Q 31
main were relaid in Queen's Road, East, outside the Naval Hospital. 318 feet of 4" diameter cast iron main were laid in Yuk Sau Street, Wong Nei Chong. 198 feet of 4" diameter cast iron main were laid in Tsap Tseung Street, Wong Nei Chong, 850 feet of 2" diameter wrought iron piping were laid in Mount Cameron Road, The Peak. A steel plate roof was fixed on the steel service tank at West Point Filters. 698 feet of 11" diameter wrought iron piping were laid to divert stream North of Wong Nei Chong Reservoir into the gauge basin.
Expenditure
$9,786.63
109. Port Works.-Expenditure incurred under this head was for borings taken at Shaukiwan to ascertain the nature of the foundations for a refuse pier. Payment of labour for carrying out miscellaneous minor works was also included.
Expenditure
$566.45
COMMUNICATIONS.
110. 1st Section of new 75' Road between Causeway Bay and Ming Yuen Gardens.-The work comprised the construction of a portion of this 75' Road between a point to the South of I.L. 2358 and a point to the Eastwards of I.L. 2918. The contract was let to Mr. Tang Shui Kwong on 20th July, 1932 for a sum of $231,550.00. Stone as quarried was dumped to the east of M.L. 321 and used in the construction of the rubble mound at North Point and also at the Yacht Club. Cutting was deposited on the foreshore to the North of I.L. 2845 and in the Eastern corner of the old North Point Bathing Beach area.
Progress during the year was good.
1932 Expenditure
MISCELLANEOUS.
$41,811.00
111. Chinese Cemeteries.-Laying out new areas.--Work carried out under this head is also alluded to in paragraph 32 of this Report.
Expenditure
$5,996.28
112. Rewiring of Government Buildings.-Nos. 151 to 156, 160, 403, 404 and 525 Peak; Peak Chair Coolie Quarters; New Junior School; Ellis Kadoorie School; Government Store; Villa Miramere; Victoria Gaol; Aberdeen, Pokfulam and Magazine Gap Police Stations; Nos. 84 to 86 Caine Road Police Quarters; Government Civil Hospital Coolie Quarters; and Hospital Road Scavenging Coolie Quarters were completely rewired for fans and lights.
Expenditure
$23,942.94
Q 31
main were relaid in Queen's Road, East, outside the Naval Hospital. 318 feet of 4" diameter cast iron main were laid in Yuk Sau Street, Wong Nei Chong. 198 feet of 4" diameter cast iron main were laid in Tsap Tseung Street, Wong Nei Chong, 850 feet of 2" diameter wrought iron piping were laid in Mount Cameron Road, The Peak. A steel plate roof was fixed on the steel service tank at West Point Filters. 698 feet of 11" diameter wrought iron piping were laid to divert stream North of Wong Nei Chong Reservoir into the gauge basin.
Expenditure
$9,786.63
દી
109. Port Works.-Expenditure incurred under this head was for borings taken at Shaukiwan to ascertain the nature of the foundations for a refuse pier. Payment of labour for carrying out miscellaneous minor works was also included.
Expenditure
$566.45
COMMUNICATIONS.
110. 1st Section of new 75' Road between Causeway Bay and Ming Yuen Gardens.-The work comprised the construction of a portion of this 75' Road between a point to the South of I.L. 2358 and a point to the Eastwards of I.L. 2918. The contract was let to Mr. Tang Shui Kwong on 20th July, 1932 for a sum of $231,550.00. Stone as quarried was dumped to the east of M.L. 321 and used in the construction of the rubble mound at
at North Point and also at the Yacht Club. Cutting was deposited on the foreshore to the North of I.L. 2845 and in the Eastern corner of the old North Point Bathing Beach
Progress during the year was good.
area.
1932 Expenditure
MISCELLANEOUS.
$41,811.00
111. Chinese Cemeteries.-Laying out
out new
new areas.--Work carried out under this head is also alluded to in paragraph 32 of this Report.
Expenditure
$5,996.28
112. Rewiring of Government Buildings.-Nos. 151 to 156, 160, 403, 404 and 525 Peak; Peak Chair Coolie Quarters; New Junior School; Ellis Kadoorie School; Government Store; Villa Miramere; Victoria Gaol; Aberdeen, Pokfulam and Magazine Gap Police Stations; Nos. 84 to 86 Caine Road Police Quarters; Government Civil Hospital Coolie Quarters; and Hospital Road Scavenging Coolie Quarters were completely rewired for fans and lights.