25 88.

Cue on on

465

he

"was made to limewash ceilings and so

on. Even

"stair linings and nails on walls had to be whitewashed

"I had also to put up scaffoldings to limewash the

"walls of backyards right up to the roof. I got so

"disgusted with the job after doing it for a month or

"so that I gave up the contract after losing about

"$800. Sham Iu finally took over my work again at

$2,50 per floor. He was not required to limewash

"ceilings nor r of, and in the case of hackyarda he

"had only to limewash up to the first floor. He had not

"to put up acaffoldings at all.

"The coolies that I employed to do the work were the

"BAMS coolies as those employed by Shai Iu.

"Even concrete works done by Sham Iu and Foo Sik are

*readily passed by the Inspectors. The prices charged

"by these two contractors are about 30% higher than

"other contractors.

"

W

Interpreted to Au On. Signed. J. Dyer Ball.

Read over and signed before the Commission. 4.1.07

signed. B. A. Hewatt. Chairman.

Signed in Chinese.

208 $20.

Is that correct?

A.

Yes.

$39.

A.

Will you sign it as being correct ?

Yes.

34 Q.

Alright, sign it.

PUBLIC RECORD OFFICE

Reference:-

O. 537

20852

2083-3

20854

Statement signed.

Mr Shelton Tooper:- Did you used to do linawashing for people who owned L0851",

houses, besides the Sanitary Board ?

How much did you charge them per floor ?

$1.80.

20856

Did you not find that the Sanitary Board were more 20157

particular with regard to the plague stricken houses,

and required them to be done better than the private

A.

Yes.

56 a.

A.

74.

COPYRIGHT PHOTOGRAPH - NOT TO DE

OUT!

WYCH OF THE PUBLIC

PHOTOGRAPHICALLY WITH

371

RECORD OFFICE, LONDON

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.