12

13

Purpore or service,

Fees.

Purpose or service.

$

Fees, $

Similar tanks not forming part of the ship's structure, per tank

300.00

(4) Cofferdam spaces forming part of the

ship's structure, per cofferdam

11. For survey of castings or forgings for stem, slera post rudder or propeller, inspection and test-

370.00

(e) Oil fuel beaters and Alters for the in connexion with oil fuel installations, each item

(a) One forging or casting, or two if made by the same maker and tested at the same time

235.00

60.00

(A Dily waler separators; examination of design, witnessing hydraulic test and in- spection of appliance

(6) For each additional Item by the same

maker included in the same order Note: All blades for one propeller count as

one item.

115.00

235.00

(g) Pressure gauges; euch gauge inspected

with minimum of 4 for each visit

120.00

(A) Reversing and reduction gear-box, for

12 Engine casting and forging superheater headers or similar items, inspection and material tes

use with engines up to 150 B.H.P.

170.00

() Safety valves; one of lava complete sets

115,00

(a) For each 13, or part af 15, tests of

items of a kind

235.00

For every additional similar set included in the same arder

60.00

(6) For each additional visit beyond two made by the surveyor for the above tests

115.00

6. For survey of steering gar

Steering gear, main and auxiliary, complete ... SE5.00

2. For survey of superheaters for boilers —–—–—–

13. For witnessing lests of a new electrode in- terided for use on parts of ships' bulls which are of primary structural importance

1,280.00

(2) Superheater for a single-ended boiler (b) For every additional superheater for single-ended bailers in the same ship

325.00

265,00

(4. Flanged or worked plates, compensation

rings and manhole doors, inspection of the Binished work-

Nore: A double-ended boiler is counted as

two single-coded boilers.

$. For survey of watertight doors-

Watertight doors, one or two if lested at the same time

115.00

(a) For the first 15 items, or part of 15

inspected at the same time

235.00

(6) For each additional 15 llems, or part of

13

115.00

Note: A door with its own ring, inspected

Together, count as one item,

9. For survey of bars, plates or rivets, witnessing

tensile and bend test w

15. Fumaces, inspection and witnessing material

Bach 15 or part of 15 items tested

Note: When they are for the same order and made at the same works, the fee for 15 items tested may include bars, plates and riverts, in the aggregate.

235.00

tests-

(a) For first two or less

235.00

(b) For each additional furnace in the same

order

115.00

10. For survey of bojler and superheater tubes subject to internal or external pressure, in- spection, hydraulic and ductility tests-

16. Steam and feed pipes, inspection and material

LestsTM-

(4) For each 15, or part of 15, tests

235.00

(4) For 100 tubes or part of 100 m (b) For every additional 100 tubes or part

of 100

235.00

(b) For each additional visit beyond two made by the surveyor in connexion with the above lesta

115.00

115.00

Note: For the material tests see under steam

and feed pipes.

(c) For steam and feed pipes: hydraulic tests for each 30 pipes, or part of 30, lested

235.00