Size.
P.W.E. Hong Kong.
Q 64
119. Sewage and Stormwater Drains.-The undermentioned are the most important stormwater drains and sewers which were laid during the year: —
Description. Length. Locality. Position. Remarks. 33" Storm-water drain 161' Sookunpoo In new road above Tai Hang Village from Sookunpoo Nullah to I.L. 2461. Completed. 18" 135' 15" 582' 12" 460' 15" 15' Wongneichong From I.L. 2559 Sing "J Completed. 12"-15" 197' "2 15" 48' "7 9" 240' 9' 15" 183' May Road In front of I.L. 2929. New Garage. Completed. 12" 323' At side of S.I.L. 104 Shaukiwan East from Tram-line near Blind School to nullah near S.I.L. 105, 12" 241' Shaukiwan East Between Shaukiwan Nullah and S.I.L. 433. Completed. 12" 115' Shaukiwan East At North-east corner of S.I.L. 447 to S.I.L. 433 Shaukiwan East. Completed. 9" Storm-water drains 195' Wongneichong In Yick Yam Street from I.L. 2503 eastward to Sing Woo Road Nullah, Wongneichong. Completed. 15" 71' Woo Road to I.L. 2983 Village Rd., Wongneichong. In King Kwong Street from I.L. 3089 eastward to Sing Woo Road Nullah, Wongneichong. Completed.:7
"
17