23. The final division of Through and Joint Sectional Traffic Receipts has been agreed between the two Administrations to the end of 1917.

24. The following repairs and renewals were carried out in the Workshops during the year:

Main Line locomotive No. 7 heavy repairs
No. 6 light repairs No. 4 painted.

28 Main Line carriages received light repairs and 9
were painted and varnished.

Heavy repairs were carried out on 2 wagons, 47 wagons
receiving light repairs and 39 painted.

New steel or malthoid roofs were fitted to 8 wagons.

The Fanling Branch Line carriages were also overhauled
and varnished.

25. The following machines and tools were made in the Workshops chiefly from scrap materials:-

1 Boiler stay screwing machine and stay taps.
1 Woodworking lathe.
1 Boiler testing pump.
1 Oil testing machine.
Fire appliances.
18 Lamps for switchstands in loco yard.
1 Electric magnetic separator.
1 pair 45-ton lifting blocks.

26. In May the 5-ton travelling crane was sold and during the year the following old construction plant was disposed of:-

6 Air compressors,
6 Air receivers.
1 134 F Compound wound dynamo and engine.
1 25 h.p. Double cylinder winding engine.
1 30 h.p. Loco multitubular boiler.
1 25 h.p. "Schram" semi loco type multitubular boiler.
W.I. pipes, bends and tee pieces, etc.
Metre gauge crossings.
2 Switchboards.
1 8 h.p. Loco type boiler.

27. There were four accidents of a more or less serious nature
during the year which are included in the following:-

Shunting collisions 5 Coupling failures 4 Engine derailments 2 Coach " 2 Wagon NNP O

Edit History

2026-05-06 19:29:26 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
23. The final division of Through and Joint Sectional Traffic Receipts has been agreed between the two Administrations to the end of 1917. 24. The following repairs and renewals were carried out in the Workshops during the year: Main Line locomotive No. 7 heavy repairs No. 6 light repairs No. 4 painted. 28 Main Line carriages received light repairs and 9 were painted and varnished. Heavy repairs were carried out on 2 wagons, 47 wagons receiving light repairs and 39 painted. New steel or malthoid roofs were fitted to 8 wagons. The Fanling Branch Line carriages were also overhauled and varnished. 25. The following machines and tools were made in the Workshops chiefly from scrap materials:- 1 Boiler stay screwing machine and stay taps. 1 Woodworking lathe. 1 Boiler testing pump. 1 Oil testing machine. Fire appliances. 18 Lamps for switchstands in loco yard. 1 Electric magnetic separator. 1 pair 45-ton lifting blocks. 26. In May the 5-ton travelling crane was sold and during the year the following old construction plant was disposed of:- 6 Air compressors, 6 Air receivers. 1 134 F Compound wound dynamo and engine. 1 25 h.p. Double cylinder winding engine. 1 30 h.p. Loco multitubular boiler. 1 25 h.p. "Schram" semi loco type multitubular boiler. W.I. pipes, bends and tee pieces, etc. Metre gauge crossings. 2 Switchboards. 1 8 h.p. Loco type boiler. 27. There were four accidents of a more or less serious nature during the year which are included in the following:- Shunting collisions 5 Coupling failures 4 Engine derailments 2 Coach " 2 Wagon NNP O
Baseline (Original)
$ 4 23. The final division of Through and Joint Sectional Traffic Receipts has been agreed between the two Administrations to the end of 1917. 24. The following repairs and renewals were carried out in the Workshops during the year: Main Line locomotive No. 7 heavy repairs No. 6 light repairs No. 4 painted. 28 Main Line carriages received light repairs and 9 were painted and varnished. Heavy repairs were carried out on 2 wagons, 47 wagons receiving light repairs and 39 painted. New steel or malthoid roofs were fitted to 8 wagons. The Fanling Branch Line carriages were also overhauled and varnished. 25. The following machines and tools were made in the Workshops chiefly from scrap materials:- the 1 Boiler stay screwing machine and stay taps. 1 Woodworking lathe. 1 Boiler testing pump. 1 Oil testing machine. Fire appliances. 18 Lamps for switchstands in loco yard. 1 Electric magnetic separator. 1 pair 45-ton lifting blocks. 26. In May the 5-ton travelling crane was sold and during year the following old construction plant was disposed of:- 6 Air compressors, 6 Air receivers. 1 134 F Compound wound dynamo and engine. 1 25 h.p. Double cylinder winding engine. 1 30 h.p. Loco multitubular boiler. 1 25 h.p. "Schram" semi loco type multitubular boiler. W.I. pipes, bends and tee pieces, etc. Metre gauge crossings. 2 Switchboards. 1 8 h.p. Loco type boiler. 27. There were four accidents of a more or less serious nature during the year which are included in the following- Shunting collisions Coupling failures 2 Engine derailments Coach " Wagon NNP O 5 4 2 2 "
2026-05-06 19:29:26 · Baseline
View content

$ 4

23. The final division of Through and Joint Sectional Traffic Receipts has been agreed between the two Administrations to the end of 1917.

24. The following repairs and renewals were carried out in the Workshops during the year:

Main Line locomotive No. 7 heavy repairs

No. 6 light repairs No. 4 painted.

28 Main Line carriages received light repairs and 9

were painted and varnished.

Heavy repairs were carried out on 2 wagons, 47 wagons

receiving light repairs and 39 painted.

New steel or malthoid roofs were fitted to 8 wagons.

The Fanling Branch Line carriages were also overhauled

and varnished.

25. The following machines and tools were made in the Workshops chiefly from scrap materials:-

the

1 Boiler stay screwing machine and stay taps.

1 Woodworking lathe.

1 Boiler testing pump.

1 Oil testing machine.

Fire appliances.

18 Lamps for switchstands in loco yard.

1 Electric magnetic separator.

1 pair 45-ton lifting blocks.

26. In May the 5-ton travelling crane was sold and during year the following old construction plant was disposed of:-

6 Air compressors,

6 Air receivers.

1 134 F Compound wound dynamo and engine.

1 25 h.p. Double cylinder winding engine.

1 30 h.p. Loco multitubular boiler.

1 25 h.p. "Schram" semi loco type multitubular boiler.

W.I. pipes, bends and tee pieces, etc.

Metre gauge crossings.

2 Switchboards.

1 8 h.p. Loco type boiler.

27. There were four accidents of a more or less serious nature

during the year which are included in the following-

Shunting collisions

Coupling failures

2

Engine derailments

Coach

"

Wagon

NNP O

5

4

2

2

"

Comments