2

Regulation.

30.

31.

Ventilating pipes

32.

Rain water pipes

33.

34.

Anti-syphonage pipea

Rain water pipes for verandaha or balconies

Materials for pipes

4+

+

---

-~1

Tor

++

+

++

35.

Connexions of pipes, etc.

་་་

...

36.

Fixing of pipes

37.

Pipes in ducts

www

36.

Eaves gutters

...

ተቀነ

*

ཨ-།

3

Page.

28

28

A

28

28

Page.

Regulation.

18

18

*

MAN

20

****AR RÁ A

PART VI.

Cesspools.

19

69.

Situation of cesspools

70.

19

Disposal of contents

4++

20

71.

Capacity

-

១.

+

+4

Construction

www

20

20

20

73.

74.

PART VII.

Testing of drainage works.

Testing of drainage work and procedure thereupon Power of Building Authority to require drainage trenches to be

opened

+++

PART IV. Drainage works,

29

29

39.

Drainage of buildings 4+

21

40.

Disposal of foul water ...

A

21

41.

Disposal of surface water

21

41.

гия

---

Pipes carrying surface water not to discharge across surface of

footpath

75.

งง

21

43.

Disposal of sub-soil water

21

Ни

+1 7 1

44.

Materials for drains, etc.

НИИ

H1

21

16.

45.

Sub-soil water drains

22

LLL

1+1

1

46.

Size of drains

22

77.

11

Pru

++

НИЙ

47.

Laying of drains and sewers

12

TB.

48.

Fall of drains ...........

23

PART VIII.

Certain work to be carried out by the Building Authority and recovery of cost thereof.

Building Authority required to make every connexion of drain and private sewer to public sewer of nullah and recovery of cost thereof Building Authority required to fix every disconnecting trap, etc, and

recovery of cost Building Authority required to carry out any work to be carried out

on unleased Crown land...

Powers of Building Authority in event of contravention of regulations

www

***

1

30

30

31

31

14+

49.

Junction of drains

23

ны

50.

Joints

23

་་་

**-

PART IX. Lotrines.

31.

Inlets to draine

23

79

52.

Ventilation

7.4

www

And

kk

60.

53.

No traps between ventilated points

++

-h

+4

LEI

24

$1.

54.

55.

56.

57.

Drains and sewers under buildings, cic. Maobolcs and cleaning eyes to be provided

Construction of manholes

Disconnecting traps

24

82.

34

Interpretation

Latrines be provided with doors

Doors to open into open air, etc, Lighting and ventilation

Pre

31

***

31

+

་་

W

++

INN

83.

Floors

4

L

N

KA

24

***

NA

។ ៧ ១

$4.

Internal surfaces

24

ᎰᏎᎰ

85.

58.

Gullles

25

86.

59.

Cleaning eyea

www

W

+++

-- +++

26

Walls of access to latrine fitments Design and construction of latrine fitment in relation to receptacle

for excrement

Tự

NAN

Ина

***

T

++

60.

Filios in of drainage trenches

26

27.

Receptacles for excrement

***

MAN

ZZZZ888 8*

31

33

32

32

32

33

61.

Surface water channels

www

kre

સ.

+

Power of Building Authority to permit door of latrine to open onto or opening required by regulation 82 to communicate with uncoclosed verandab, etc.

༥༥ ༈

33

62.

Disposal of effluent

63.

Situation of septic tanks

FART V. Septic tanks.

НИЙ

-

164.

Design

*

་་་

65.

Capacity

+

66.

Construction

...

www

TIT

67.

Dip pipes

68.

Ventilation

++

+++

+++

LJ

+

ARA SAAS

26

25

PART X. Miscellaneous,

29.

26

90.

26

***

www

91.

17

Power of Building Authority to prohibit installation of soil fitments. Power of Building Authority to require provision of neutralizing

tanks, etc. Certain regulations not to apply to soil fitments flushed with water

from waterworks чл

33

*4

....

33

34

27

90

Prescribed period for purposes of section 26A of the Ordinance

34

Share This Page