85
1925 Estimates, $30,000.00
1925 Sup. Vote, 34,400.00
P.W.E. Hong Kong. $64,400.00
1925 Expenditure, (from Government funds) $49,177.54
1925 Expenditure (contributions by various lessees) 847.70
$50,025.24
125. Miscellaneous Drainage Works:-
(a.) Laying sewer in connection with Conduit and Hatton Roads Development Scheme. This work, referred to in paragraph 130 (b) of last year's Report, was commenced during the year,
1925 Estimates, $8,000.00
1925 Expenditure, $912.75
Total Estimates, $9,000.00
Expenditure, to 31.12.25, $912.75
(b.) Shaukiwan Road.-Laying drain in connection with North Point Foreshore Development. This work, referred to in paragraph 130 (c) of last year's Report, was continued.
1925 Estimates, $10,000.00
1925 Expenditure, $9,371.30
Total Estimates, $20,000.00
Total Expenditure to 31.12.25, $16,841.14
(c.) General Works.-Owing to receipt of unsatisfactory tenders, most of the 6″ & 9″ sewers, &c., were laid departmentally, the larger works being let by contract. The following are the most important stormwater drains and sewers which were laid during the year:--
Size Description Length Position Remarks 9" & 4" Sewer 2,059'0" Mt. Cameron From I.L. 2355 to I.L. 237 & 247 30" Stormwater drains 680'0" Tung Lo Wan To Septic Tank 15" Sewer and filter 158'3" Deep Water Bay Repulse Bay From 9″ main sewer to the Bridge West of R.B.L. 182 6" 1,295'0" Completed. 6" 163'0" Sai Wan Ho At the side and rear of S.I.L. 10 6" 136'5" Shaukiwan East In lane at the rear of S.I.Ls. 514 and 516