1929 — Page 53

Blue Books 香港計冊 All AI Reviewed

SPECIFICATION OF TAXES, DUTIES, &c.

Act of Colonial Legislature or other Authority under which levied.

SURVEY OF STEAMSHIPS—Continued

(A double-ended boiler is to be counted as two single-ended boilers).

Survey Fees

Item Fee Notes
Survey of marine boilers $30 See Regulation 17.
Survey of mountings for one marine boiler $15
For every additional similar set $25
Survey of one evaporator $15
Survey of one food heater $15
Survey of one food filter $15
Survey of one distiller $15
Survey of one water circulator $15
For each additional evaporator, food heater, food filter, distiller or water circulator $20
Survey of an installation for burning oil fuel $40 plus $20 for first boiler, minimum
For every additional boiler $20
Survey during construction of heaters and filters for use in connection with oil fuel installations, for each item inspected $5
Survey of one or two safety valves $10
For every additional similar safety valve included in the same order $5
Inspection of finished manhole doors and compensating rings, for the first 15, or portion of 15, inspected at the same time $24
For each additional 15, or portion of 15, included in the same order and inspected at the same time $20

Note: A door with its own ring is counted as one article; separate doors and rings as one each.

TEST AND INSPECTION OF STEEL AND OTHER MATERIALS WHEN CERTIFICATES OF TESTS ARE NOT PRODUCED (Table C)

Ordinance 10 of 1899.

Fees

Item Fee
For each additional visit beyond two made by the Surveyor in connection with the tests of forgings, plates, bars, etc. $228
Inspection and tests of one or two steel furnaces $10
For each additional furnace included in the same order $20
Inspection and tests of one or two steel forgings, or steel castings for stem, stern-post, rudder, etc., if made by the same maker $10
For each additional forging, or casting as the case may be, by the same maker, included in the same order $20
Witnessing tests of solid drawn steel steam pipes, for each 15, or portion of 15, tests of the material made $10
For each 30, or portion of 30, pipes tested by hydraulic pressure $20
Inspection of wrought iron steam pipes, including hydraulic test, for each 15, or portion of 15, pipes inspected $20
Inspection and tests of boiler tubes subject to external pressure: Lapwelded iron tubes and lapwelded or solid drawn steel tubes for which a stress greater than that allowed for iron is not required, for the first 100, or part of 100, tubes $20
For each succeeding 100, or part of 100, tubes $15

---

Page 51

Edit History

2026-07-14 12:46:16 · NVIDIA / nvidia/nemotron-3-ultra-550b-a55b
Live
View comparison
AI Proofread
SPECIFICATION OF TAXES, DUTIES, &c. Act of Colonial Legislature or other Authority under which levied. SURVEY OF STEAMSHIPS—Continued (A double-ended boiler is to be counted as two single-ended boilers). Survey Fees Item Fee Notes Survey of marine boilers $30 See Regulation 17. Survey of mountings for one marine boiler $15 For every additional similar set $25 Survey of one evaporator $15 Survey of one food heater $15 Survey of one food filter $15 Survey of one distiller $15 Survey of one water circulator $15 For each additional evaporator, food heater, food filter, distiller or water circulator $20 Survey of an installation for burning oil fuel $40 plus $20 for first boiler, minimum For every additional boiler $20 Survey during construction of heaters and filters for use in connection with oil fuel installations, for each item inspected $5 Survey of one or two safety valves $10 For every additional similar safety valve included in the same order $5 Inspection of finished manhole doors and compensating rings, for the first 15, or portion of 15, inspected at the same time $24 For each additional 15, or portion of 15, included in the same order and inspected at the same time $20 Note: A door with its own ring is counted as one article; separate doors and rings as one each. TEST AND INSPECTION OF STEEL AND OTHER MATERIALS WHEN CERTIFICATES OF TESTS ARE NOT PRODUCED (Table C) Ordinance 10 of 1899. Fees Item Fee For each additional visit beyond two made by the Surveyor in connection with the tests of forgings, plates, bars, etc. $228 Inspection and tests of one or two steel furnaces $10 For each additional furnace included in the same order $20 Inspection and tests of one or two steel forgings, or steel castings for stem, stern-post, rudder, etc., if made by the same maker $10 For each additional forging, or casting as the case may be, by the same maker, included in the same order $20 Witnessing tests of solid drawn steel steam pipes, for each 15, or portion of 15, tests of the material made $10 For each 30, or portion of 30, pipes tested by hydraulic pressure $20 Inspection of wrought iron steam pipes, including hydraulic test, for each 15, or portion of 15, pipes inspected $20 Inspection and tests of boiler tubes subject to external pressure: Lapwelded iron tubes and lapwelded or solid drawn steel tubes for which a stress greater than that allowed for iron is not required, for the first 100, or part of 100, tubes $20 For each succeeding 100, or part of 100, tubes $15 --- Page 51
Baseline (Original)
(A 51 ) SPECIFICATION OF TAXES, DUTIES, &c. Act of Colonial Legislature or other Authority andar which levied. SURVEY OF STEAMSHIPS,—Continued, Item. (A double-ended boiler is to be counted as two single-ended boilers). Survey of marine boilers Survey of mountings for one marine boiler for every additional similar set Survey of one evaporator Survey of one food heater Survey of one food filter... - Survey of one distiller..... Survey of one water circulator ... J : : Fee. See Regula tion 17. $ 30 15 25 15 15 15 15 15 29 60 20 for each additional evaporator, food heater, food filter, distiller or water circulator Survey of an installation for burning oil fuel $40 plus $20 for first boiler, minimum for every additional boiler *** (A donlile-ended boiler is to be counted as two single-ended boilers). Survey during construction of heaters and filters for use in connection with oil fuel installations, for each item inspected. Survey of one or two safety valves - - - **+ For every additional similar safety valve included in the same order Inspection of finished manhole doors and compensating rings,-for the first 15, or portion of 15, inspecfed at the same time....... for each additional 15, or portion of 15, included in thej same order and inspected at the same time Test and Inspection of Steel and Other Materials when Certificates of Tests are not Produced. Witnessing tests of steel or iron plutes of bars.-15 plates or bars, or portion thereof, tested -- Witnessing tests or steel or iron plates and burs included in one and the same order and made at the same works,-15 plates and bars in the aggreate, or portion thereof, tested ... Witnessing special bending tests of a set plates, etc. (ie, testsi additional to those usually required by the Board of Trade),—for. 15 plates, or portion thereof, tested Witnessing tests of steel forgings for an engine when all the forgings are made by the same maker, and not more than two visits by the Surveyor are required,-for 15 forgings, or portion thereof, tested A door with its own ring is counted as one article, separate doors and rings as one each. urf;S 5 10 5 24 20 10 12 0 20 20 12 3 20 20 Ordinance 10 of 1899. Table C For each additional visit beyond two made by the Surveyor in con- nection with the tests of forgings, plates, bars, etc. Inspection and tests of one or two steel Turnaces for each additional fornace included in the same order Inspection and tests of one or two steel forgings, or steel castings for slem stern-post, radder, etc., if made by the same maker 228 10 20 10 20 for each additional forging, or casting as the case may be, by the same maker, included in the same order Witnessing tests of solid drawn steel steam pipes,-for each 15, or portion of 15, tests of the material made for each 30, or portion of 30, pipes tested by hydraulic pressure Inspection of wrought iron steam pipes, including hydraulic test,- for each 15, or portion of 15, pipes inspected... Inspection and tests of boiler tubes subject to external pressure; Lapwelded iron tubes and lapwelded or solid drawn steel tubes for which a stress greater than that allowed for iron is not required, for the first 100, or part of 100, tubes for each succeeding 100, or part of 100, tubes 10 20 20 20 20 15 51
2026-07-14 12:46:16 · Baseline
View content

