P.W.R. Hong Kong.

Q 20

124. Dredging Foreshores. During the year, No. 1 Grab Dredger worked 296 days and was under repairs 29th October to 5th November, and 1st to 31st December (thirty-nine days). The cost of repairs and replacements amounted to $5,758.05. The dredger removed 34,570 cube yards of silt at an all-in cost of sixty-six cents per cube yard, which includes the cost of transporting and depositing the dredged materials but excludes depreciation. The No. 2 Grab Dredger worked 278 days and was under repairs 1st to 5th January, 26th March to 4th April, 15th to 28th October, and 1st to 31st December (sixty days). The cost of repairs and replacements amounted to $3,853.60. The dredger removed 32,676 cube yards of silt at an all-in cost of 54 cents per cube yard, which includes the cost of transporting and depositing the dredged materials but excludes depreciation. The greater portion of the dredged materials was dumped at Cheung Sha Wan, the remainder at Kowloon Bay near Sung Wong Terrace. Of the total of 67,246 cube yards of silt removed during the year, 46,907 cube yards were dredged from the foreshores and in maintaining the depth of water alongside Public Piers, Refuse Boat Piers and within the Causeway Bay Typhoon Shelter; 16,065 cube yards were dredged in connection with the excavation of trenches for Sea wall foundations at North Point and Jordan Road, the cost of the latter work being charged against Advance Account-Vehicular Ferry: Item (a) Construction of Ferry Piers; the balance of 4,274 cube yards was dredged at K.M.L. No. 85 To Kwa Wan for the Hong Kong China Dock Co., Ltd.-the Co. paid $2,996.48 for this work.

Expenditure

$30,799.87

125. Store Depreciation. The adjustment of store values and reconditioning of old stores have been met from this vote, amounting to $16,073.01. The following sums were credited to this vote:- $13,369.16 being rebate on Freight Charges in connection with stores purchased in England through the Crown Agents: $2,635.57 being the value of stores returned which had been issued prior to 1931. The result showed a net expenditure on this vote of $68.28.

Expenditure

$68.28

126. Boundary Stones.-A statement of the boundary stones fixed is given in paragraph 321 of this Report.

Expenditure

$4,400.95

127. Survey of the Colony-An account of the principal survey work executed during the year is given in paragraph 314 et seq.

Expenditure

$2,851.35

128. Bathing Places. The provision of these facilities was referred to in paragraph 65 of last year's Report. Facilities were provided at Kennedy Town. At Repulse Bay and North Point permission was granted for private enterprise to erect structures.

Expenditure

$4,303.34

Edit History

2026-05-09 08:22:37 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
P.W.R. Hong Kong. Q 20 124. Dredging Foreshores. During the year, No. 1 Grab Dredger worked 296 days and was under repairs 29th October to 5th November, and 1st to 31st December (thirty-nine days). The cost of repairs and replacements amounted to $5,758.05. The dredger removed 34,570 cube yards of silt at an all-in cost of sixty-six cents per cube yard, which includes the cost of transporting and depositing the dredged materials but excludes depreciation. The No. 2 Grab Dredger worked 278 days and was under repairs 1st to 5th January, 26th March to 4th April, 15th to 28th October, and 1st to 31st December (sixty days). The cost of repairs and replacements amounted to $3,853.60. The dredger removed 32,676 cube yards of silt at an all-in cost of 54 cents per cube yard, which includes the cost of transporting and depositing the dredged materials but excludes depreciation. The greater portion of the dredged materials was dumped at Cheung Sha Wan, the remainder at Kowloon Bay near Sung Wong Terrace. Of the total of 67,246 cube yards of silt removed during the year, 46,907 cube yards were dredged from the foreshores and in maintaining the depth of water alongside Public Piers, Refuse Boat Piers and within the Causeway Bay Typhoon Shelter; 16,065 cube yards were dredged in connection with the excavation of trenches for Sea wall foundations at North Point and Jordan Road, the cost of the latter work being charged against Advance Account-Vehicular Ferry: Item (a) Construction of Ferry Piers; the balance of 4,274 cube yards was dredged at K.M.L. No. 85 To Kwa Wan for the Hong Kong China Dock Co., Ltd.-the Co. paid $2,996.48 for this work. Expenditure $30,799.87 125. Store Depreciation. The adjustment of store values and reconditioning of old stores have been met from this vote, amounting to $16,073.01. The following sums were credited to this vote:- $13,369.16 being rebate on Freight Charges in connection with stores purchased in England through the Crown Agents: $2,635.57 being the value of stores returned which had been issued prior to 1931. The result showed a net expenditure on this vote of $68.28. Expenditure $68.28 126. Boundary Stones.-A statement of the boundary stones fixed is given in paragraph 321 of this Report. Expenditure $4,400.95 127. Survey of the Colony-An account of the principal survey work executed during the year is given in paragraph 314 et seq. Expenditure $2,851.35 128. Bathing Places. The provision of these facilities was referred to in paragraph 65 of last year's Report. Facilities were provided at Kennedy Town. At Repulse Bay and North Point permission was granted for private enterprise to erect structures. Expenditure $4,303.34
Baseline (Original)
P.W.R. Hong Kong. Q 20 124. Dredging Foreshores. During the year, No. 1 Grab Dredger worked 296 days and was under repairs 29th October to 5th November, and 1st to 31st December (thirty-nine days). The cost of repairs and replacements amounted to $5,758.05. The dredger removed 34,570 cube yards of silt at an all-in cost of sixty-six cents per cube yard, which includes the cost of transporting and depositing the dredged materials but excludes depreciation. The No. 2 Grab Dredger worked 278 days and was under repairs 1st to 5th January, 26th March to 4th April, 15th to 28th October, and 1st to 31st December (sixty days). The cost of repairs and replacements amounted to $3,853.60. The dredger removed 32,676 cube yards of silt at an all-in cost of 54 cents per cube yard, which includes the cost of transport- ing and depositing the dredged materials but excludes deprecia- tion. The greater portion of the dredged materials was dumped at Cheung Sha Wan, the remainder at Kowloon Bay near Sung Wong Terrace. Of the total of 67,246 cube yards of silt removed during the year, 46,907 cube yards were dredged from the fore- shores and in maintaining the depth of water alongside Public Piers, Refuse Boat Piers and within the Causeway Bay Typhoon Shelter; 16,065 cube yards were dredged in connection with the excavation of trenches for Sea wail foundations at North Point and Jordan Road, the cost of the latter work being charged against Advance Account-Vehicular Ferry: Item (a) Construc- tion of Ferry Piers; the balance of 4,274 cube yards was dredged at K.M.L. No. 85 To Kwa Wan for the Hong Kong China Dock Co., Ltd.-the Co. paid $2,996.48 for this work. Expenditure $30,799.87 125. Store Depreciation. The adjustment of store values and reconditioning of old stores have been met from this vote, amounting to $16,073.01. The following sums were credited to this vote:-$13,369.16 being rebate on Freight Charges in con- nection with stores purchased in England through the Crown Agents: $2,635.57 being the value of stores returned which had been issued prior to 1931. The result showed a net expenditure on this vote of $68.28. Expenditure $68.28 126. Boundary Stones.-A statement of the boundary stones fixed is given in paragraph 321 of this Report. Expenditure $4,400.95 127. Survey of the Colony-An account of the principai survey work executed during the year is given in paragraph 314 ci seq. Expenditure $2,851.35 128. Bathing Places. The provision of these facilities was referred to in paragraph 65 of last year's Report. Facilities were provided at Kennedy Town. At Repulse Bay and North Point permission was granted for private enterprise to erect structures. Expenditure $4,303.34
2026-05-09 08:22:37 · Baseline
View content

