Q 27

the recurring programme. Major repairs included the following:- Gap Rock Lighthouse - Dismantle and remove old steel wireless mast, and renew chain to large derrick,

Expenditure

$7,441.90

93. Roads and Bridges (Maintenance and Improvements). - The road surfaces of approximately eighty miles of roads were generally maintained in a satisfactory condition. The strengthening and improvement of the road surfaces was continued, an additional layer of 4" macadam being laid over the present surface and tarpainted between the 11 and 12 miles on the Castle Peak Road, and at Mei Po. The general use of sand for tarpainting was abandoned, gravel and granite chippings being substituted. Extensive patching was carried out between Taipo and Sha Tin. An improvement was made to the road alignment near the 5 milestone Taipo Road.

The following are particulars of the areas laid during the year:

Tarring and chipping Square yards 170,000 New dry macadam surfacing 21,672 Expenditure $98,729.26

94. Maintenance of Telephones. - The lines and instruments were maintained in good order.

Expenditure

$4,173.02

95. Maintenance of Sewers, Nullahs, Etc. - The sewers, storm water drains, trained nullahs and concrete channels were cleansed, repaired, and maintained in good condition. Sundry repairs were carried out to channels, and improvements effected to rocky streamcourses.

Expenditure

$79.29

96. Typhoon and Rainstorm Damage. - Only small repairs to a few buildings were carried out under this vote.

Expenditure

$4,689.04

97. Maintenance of Water Works at Fanling. The total quantity of water supplied during the year was 7.68 million gallons compared with 7.97 last year, and equivalent to average consumption of 21,000 gallons per day.

Expenditure

$297.98

Edit History

2026-05-09 10:49:58 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Q 27 the recurring programme. Major repairs included the following:- Gap Rock Lighthouse - Dismantle and remove old steel wireless mast, and renew chain to large derrick, Expenditure $7,441.90 93. Roads and Bridges (Maintenance and Improvements). - The road surfaces of approximately eighty miles of roads were generally maintained in a satisfactory condition. The strengthening and improvement of the road surfaces was continued, an additional layer of 4" macadam being laid over the present surface and tarpainted between the 11 and 12 miles on the Castle Peak Road, and at Mei Po. The general use of sand for tarpainting was abandoned, gravel and granite chippings being substituted. Extensive patching was carried out between Taipo and Sha Tin. An improvement was made to the road alignment near the 5 milestone Taipo Road. The following are particulars of the areas laid during the year: Tarring and chipping Square yards 170,000 New dry macadam surfacing 21,672 Expenditure $98,729.26 94. Maintenance of Telephones. - The lines and instruments were maintained in good order. Expenditure $4,173.02 95. Maintenance of Sewers, Nullahs, Etc. - The sewers, storm water drains, trained nullahs and concrete channels were cleansed, repaired, and maintained in good condition. Sundry repairs were carried out to channels, and improvements effected to rocky streamcourses. Expenditure $79.29 96. Typhoon and Rainstorm Damage. - Only small repairs to a few buildings were carried out under this vote. Expenditure $4,689.04 97. Maintenance of Water Works at Fanling. The total quantity of water supplied during the year was 7.68 million gallons compared with 7.97 last year, and equivalent to average consumption of 21,000 gallons per day. Expenditure $297.98
Baseline (Original)
Q 27 the recurring programme. Major repairs included the follow- ing:-Gap Rock Lighthouse-Dismantle and remove old steel wireless mast, and renew chain to large derrick, Expenditure $7.441.90 93. Roads and Bridges (Maintenance and Improvements).- The road surfaces of approximately eighty miles of roads were generally maintained in a satisfactory condition. The strength- ening and improvement of the road surfaces was continued, an additional layer of 4" macadam being laid over the presen surface and tarpainted between the 11 and 12 miles on the Castle Peak Road, and at Mei Po. The general use of sand for tarpainting was abandoned, gravel and granite chippings being substituted. Extensive patching was carried out between Taipo and Sha Tin. An improvement was made to the road alignment near the 5 milestone Taipo Road. year: The following are particulars of the areas laid during the Tarring and chipping New dry macadam surfacing Expenditure Square yards 170,000 21,672 $98,729.26 94. Maintenance of Telephones.-The lines and instruments were maintained in good order. Expenditure $4,173.02 95. Maintenance of Sewers, Nullahs, Etc.-The sewers, storm water drains, trained nullahs and concrete channels were cleansed, repaired, and maintained in good condition. Sundry repairs were carried out to channels, and improvements effected to rocky streamcourses. Expenditure $79.29 96. Typhoon and Rainstorm Damage.-Only small repairs to a few buildings were carried out under this vote. Expenditure $4,689.04 97. Maintenance of Water Works at Fanling. The total quantity of water supplied during the year was 7.68 million gallons compared with 7.97 last year, and equivalent to average consumption of 21,000 gallons per day. an Expenditure $297.98
2026-05-09 10:49:58 · Baseline
View content

Q 27

the recurring programme. Major repairs included the follow- ing:-Gap Rock Lighthouse-Dismantle and remove old steel wireless mast, and renew chain to large derrick,

Expenditure

$7.441.90

93. Roads and Bridges (Maintenance and Improvements).- The road surfaces of approximately eighty miles of roads were generally maintained in a satisfactory condition. The strength- ening and improvement of the road surfaces was continued, an additional layer of 4" macadam being laid over the presen surface and tarpainted between the 11 and 12 miles on the Castle Peak Road, and at Mei Po. The general use of sand for tarpainting was abandoned, gravel and granite chippings being substituted. Extensive patching was carried out between Taipo and Sha Tin. An improvement was made to the road alignment near the 5 milestone Taipo Road.

year:

The following are particulars of the areas laid during the

Tarring and chipping

New dry macadam surfacing

Expenditure

Square yards

170,000

21,672

$98,729.26

94. Maintenance of Telephones.-The lines and instruments were maintained in good order.

Expenditure

$4,173.02

95. Maintenance of Sewers, Nullahs, Etc.-The sewers, storm water drains, trained nullahs and concrete channels were cleansed, repaired, and maintained in good condition. Sundry repairs were carried out to channels, and improvements effected to rocky streamcourses.

Expenditure

$79.29

96. Typhoon and Rainstorm Damage.-Only small repairs to a few buildings were carried out under this vote.

Expenditure

$4,689.04

97. Maintenance of Water Works at Fanling. The total quantity of water supplied during the year was 7.68 million gallons compared with 7.97 last year, and equivalent to average consumption of 21,000 gallons per day.

an

Expenditure

$297.98