Q 91

A survey of the North Point Reclamation--setting out the new 100 ft. road and fixing and co-ordinating all main points of the layout of this area for future reference.

Setting out Stanley Cemetery-3 acres.

Setting out centre lines of roads required in connection with the Shek Ŏ Village layout.

Setting out numerous matshed sites at Middle Beach and South Beach, Repulse Bay.

Kowloon.

Setting out an area of six acres at Yaumati for the Sanitary Department.

New Kowloon.

Demarcation of the boundary of New Kowloon--permanent marks were fixed to define the same on the ground.

Port.

Setting out an extension of 13.9 acres to the Kai Tak Air

Setting out a site for a new village near Chuk Un for the inhabitants of Kowloon Walled Village.

A survey of an area of thirty-five acres in connection with the boundaries of the stone quarries at Cha Kwo Ling, Yau Tong and Lyemun.

New Territories.

Setting out a mining area of half square mile near Sha Tin. Preparation of a provisional layout for an extension of twenty-five acres to Tai Po (Market) Village and survey in connection with same.

A survey of an area of three acres at Kwanti in connection with the preparation of lease plans of the China Light and Power Co.'s sub-station.

A survey of an area of twelve acres at Sheung Shui for the preparation of lease plans of Sheung Shui Inland Lot No. 7.

Setting out and survey of the Government bungalow site of seven acres at Sheung Shui.

Survey of an area of sixteen acres at Ku Tung for the Police Department.

Setting out five alternative wireless station sites of 81 acres each at Fanling, Kam Tsin, Ku Tung, San Tin and Shek Po.

Survey of the South China Brickworks, Castle Peak (seventeen acres) for preparation of lease plans.

Survey of an area of three acres near Castle Peak in connection with the setting out of Lot 321, D.D.376.

Share This Page