Q 63
P.W.E. Hong Kong.
118. Training Nullahs.-The following are the most important nullah works carried out during the year:-
Locality. Description of work. Length trained (in feet). Re- marks. Repulse Bay Nullah training from Road to South of R.B.L. 177 to fore shore at East of R.B.L. 159... 319' Completed. Kennedy Town Nullah training from southern lot boundary of R.B.L. 200 to point near foreshore.Q 63
P.W.E. Hong Kong.
118. Training Nullahs.-The following are the most im- portant nullah works carried out during the year:-
Locality.
Description of work.
Length trained (in feet).
Re- marks.
Repulse Bay
Nullah training from Road to South of R.B.L. 177 to fore- shore at East of R.B.L. 159...
319' Com-
pleted.
""
Kennedy Town
Nullah training from southern lot boundary of R.B.L. 200 to point near foreshore.
Extension of nullab to south of I.L. 1082 West of Cad- ogan Street........
Shaukiwan East... Parapet walling around exis-
Wongneichong
Tai Hang
Sookunpoo
ting nnllah at Shaukiwan East near Tram Terminus...
Construction of wing walls at head of Village Road nullah, south of I.L. 2456 ...
Parapet walling on east side. of Tai Hang nullah adjacent to I.L. 2477
Parapet walling around Soo- kunpoo nullab from point opposite French Hospital to Causeway Bay
Stanley Peninsula. Channels below Septic Tanks
serving St. Stephen's Co!- lege Stanley Peninsula
173'
17
174'
11
750'
"
27'
418'
582'
";
458'
*
Bowen Road
Channel
West of Military
Hospital, Bowen Road
244'
29
Macdonnell Road. Channel in Botanical Garden
Pokfulam
opposite Macdonnell Road...
169'
55
Improvements to Pokfulam
nullah below No. 8 Bridge...
**
Estimates
Expenditure
$25,000.00
$15,962.70