Q 59

P.W.E. Hongkong.

(vii.) Matheson Street - Forming to new levels, kerbing, channelling and surfacing carriageway with tar macadam and laying granolithic slabs to footway on west side of I.L. 734,

(viii.) Belcher's Street, Holland Street and Praya West - Regulating kerbing, laying new channelling and granolithic paving slabs to footway on north, west and south sides of M.L. 268,

(ix.) Centre, High and Third Streets - Regulating kerbing, laying new channelling and paving footways with granolithic slabs on north, east and west sides of I.L's 628 and 687,

(x.) Yiu Wah Street - Forming to new levels, kerbing, channelling, and laying 4" cement concrete to carriageway and paving footways with granolithic slabs to I.L. 729 (half cost only, the balance being paid by the owners.),

(xi.) Ice House Street - Regulating kerbing, laying new channelling and paving footway with granolithic slabs to south side of I.L. 617,

(xii) Kennedy Road - Kerbing, channelling and extending tar macadam surfacing to carriageway on south side of I.L's 1923, 1945 and 2072,

(xiii) Causeway Bay, adjoining French Convent,

Kerbing, channelling, macadamizing carriageway and laying granolithic paving slabs to east side of L.L. 1418,

$1,880.16 1,862.93 1,830.02 1,816.02 1,763.70 1,565.33 1,421.78

(xiv.) Sutherland Street - Extending granite sett paving on west side of I.L. 71,

1,169.32

(xv.) Sharp Street East - Kerbing, channelling, laying granolithic slab paving to footway and surfacing carriageway with 4" cement concrete on north side of I.L. 734,

(xvi.) Bridges Street - Regulating kerbing, channelling and laying granolithic paving slabs to footway on south side of I.L. 2048 and surfacing, with 4" cement concrete, the scavenging lane on north side of lot,

(xvii.) Catchick Street - Regulating kerbing, laying granolithic slabs to footway and surfacing carriageway with asphaltum sand carpeting on south side of M.L. 242,

(xviii.) Pokfulam Road - Widening No. 1 Bridge in reinforced concrete, laying new channelling and resetting parapet walling in front of Anatomical Laboratory,

872.75 839.88 742.09 732.84

Edit History

2026-05-06 19:12:38 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Q 59 P.W.E. Hongkong. (vii.) Matheson Street - Forming to new levels, kerbing, channelling and surfacing carriageway with tar macadam and laying granolithic slabs to footway on west side of I.L. 734, (viii.) Belcher's Street, Holland Street and Praya West - Regulating kerbing, laying new channelling and granolithic paving slabs to footway on north, west and south sides of M.L. 268, (ix.) Centre, High and Third Streets - Regulating kerbing, laying new channelling and paving footways with granolithic slabs on north, east and west sides of I.L's 628 and 687, (x.) Yiu Wah Street - Forming to new levels, kerbing, channelling, and laying 4" cement concrete to carriageway and paving footways with granolithic slabs to I.L. 729 (half cost only, the balance being paid by the owners.), (xi.) Ice House Street - Regulating kerbing, laying new channelling and paving footway with granolithic slabs to south side of I.L. 617, (xii) Kennedy Road - Kerbing, channelling and extending tar macadam surfacing to carriageway on south side of I.L's 1923, 1945 and 2072, (xiii) Causeway Bay, adjoining French Convent, Kerbing, channelling, macadamizing carriageway and laying granolithic paving slabs to east side of L.L. 1418, $1,880.16 1,862.93 1,830.02 1,816.02 1,763.70 1,565.33 1,421.78 (xiv.) Sutherland Street - Extending granite sett paving on west side of I.L. 71, 1,169.32 (xv.) Sharp Street East - Kerbing, channelling, laying granolithic slab paving to footway and surfacing carriageway with 4" cement concrete on north side of I.L. 734, (xvi.) Bridges Street - Regulating kerbing, channelling and laying granolithic paving slabs to footway on south side of I.L. 2048 and surfacing, with 4" cement concrete, the scavenging lane on north side of lot, (xvii.) Catchick Street - Regulating kerbing, laying granolithic slabs to footway and surfacing carriageway with asphaltum sand carpeting on south side of M.L. 242, (xviii.) Pokfulam Road - Widening No. 1 Bridge in reinforced concrete, laying new channelling and resetting parapet walling in front of Anatomical Laboratory, 872.75 839.88 742.09 732.84
Baseline (Original)
Q 59 P.W.E. Hongkong. (vii.) Matheson Street Forming to new levels, kerbing, channelling and surfacing carriage- way with tar macadam and laying granolithic slabs to footway on west side of I.L. 734, (viii.) Belcher's Street, Holland Street and Praya West-Regulating kerbing, laying new chan- nelling and granolithic paving slabs to foot- way on north, west and south sides of M.L. 268, (ix.) Centre, High and Third Streets-Regulating kerbing, laying new channelling and paving footways with granolithic slabs on north, east and west sides of I.L's 628 and 687, (x.) Yiu Wah Street--Forming to new levels, kerbing, channelling, and laying 4" cement concrete to carriageway and paving footways with granolithic slabs to I.L. 729 (half cost only, the balance being paid by the owners.), (xi.) Ice House Street--Regulating kerbing, lay- ing new channelling and paving footway with granolithic slabs to south side of I.L. 617, (xii) Kennedy Road-Kerbing, channelling and extending tar macadam surfacing to carriage- way on south side of I.L's 1923, 1945 and 2072,. (xiii) Causeway Bay, adjoining French Convent, Kerbing, channelling, macadamizing car- riageway and laying granolithic paving slabs to east side of L.L. 1418, $1,880.16 1,862.93 1,830.02 1,816.02 1,763.70 1,565.33 1,421.78 (xiv.) Sutherland Street-Extending granite sett paving on west side of I.L. 71, 1,169.32 (xv.) Sharp Street East-Kerbing, channelling, laying granolithic slab paving to footway and surfacing carriageway with 4" cement concrete on north side of I.L. 734, (xvi.) Bridges Street-Regulating kerbing, channel- ling and laying granolithic paving slabs to footway on south side of I.L. 2048 and sur- facing, with 4" cement concrete, the scaveng- ing lane on north side of lot,.. (xvii.) Catchick Street-Regulating kerbing, laying granolithic slabs to footway and surfacing carriageway with asphaltum sand carpeting on south side of M.L. 242,.. (xviii.) Pokfulam Road-Widening No. 1 Bridge in reinforced concrete, laying new channelling and resetting parapet walling in front of Anatomical Laboratory,.. 872.75 839.88 742.09 732,84
2026-05-06 19:12:38 · Baseline
View content

