12
13
Purpore or service,
Fees.
Purpose or service.
$
Fees, $
Similar tanks not forming part of the ship's structure, per tank
300.00
(4) Cofferdam spaces forming part of the
ship's structure, per cofferdam
11. For survey of castings or forgings for stem, slera post rudder or propeller, inspection and test-
370.00
(e) Oil fuel beaters and Alters for the in connexion with oil fuel installations, each item
(a) One forging or casting, or two if made by the same maker and tested at the same time
235.00
60.00
(A Dily waler separators; examination of design, witnessing hydraulic test and in- spection of appliance
(6) For each additional Item by the same
maker included in the same order Note: All blades for one propeller count as
one item.
115.00
235.00
(g) Pressure gauges; euch gauge inspected
with minimum of 4 for each visit
120.00
(A) Reversing and reduction gear-box, for
12 Engine casting and forging superheater headers or similar items, inspection and material tes
use with engines up to 150 B.H.P.
170.00
() Safety valves; one of lava complete sets
115,00
(a) For each 13, or part af 15, tests of
items of a kind
235.00
For every additional similar set included in the same arder
60.00
(6) For each additional visit beyond two made by the surveyor for the above tests
115.00
6. For survey of steering gar
Steering gear, main and auxiliary, complete ... SE5.00
2. For survey of superheaters for boilers —–—–—–
13. For witnessing lests of a new electrode in- terided for use on parts of ships' bulls which are of primary structural importance
1,280.00
(2) Superheater for a single-ended boiler (b) For every additional superheater for single-ended bailers in the same ship
325.00
265,00
(4. Flanged or worked plates, compensation
rings and manhole doors, inspection of the Binished work-
Nore: A double-ended boiler is counted as
two single-coded boilers.
$. For survey of watertight doors-
Watertight doors, one or two if lested at the same time
115.00
(a) For the first 15 items, or part of 15
inspected at the same time
235.00
(6) For each additional 15 llems, or part of
13
115.00
Note: A door with its own ring, inspected
Together, count as one item,
9. For survey of bars, plates or rivets, witnessing
tensile and bend test w
15. Fumaces, inspection and witnessing material
Bach 15 or part of 15 items tested
Note: When they are for the same order and made at the same works, the fee for 15 items tested may include bars, plates and riverts, in the aggregate.
235.00
tests-
(a) For first two or less
235.00
(b) For each additional furnace in the same
order
115.00
10. For survey of bojler and superheater tubes subject to internal or external pressure, in- spection, hydraulic and ductility tests-
16. Steam and feed pipes, inspection and material
LestsTM-
(4) For each 15, or part of 15, tests
235.00
(4) For 100 tubes or part of 100 m (b) For every additional 100 tubes or part
of 100
235.00
(b) For each additional visit beyond two made by the surveyor in connexion with the above lesta
115.00
115.00
Note: For the material tests see under steam
and feed pipes.
(c) For steam and feed pipes: hydraulic tests for each 30 pipes, or part of 30, lested
235.00