P.W.R. Hong Kong.

Q 20

124. Dredging Foreshores. During the year, No. 1 Grab Dredger worked 296 days and was under repairs 29th October to 5th November, and 1st to 31st December (thirty-nine days). The cost of repairs and replacements amounted to $5,758.05. The dredger removed 34,570 cube yards of silt at an all-in cost of sixty-six cents per cube yard, which includes the cost of transporting and depositing the dredged materials but excludes depreciation. The No. 2 Grab Dredger worked 278 days and was under repairs 1st to 5th January, 26th March to 4th April, 15th to 28th October, and 1st to 31st December (sixty days). The cost of repairs and replacements amounted to $3,853.60. The dredger removed 32,676 cube yards of silt at an all-in cost of 54 cents per cube yard, which includes the cost of transport- ing and depositing the dredged materials but excludes deprecia- tion. The greater portion of the dredged materials was dumped at Cheung Sha Wan, the remainder at Kowloon Bay near Sung Wong Terrace. Of the total of 67,246 cube yards of silt removed during the year, 46,907 cube yards were dredged from the fore- shores and in maintaining the depth of water alongside Public Piers, Refuse Boat Piers and within the Causeway Bay Typhoon Shelter; 16,065 cube yards were dredged in connection with the excavation of trenches for Sea wail foundations at North Point and Jordan Road, the cost of the latter work being charged against Advance Account-Vehicular Ferry: Item (a) Construc- tion of Ferry Piers; the balance of 4,274 cube yards was dredged at K.M.L. No. 85 To Kwa Wan for the Hong Kong China Dock Co., Ltd.-the Co. paid $2,996.48 for this work.

Expenditure

$30,799.87

125. Store Depreciation. The adjustment of store values and reconditioning of old stores have been met from this vote, amounting to $16,073.01. The following sums were credited to this vote:-$13,369.16 being rebate on Freight Charges in con- nection with stores purchased in England through the Crown Agents: $2,635.57 being the value of stores returned which had been issued prior to 1931. The result showed a net expenditure on this vote of $68.28.

Expenditure

$68.28

126. Boundary Stones.-A statement of the boundary stones fixed is given in paragraph 321 of this Report.

Expenditure

$4,400.95

127. Survey of the Colony-An account of the principai survey work executed during the year is given in paragraph 314 ci seq.

Expenditure

$2,851.35

128. Bathing Places. The provision of these facilities was referred to in paragraph 65 of last year's Report. Facilities were provided at Kennedy Town. At Repulse Bay and North Point permission was granted for private enterprise to erect structures.

Expenditure

$4,303.34