Resumptions.
Resumptions in connection with Street Widening and Improvement Schemes, &c.,—Continued.
Scheme & Vote debited.
Hongkong,-Continued.
(f.) Scavenging Lanes resumed debited to Vote P.W.E. 50,-Compensation and Resumptions.
Kowloon.
(a.) Street Widenings.
Debited to Vote P.W.E. 104,-Compensation and Resumptions.
(b.) New Streets. Do.
Properties dealt with. | Amount paid. | Area in sq. ft. | Rate per sq. ft. $
Portion of No. 76, Bonham Strand, on IL 1164, S.A. $8,840.00 105.75 81.70 Land required for new 75-foot harbour road through K.M.L. 49 $161,700.00 $23,100.00 7.00 To Kwa Wan Lot 44 $473.97 510 0.93Remarks.
This area was resumed in order to provide an outlet to the new scavenging lane behind Nos. 18-24, Des Voeux Road, West, the owners of which contributed half the cost of the resumption in 1923.
(o.) Development under the Town Planning Scheme, debited to Vote P.W.E. 104,-Compensation and Resumptions.
In connection with the development of Kowloon under the approved Town Planning Scheme, numerous resumptions were effected on the basis of exchanges.
These exchanges are given in schedule on pages 14 to 21.
Compensation amounting to $78,457.84, covering 40 properties, was paid in respect of the structures on old lots resumed under this arrangement.