P.W.E. Hongkong.
Q 60
(xix.) Star Street—Regulating kerbing, laying new channelling, making good carriageway with 4" cement concrete and laying granolithic paving slabs to footways on south side of I.L. 47.
(xx.) Sing Woo Road—Kerbing, channelling and paving footway with granolithic slabs on north side of I.L. 2165.
(xxi.) Bonham Road—Regulating kerbing, laying new channelling and paving footway with granolithic slabs on south and west sides of I.L's 690 and 691.
(xxii.) Pokfulam Road—Regulating kerbing, laying new channelling and 4" cement concrete surfacing on north side of I.L. 757.
(xxiii.) Shaukiwan Road—Kerbing, channelling and macadamizing carriageway on east side of I.L. 1780.
(xxiv.) Lower Albert Road—Regulating kerbing, laying new channelling and making good footway with asphaltum sand carpeting on east side of I.L. 1280.
(xxv.) First and Second Streets—Regulating kerbing, laying new channelling and granolithic paving slabs to footway on north and south sides of I.L's 609 and 627.
(xxvi.) Forming path and steps adjoining G.L. 20, Conduit Road, to give access to I.L. 2205 (completed).
Deduct contribution by lessee of I.L. 2205.
$1,099.14
1,325.00
$445.72
329.16
289.00
280.31
161.91
112.68
110.13
Item (i). This work was carried out in connection with the proposal to render Kennedy Road fit for motor traffic.
Item (ii). This work was carried out to afford an additional means of communication for pedestrians from Queen's Road East to Kennedy Road.
Items (iii)-(xvi) and (xix)-(xxv). These works were rendered necessary by the erection of new buildings in the localities or on the lots mentioned.
Item (xvii). The Tramway Co. having altered their track at this point, it was found desirable to alter the alignment of the kerb, the paving of the footway and surfacing of the carriageway with asphaltum sand carpeting being carried out at the same time.
Item (xviii). The alignment of Pokfulam Road at this point was improved to suit the new boundary wall erected by the University Authorities.
Item (xxvi). This work was fully described in last year's Report (vide page 56, item (v)).
P.W.E. Hongkong.
Q 60
(xix.) Star Street-Regulating kerbing, laying new chaunelling, making good carriageway with 4" cement concrete and laying granolithic paving slabs to footways on south side of I.L. 47,.
(xx.) Sing Woo Road-Kerbing, channelling and paving footway with granolithic slabs on north side of I.L. 2165,
(xxi.) Bonham Road- Regulating kerbing, laying new channelling and paving footway with granolithic slabs on south and west sides of I.L's 690 and 691,
(xxii.) Pokfulam Road-Regulating kerbing, laying new channelling and 4" cement concrete sur- facing on north side of I.L. 757,
(xxiii.) Shaukiwan Road-Kerbing, channelling and macadamizing carriageway on east side of I.L. 1780,
).....
(xxiv.) Lower Albert Road-Regulating kerbing, laying new channelling and making good footway with asphaltum sand carpeting on east side of I.L. 1280,.
(xxv.) First and Second Streets-Regulating kerb- ing, laying new channelling and granolithic paving slabs to footway on north and south sides of I.L's 609 and 627,
(xxvi.) Forming path and steps adjoining G.L. 20, Conduit Road, to give access to IL. 2205 (completed),
Deduct contribution by lessee of
I.L. 2205,
$1,099.14
1,325.00
$445.72
329.16
289.00
280.31
161.91
112.68
110.13
Item (i). This work was carried out in connection with the pro- posal to render Kennedy Road fit for motor traffic.
Item (ii). This work was carried out to afford an additional means of communication for pedestrians from Queen's Road East to Kennedy Road.
Items (iii)-(xvi) and (xix)-(xxv). These works were rendered necessary by the erection of new buildings in the localities or on the lots mentioned.
Item (xvii). The Tramway Co. having altered their track at this point, it was found desirable to alter the alignment of the kerb, the paving of the footway and surfacing of the carriageway with asphaltum sand carpeting being carried out at the same time.
Item (xviii). The alignment of Pokfulam Road at this point was improved to suit the new boundary wall erected by the Univer- sity Authorities.
Item (xxvi). This work was fully described in last year's Report (vide page 56, item (v).).