945.22

137. Port Works.-Expenditure under this head was in connexion with investigations on deteriorated cement concrete work in the jetty and island breakwater of the Mong Kok Tsui Typhoon Shelter; marking boundaries of dumping area at Sung Wong Toi, Kowloon City, and other minor works.

Expenditure

$76.63

Edit History

2026-05-09 10:51:09 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
હું 36 Portland Street, Prince Edward Road, Reclamation Street, Sai Yeung Choi Street, Sai Yee Street, Shantung Street, Soy Street, San Lau Street, Salisbury Road, Tam Kung Road. Tai Street. Tai Nan Street, Tong Mi Road, Tung Choi Street, Tung Chau Street, Yaumati Ferry, Yim Po Fong Street, Yu Chau Street. Expenditure $102,449.03 134. Drainage :-(a) Training Nullahs.--In connexion with the general development of the district the open nullah south of K.I.L. 1527, Lo Lung Hang was arched over. Expenditure $922.70 (b) Miscellaneous Drainage Works.-New sewers and storm water drains were constructed to a length of 10,471 feet, varying in diameter from 6″ to 38″, principally in Yaumati, Mongkok, To Kwa Wan and Kau Pui Shek. Reinforced concrete decking was constructed to Waterloo Road Nullah between the Chinese Y.M.C.A. and the drainage depot at Fo Pang, and to Shek Shan Nullah from To Kwa Wan Road to the sea. Parapet walling was erected along the south side of Argyle Street Nullah between Fa Yuen Street and Yim Po Fong Street, Mongkok, and along certain lengths of Sung Wong Toi Road nullah between Ma Tau Chung Road and Pak Tai Street. The number of drain connections made was 484. Many new gullies with flat gully gratings were constructed and connected to the storm water drainage system. Expenditure $82,715.38 135. Miscellaneous.-Concrete surfacing at Kowloon Junior School and a few minor works to other buildings were carried out under this head. 1932 Expenditure $3,958.84 136. Water Works.-The following mains were laid under this heading:-140 lineal feet of 6″ cast iron pipe in Prince Edward Road. 335 lineal feet of 3″ wrought iron pipe in Dundas Street. 960 lineal feet of 3″ wrought iron pipe in Prince Edward Road. Expenditure $6,945.22 137. Port Works.-Expenditure under this head was in connexion with investigations on deteriorated cement concrete work in the jetty and island breakwater of the Mong Kok Tsui Typhoon Shelter; marking boundaries of dumping area at Sung Wong Toi, Kowloon City, and other minor works. Expenditure $76.63
Baseline (Original)
હું 36 Portland Street, Prince Edward Road, Reclamation Street, Sai Yeung Choi Street, Sai Yee Street, Shantung Street, Soy Street, San Lau Street, Salisbury Road, Tam Kung Road. Tai Street. Tai Nan Street, Tong Mi Road, Tung Choi Street, Tung Chau Street, Yaumati Ferry, Yim Po Fong Street, Yu Chau Street. Expenditure $102,449.03 134. Drainage :-(a) Training Nullahs.--In connexion with the general development of the district the open nullah south of K.I.L. 1527, Lo Lung Hang was arched over. Expenditure $922.70 (b) Miscellaneous Drainage Works.-New sewers and storm water drains were constructed to a length of 10,471 feet, varying in diameter from 6′′ to 38", principally in Yaumati, Mongkok, To Kwa Wan and Kau Pui Shek. Reinforced concrete decking was constructed to Waterloo Road Nullah between the Chinese Y.M.C.A. and the drainage depot at Fo Pang, and to Shek Shan Nullah from To Kwa Wan Road to the sea. Parapet walling was erected along the south side of Argyle Street Nullah between Fa Yuen Street and Yim Po Fong Street, Mongkok, and along certain lengths of Sung Wong Toi Road nullah between Ma Tau Chung Road and Pak Tai Street. The number of drain connections made was 484. Many new gullies with flat gully gratings were constructed and connected to the storm water drainage system. Expenditure $82,715.38 185. Miscellaneous.-Concrete surfacing at Kowloon Junior School and a few minor works to other buildings were carried out under this head. 1932 Expenditure 3,958.84 136. Water Works.-The following mains were laid under this heading:-140 lineal feet of 6" cast iron pipe in Prince Edward Road. 335 lineal feet of 3′′ wrought iron pipe in Dundas Street. 960 lineal feet of 3′′ wrought iron pipe in Prince Edward Road. Expenditure $6,945.22 137. Port Works.-Expenditure under this head was in con- nection with investigations on deteriorated cement concrete work in the jetty and island breakwater of the Mong Kok Tsui Typhoon Shelter; marking boundaries of dumping area at Sung Wong Toi, Kowloon City, and other minor works. Expenditure $76.63
2026-05-09 10:51:09 · Baseline
View content

હું

36

Portland Street, Prince Edward Road, Reclamation Street, Sai Yeung Choi Street, Sai Yee Street, Shantung Street, Soy Street, San Lau Street, Salisbury Road, Tam Kung Road. Tai Street. Tai Nan Street, Tong Mi Road, Tung Choi Street, Tung Chau Street, Yaumati Ferry, Yim Po Fong Street, Yu Chau Street.

Expenditure

$102,449.03

134. Drainage :-(a) Training Nullahs.--In connexion with the general development of the district the open nullah south of K.I.L. 1527, Lo Lung Hang was arched over.

Expenditure

$922.70

(b) Miscellaneous Drainage Works.-New sewers and storm water drains were constructed to a length of 10,471 feet, varying in diameter from 6′′ to 38", principally in Yaumati, Mongkok, To Kwa Wan and Kau Pui Shek. Reinforced concrete decking was constructed to Waterloo Road Nullah between the Chinese Y.M.C.A. and the drainage depot at Fo Pang, and to Shek Shan Nullah from To Kwa Wan Road to the sea. Parapet walling was erected along the south side of Argyle Street Nullah between Fa Yuen Street and Yim Po Fong Street, Mongkok, and along certain lengths of Sung Wong Toi Road nullah between Ma Tau Chung Road and Pak Tai Street. The number of drain connections made was 484. Many new gullies with flat gully gratings were constructed and connected to the storm water drainage system.

Expenditure

$82,715.38

185. Miscellaneous.-Concrete surfacing at Kowloon Junior School and a few minor works to other buildings were carried out under this head.

1932 Expenditure

3,958.84

136. Water Works.-The following mains were laid under this heading:-140 lineal feet of 6" cast iron pipe in Prince Edward Road. 335 lineal feet of 3′′ wrought iron pipe in Dundas Street. 960 lineal feet of 3′′ wrought iron pipe in Prince Edward Road.

Expenditure

$6,945.22

137. Port Works.-Expenditure under this head was in con- nection with investigations on deteriorated cement concrete work in the jetty and island breakwater of the Mong Kok Tsui Typhoon Shelter; marking boundaries of dumping area at Sung Wong Toi, Kowloon City, and other minor works.

Expenditure

$76.63