94. Telephone Cable from General Post Office to No. 2 Police Station.—It was not found possible to obtain the cable required for carrying out this work owing to the War. Certain accessories were, however, received and paid for.
1918 Estimates, $5,000.00
1918 Expenditure, $569.06
Total Estimates, $10,500.00
Expenditure to 31/12/18, $569.06
95. Training Nullahs :—
(a). Tsat Tsz Mui.-This work was undertaken on account of complaints of the prevalence of mosquitoes and malaria at the Tsat Tsz Mui Police Station. It comprised the training of the main stream-course and two branch stream-courses passing through Tsat Tsz Mui Village. The channels, which vary in size from 3'6"×3'6" to 10"x1'0", are formed of cement concrete with semi-circular invert and vertical sides.
The total lengths trained were as follows:-
3'6" x 3'6" (arched over) 50 feet 3'6" x 3'6" 205 3'3" x 3'3" 172 3'0" x 3'0" 257 2'3" X 2'3" 1 2'0" x 2'0" 211 Various other sizes 171 52 91 Total 1,1181918 Estimates, $5,000.00
1918 Expenditure, $3,878.71
Total Estimates, $5,000.00
Expenditure to 31/12/18, $3,878.71
(b.) General Works.-The following is a statement of the works carried out under this heading:-
(i.) Training stream-course south of Barker Road and west of Victoria Hospital (completed) 361 $983.25 (ii) Improving nullah south of May Road and west of Tregunter Mansions (completed) 76 $932.03 (iii) Improving nullah in Stone Nullah Lane south of Kennedy Road (completed) 110 $690.67 (iv.) Training stream-course west of R. B. L's 93 and 102, Barker Road, (completed) 216 $307.89 (v.) Constructing east wall and invert to No. 7 Nullah, Sai Wan Ho, opposite S. I. L's 420-422 (completed) 168 $2,315.27 (vi.) Improving nullah south of May Road above forestry path and south-east of I. L. 2139 (completed) 199 $1,008.34Q 61
P.W.E. Hongkong.
94. Telephone Cable from General Post Office to No. 2 Police Station.—It was not found possible to obtain the cable required for carrying out this work owing to the War. Certain accessories were, however, received and paid for.
1918 Estimates,
.$5,000.00
1918 Expenditure,
569.06
Total Estimates, Expenditure to
31/12/18,
$10,500.00
569.06
95. Training Nullahs :—
(a). Tsat Tsz Mui.-This work was undertaken on account of complaints of the prevalence of mosquitoes and malaria at the Tsat Tsz Mui Police Station. It comprised the training of the main stream-course and two branch stream-courses passing through Tsat Tsz Mui Village. The channels, which vary in size from 3'6"×3′ 6" to 10"x1'0", are formed of cement concrete with semi-circular invert and vertical sides.
The total lengths trained were as follows:-
3'6" x 3'6" (arched over)... 50 feet
3'6" x 3'6".
3'3" x 3'3".
3'0" x 3'0".
2'3" X 2'3".
2'0" x 2'0"..
Various other sizes,
Total,
205
172 JJ
>>
257
1
.. 211
>
171
52 91
...1,118
"}
1918 Estimates,
1918 Expenditure, ...
$5,000.00 Total Estimates,
$5,000.00
3,878.71
Expenditure to
31/12/18,
3,878.71
(b.) General Works.-The following is a statement of the works
carried out under this heading:-
(i.) Training stream-course south of Barker Road
and west of Victoria Hospital (completed),.. 361 (ii) Improving nullah south of May Road and west of Tregunter Mansions (completed),... (iii) Improving nullah in Stone Nullah Lane south of Kennedy Road (completed), (iv.) Training stream-course west of R. B. L's 93 and 102, Barker Road, (completed), (v.) Constructing east wall and invert to No. 7 Nullah, Sai Wan Ho, opposite S. I. L's 420-422 (completed),
•
(vi.) Improving nullah south of May Road above forestry path and south-east of I. L. 2139 (completed),
+
Length Expendi- trained Lin. Ft.
ture.
$
983.25
76
932.03
110
690.67
216
307.89
168 2,315.27
199 1,008.34