(A 51 )

SPECIFICATION OF TAXES, DUTIES, &c.

Act of Colonial Legislature or other Authority andar which levied.

SURVEY OF STEAMSHIPS,—Continued,

Item.

(A double-ended boiler is to be counted as two single-ended boilers).

Survey of marine boilers

Survey of mountings for one marine boiler

for every additional similar set

Survey of one evaporator

Survey of one food heater

Survey of one food filter...

-

Survey of one distiller.....

Survey of one water circulator

...

J

:

:

Fee.

See Regula

tion 17.

$ 30

15

25

15

15

15

15

15

29

60

20

for each additional evaporator, food heater, food filter, distiller

or water circulator

Survey of an installation for burning oil fuel $40 plus $20 for first

boiler, minimum

for every additional boiler

***

(A donlile-ended boiler is to be counted as two single-ended boilers).

Survey during construction of heaters and filters for use in connection

with oil fuel installations, for each item inspected.

Survey of one or two safety valves

-

-

-

**+

For every additional similar safety valve included in the same

order Inspection of finished manhole doors and compensating rings,-for

the first 15, or portion of 15, inspecfed at the same time.......

for each additional 15, or portion of 15, included in thej

same order and inspected at the same time

Test and Inspection of Steel and Other Materials when Certificates of Tests are not Produced.

Witnessing tests of steel or iron plutes of bars.-15 plates or bars, or

portion thereof, tested

--

Witnessing tests or steel or iron plates and burs included in one and the same order and made at the same works,-15 plates and bars in the aggreate, or portion thereof, tested ...

Witnessing special bending tests of a set plates, etc. (ie, testsi additional to those usually required by the Board of Trade),—for. 15 plates, or portion thereof, tested

Witnessing tests of steel forgings for an engine when all the forgings are made by the same maker, and not more than two visits by the Surveyor are required,-for 15 forgings, or portion thereof, tested

A door with its own ring is counted as one article, separate doors and rings as one each.

urf;S

5

10

5

24

20

10

12 0

20

20

12 3

20

20

Ordinance 10 of 1899.

Table C

For each additional visit beyond two made by the Surveyor in con-

nection with the tests of forgings, plates, bars, etc.

Inspection and tests of one or two steel Turnaces

for each additional fornace included in the same order Inspection and tests of one or two steel forgings, or steel castings for

slem stern-post, radder, etc., if made by the same maker

228

10

20

10

20

for each additional forging, or casting as the case may be, by

the same maker, included in the same order Witnessing tests of solid drawn steel steam pipes,-for each 15, or

portion of 15, tests of the material made

for each 30, or portion of 30, pipes tested by hydraulic pressure Inspection of wrought iron steam pipes, including hydraulic test,- for

each 15, or portion of 15, pipes inspected...

Inspection and tests of boiler tubes subject to external pressure;

Lapwelded iron tubes and lapwelded or solid drawn steel tubes for which a stress greater than that allowed for iron is not required, for the first 100, or part of 100, tubes for each succeeding 100, or part of 100, tubes

10

20

20

20

20

15

51

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.