155. Miscellaneous Drainage Works

P.W.E. New Kowloon

(a.) Main sewer from Fuk Tsun Heung to Tai Po Road.- This work, referred to in paragraph 213 (a) of last year's Report, could not be proceeded with owing to the road not being cut through.

1926 Estimates, $15,000.00 Total Estimates, $25,000.00

1926 Expenditure, Nil.

Expenditure to 31.12.26, $3,283.36

(b.) Kowloon Tong Development Area,-Sewers.-The following are the most important sewers laid during the year :

Size Description Length Locality Position Remarks 6" Sewer 810' Kowloon Tong In scavenging lane between blocks R. and S. Completed 6" 486' In scavenging lane between blocks J. and K. 6" 504' In scavenging lane between blocks L. and M. 18" 15" 12" & 9" 2,881' From Boundary Street at South-East corner, Kowloon Tong Estate, due North alongside nullah to opposite scavenging lane between blocks X. and W. 6" 590' In scavenging lane between blocks D. E. and F. 6" 485' In scavenging lane between blocks G. H. and I. 6" 430' In scavenging lane between blocks U. and T. 6" 335' In scavenging lane between blocks T, and V. 6" In scavenging lane between blocks P. and Q. 29 17 Not Completed

Kaulungtong -> Kowloon Tong

Tota! -> Total

laue -> lane

J: ->

3 ->

+ ->

* ->

" " ->

Share This Page