Size.
Q 95 —
P.W.E. New Kowloon.
184. Miscellaneous Drainage Works.
The following are the most important stormwater drains and sewers laid during the year:
Description Length Locality Position Remarks 42" Stormwater drain 347' Shamshuipo From Nan Chang Street Nullah in Fuk Wing Street, Fuk Wa Street & Cheung Sha Wan Road towards Nathan Road, Shamshuipo. 36" 324' Cheung Sha Wan Across Castlepeak Road, in road between N.K.I. Ls. 1172 and 421 and on towards N.K. I.L. 521, Cheung Sha Wan. 33" 171' 27" 335' 24" 129' 21" 330' 18" 442' 15" 282' 12" 155' 39" 196' 15" Sewer 624' Shamshuipo In Maple Street from opposite N. K. I. L. 1274, through Playing Fields Reserve Area, Shamshuipo Completed. 15" 371' Sak Kip Mei Street from manhole between Om Yau Street and Tin Liu Street to N.K.I.L. 1107, Shamshuipo. 19" 97' 15" In Maple Street to opposite scavenging lane N.K.I. Ls. 1274 and 1273, and in scavenging lanes in rear of N.K.I.LS. 1274 and 1273. Shamshuipo. 6" 496' 27" 99