Q 59

P.W.E. Hongkong.

(vii.) Matheson Street Forming to new levels, kerbing, channelling and surfacing carriage- way with tar macadam and laying granolithic slabs to footway on west side of I.L. 734, (viii.) Belcher's Street, Holland Street and Praya West-Regulating kerbing, laying new chan- nelling and granolithic paving slabs to foot- way on north, west and south sides of M.L. 268, (ix.) Centre, High and Third Streets-Regulating kerbing, laying new channelling and paving footways with granolithic slabs on north, east and west sides of I.L's 628 and 687,

(x.) Yiu Wah Street--Forming to new levels, kerbing, channelling, and laying 4" cement concrete to carriageway and paving footways with granolithic slabs to I.L. 729 (half cost only, the balance being paid by the owners.), (xi.) Ice House Street--Regulating kerbing, lay- ing new channelling and paving footway with granolithic slabs to south side of I.L. 617,

(xii) Kennedy Road-Kerbing, channelling and extending tar macadam surfacing to carriage- way on south side of I.L's 1923, 1945 and 2072,.

(xiii) Causeway Bay, adjoining French Convent,

Kerbing, channelling, macadamizing car- riageway and laying granolithic paving slabs to east side of L.L. 1418,

$1,880.16

1,862.93

1,830.02

1,816.02

1,763.70

1,565.33

1,421.78

(xiv.) Sutherland Street-Extending granite sett

paving on west side of I.L. 71,

1,169.32

(xv.) Sharp Street East-Kerbing, channelling, laying granolithic slab paving to footway and surfacing carriageway with 4" cement concrete on north side of I.L. 734,

(xvi.) Bridges Street-Regulating kerbing, channel- ling and laying granolithic paving slabs to footway on south side of I.L. 2048 and sur- facing, with 4" cement concrete, the scaveng- ing lane on north side of lot,..

(xvii.) Catchick Street-Regulating kerbing, laying granolithic slabs to footway and surfacing carriageway with asphaltum sand carpeting on south side of M.L. 242,..

(xviii.) Pokfulam Road-Widening No. 1 Bridge in reinforced concrete, laying new channelling and resetting parapet walling in front of Anatomical Laboratory,..

་ ་

872.75

839.88

742.09

732,84

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.