2
Regulation.
30.
31.
Ventilating pipes
32.
Rain water pipes
33.
34.
Anti-syphonage pipea
Rain water pipes for verandaha or balconies
Materials for pipes
4+
+
---
-~1
Tor
++
+
++
35.
Connexions of pipes, etc.
་་་
...
36.
Fixing of pipes
37.
Pipes in ducts
www
36.
Eaves gutters
...
ተቀነ
*
ཨ-།
3
Page.
28
28
A
28
28
Page.
Regulation.
18
18
*
MAN
20
****AR RÁ A
PART VI.
Cesspools.
19
69.
Situation of cesspools
។
70.
19
Disposal of contents
4++
20
71.
Capacity
-
១.
+
+4
你
Construction
www
20
20
20
73.
74.
PART VII.
Testing of drainage works.
Testing of drainage work and procedure thereupon Power of Building Authority to require drainage trenches to be
opened
+++
PART IV. Drainage works,
29
29
39.
Drainage of buildings 4+
21
40.
Disposal of foul water ...
A
21
41.
Disposal of surface water
21
41.
гия
---
Pipes carrying surface water not to discharge across surface of
footpath
75.
งง
21
43.
Disposal of sub-soil water
21
Ни
+1 7 1
44.
Materials for drains, etc.
НИИ
H1
21
16.
45.
Sub-soil water drains
22
LLL
1+1
1
46.
Size of drains
22
77.
11
Pru
++
НИЙ
47.
Laying of drains and sewers
12
TB.
48.
Fall of drains ...........
23
PART VIII.
Certain work to be carried out by the Building Authority and recovery of cost thereof.
Building Authority required to make every connexion of drain and private sewer to public sewer of nullah and recovery of cost thereof Building Authority required to fix every disconnecting trap, etc, and
recovery of cost Building Authority required to carry out any work to be carried out
on unleased Crown land...
Powers of Building Authority in event of contravention of regulations
www
***
1
30
30
31
31
14+
49.
Junction of drains
23
ны
50.
Joints
23
་་་
**-
PART IX. Lotrines.
31.
Inlets to draine
23
79
52.
Ventilation
7.4
www
And
kk
60.
53.
No traps between ventilated points
++
-h
+4
LEI
24
$1.
54.
55.
56.
57.
Drains and sewers under buildings, cic. Maobolcs and cleaning eyes to be provided
Construction of manholes
Disconnecting traps
24
82.
34
Interpretation
Latrines be provided with doors
Doors to open into open air, etc, Lighting and ventilation
Pre
31
***
31
+
་་
W
++
INN
83.
Floors
4
L
N
KA
24
***
NA
។ ៧ ១
$4.
Internal surfaces
24
ᎰᏎᎰ
85.
58.
Gullles
25
86.
59.
Cleaning eyea
www
W
+++
-- +++
26
Walls of access to latrine fitments Design and construction of latrine fitment in relation to receptacle
for excrement
Tự
NAN
Ина
***
T
++
60.
Filios in of drainage trenches
26
27.
Receptacles for excrement
***
MAN
ZZZZ888 8*
31
33
32
32
32
33
61.
Surface water channels
www
kre
સ.
+
Power of Building Authority to permit door of latrine to open onto or opening required by regulation 82 to communicate with uncoclosed verandab, etc.
༥༥ ༈
33
62.
Disposal of effluent
63.
Situation of septic tanks
FART V. Septic tanks.
НИЙ
-
164.
Design
*
་་་
65.
Capacity
+
66.
Construction
...
www
TIT
67.
Dip pipes
68.
Ventilation
++
+++
+++
LJ
+
ARA SAAS
26
25
PART X. Miscellaneous,
29.
26
90.
26
***
www
91.
17
Power of Building Authority to prohibit installation of soil fitments. Power of Building Authority to require provision of neutralizing
tanks, etc. Certain regulations not to apply to soil fitments flushed with water
from waterworks чл
33
*4
....
33
34
27
90
Prescribed period for purposes of section 26A of the Ordinance
34
No comments yet.
Private notes are available after approval.