AnnualReport-1924 — Page 607

Administrative Reports 行政報告書 All AI Reviewed

Resumptions.

Resumptions in connection with Street Widening and Improvement Schemes, &c.,—Continued.

Scheme & Vote debited.

Hongkong,-Continued.

(f.) Scavenging Lanes resumed debited to Vote P.W.E. 50,-Compensation and Resumptions.

Kowloon.

(a.) Street Widenings.

Debited to Vote P.W.E. 104,-Compensation and Resumptions.

(b.) New Streets. Do.

Properties dealt with. | Amount paid. | Area in sq. ft. | Rate per sq. ft. $

Portion of No. 76, Bonham Strand, on IL 1164, S.A. $8,840.00 105.75 81.70 Land required for new 75-foot harbour road through K.M.L. 49 $161,700.00 $23,100.00 7.00 To Kwa Wan Lot 44 $473.97 510 0.93

Remarks.

This area was resumed in order to provide an outlet to the new scavenging lane behind Nos. 18-24, Des Voeux Road, West, the owners of which contributed half the cost of the resumption in 1923.

(o.) Development under the Town Planning Scheme, debited to Vote P.W.E. 104,-Compensation and Resumptions.

In connection with the development of Kowloon under the approved Town Planning Scheme, numerous resumptions were effected on the basis of exchanges.

These exchanges are given in schedule on pages 14 to 21.

Compensation amounting to $78,457.84, covering 40 properties, was paid in respect of the structures on old lots resumed under this arrangement.

Q 58

Edit History

2026-05-07 07:58:57 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Resumptions. Resumptions in connection with Street Widening and Improvement Schemes, &c.,—Continued. Scheme & Vote debited. Hongkong,-Continued. (f.) Scavenging Lanes resumed debited to Vote P.W.E. 50,-Compensation and Resumptions. Kowloon. (a.) Street Widenings. Debited to Vote P.W.E. 104,-Compensation and Resumptions. (b.) New Streets. Do. Properties dealt with. | Amount paid. | Area in sq. ft. | Rate per sq. ft. $ Portion of No. 76, Bonham Strand, on IL 1164, S.A. $8,840.00 105.75 81.70 Land required for new 75-foot harbour road through K.M.L. 49 $161,700.00 $23,100.00 7.00 To Kwa Wan Lot 44 $473.97 510 0.93 Remarks. This area was resumed in order to provide an outlet to the new scavenging lane behind Nos. 18-24, Des Voeux Road, West, the owners of which contributed half the cost of the resumption in 1923. (o.) Development under the Town Planning Scheme, debited to Vote P.W.E. 104,-Compensation and Resumptions. In connection with the development of Kowloon under the approved Town Planning Scheme, numerous resumptions were effected on the basis of exchanges. These exchanges are given in schedule on pages 14 to 21. Compensation amounting to $78,457.84, covering 40 properties, was paid in respect of the structures on old lots resumed under this arrangement. Q 58
Baseline (Original)
Resumptions. Resumptions in connection with Street Widening and Improvement Schemes, &c.,—Continued. Scheme & Vote debited. Hongkong,-Continued. (f.) Scavenging Lanes resum- ed debited to Vote P.W.E. 50,-Compensation and Resump- tions. Kowloon. (a.) Street Widenings. Debited to Vote P.W.E. 104,-Compensation and sumptions. (b.) New Streets. Do. Re- Properties dealt with. Amount paid. Area in Rate per $ sq. ft. sq. ft. $ Portion of No. 76, B¬n- ham Strand, on IL 1164, S.A. 8,840.00 105.75 81.70 The areas required for the various street widening schemes in operation in Kowloon were obtained by grant- ing areas of Crown Land in exchange therefor, either at the rear of the properties or elsewhere in the vicinity. Such exchanges were arranged in all cases of rebuilding in streets affected by widening schemes: particulars of exchanges effected will be found on pages 14 to 21. Land required for new 75-foot harbour road through K.M.L. 49 | 161,700.00 $23,100.00 7.00 Remarks. This area was resumed in order to provide an outlet to the new scavenging lane behind Nos. 18-24, Des Voeux Road, West, the owners of which con- tributed half the cost of the re- sumption in 1923. (o.) Development under the Town Planning Scheme, debited to Vote P.W.E. 104,-Compen- sation and Resumptions. To Kwa Wan Lot 44 473.97 510 0.93 In connection with the development of Kowloon under the approved Town Planning Scheme, numerous resump. tions were effected on the basis of exchanges. These exchanges are given in schedule on pages 14 to 21. Compensation amounting to $78,457.84, covering 40 properties, was paid in respect of the structures on uld lots resumed under this arrangement. Q 58
2026-05-07 07:58:57 · Baseline
View content

Resumptions.

Resumptions in connection with Street Widening and Improvement Schemes, &c.,—Continued.

Scheme & Vote debited.

Hongkong,-Continued.

(f.) Scavenging Lanes resum- ed debited to Vote P.W.E. 50,-Compensation and Resump-

tions.

Kowloon.

(a.) Street Widenings.

Debited to Vote P.W.E.

104,-Compensation and

sumptions.

(b.) New Streets. Do.

Re-

Properties dealt with.

Amount paid.

Area in

Rate per

$

sq. ft.

sq. ft. $

Portion of No. 76, B¬n-

ham Strand, on IL 1164, S.A.

8,840.00

105.75

81.70

The areas required for the various street widening schemes in operation in Kowloon were obtained by grant- ing areas of Crown Land in exchange therefor, either at the rear of the properties or elsewhere in the vicinity. Such exchanges were arranged in all cases of rebuilding in streets affected by widening schemes: particulars of exchanges effected will be found on pages 14 to 21.

Land required for new 75-foot harbour road through K.M.L. 49

| 161,700.00 $23,100.00

7.00

Remarks.

This area was resumed in order to provide an outlet to the new scavenging lane behind Nos. 18-24, Des Voeux Road, West, the owners of which con- tributed half the cost of the re- sumption in 1923.

(o.) Development under the Town Planning Scheme, debited to Vote P.W.E. 104,-Compen- sation and Resumptions.

To Kwa Wan Lot 44

473.97

510

0.93

In connection with the development of Kowloon under the approved Town Planning Scheme, numerous resump. tions were effected on the basis of exchanges.

These exchanges are given in schedule on pages 14 to 21.

Compensation amounting to $78,457.84, covering 40 properties, was paid in respect of the structures on uld lots resumed under this arrangement.