P.W.E. Hong Kong.

Q 58

1 Plain Cylindrical Grinding Machine,

1 Cushman Independent Chuck,

1 6" Centre Sliding, Surfacing and Screw Cutting Lathe 4' 0" bed.

1927 Estimates, 1927 Expenditure,

$7,000.00 $5,695.31

120. New Engine for Dennis Lorry.-As it was decided not to purchase the engine no expenditure under this heading was incurred.

1927 Estimates, 1927 Expenditure,

$3,000.00 Nil.

121. Damages by the Rainstorm on 19th July, 1926.-The following works carried over from the previous year were completed during the year:-

Repairs to the existing stormwater drains and gulleys at Hatton and Conduit Roads.

Reconstruction of the 18" cement concrete stormwater drain in Kennedy Road.

Removal of sand and boulders from the Wong Nei Chong main nullah.

Reconstruction of the Shek Tong Tsui nullah.

Repairs to the Eastern wall of the nullah at the Paper Mills, Aberdeen.

Repairs to the Invert of the nullah culvert at Smithfield.

Repairs to the nullah at R.B.L. 203, Pokfulam Road.

Repairs to the main sewer at Aberdeen Valley, below Wanchai Gap.

Repairs to the nullah above the junction of the new road and Robinson Road.

Repairs to Stone Nullah Lane.

Reconstruction of the grille and catchpit at Kennedy Road.

Reconstruction of the channel East of the Government Medical Officer's residence, Barker Road.

Clearing Soo Kun Po nullah of sand.

Repairs to sewer at Macdonnell Road and Calder Path.

Removal of large boulders in the stream course near the Naval Tanks, Bowen Road.

Repairs to the nullah and 6" sewer, near Nos. 12 and 13, Bowen Road.

Carriage of sand from Soo Kun Po nullah to Wong Nei Chong.

Share This Page