Q 71

P.W.E. Kowloon,

Length trained.

Expendi-

ture.

Lin. Ft.

(ii) Extension of storm-water culvert west of Kowloon City Road near K.M.L. 53, Hok Un, (completed), (vide item (ii) of last year's Report),

(iii) Extension of nullah and temporary channel in Soy Street near F.L. 2, Mongkoktsui, (not completed), (total length 460 feet)

Cost of Work,

Less contribution by

lessee,

(iv.) Various small items,

1916 Estimates,

80 $1,359.06

$1,331.24

500.00

337

831.24

78.22

$2,500.00 2,412.61

1916 Expenditure,

118. Miscellaneous Drainage Works. The following is a statement of the principal items carried out under this heading, the amounts stated representing in some cases only a portion of the cost owing to the works extending into more than one year :--

(i.) Laying 15" sewer underneath the railway lines from existing outfall in sea-wall to Salisbury Road opposite Nathan Road, (completed), (vide item (ix) in last year's Report),

(ii) Extension of 6" sewer in Kansu Street from Canton Road to K.I.L. 1296, (completed),

$2,386.18

298.41

(iii) Extension of 9" sewer in new road north of Fife Street to K.I.L. 1287, (completed),

265.92

(iv.) Extension of 12" sewer in Nathan Road and 6” sewer in scavenging lane north of K.I.L. 1202, (completed),

845.85

(v.) Extension of 9" stormwater drain in Kansu Street opposite K.I.L. 1296, (completed),

138.34

(vi.) Laying temporary 6" cast iron pipe and constructing channels near K.I.L. 1292, Kowloon City Road, (completed),

202.25

(vii.) Extension of 9" stormwater drain in new street east of K.I.L. 571 from Saigon Street to Cheuk Lok Street, (completed),

349.69

(viii.) Laying 21", 18" and 15" stormwater drain from Waterloo nullah to Steam Laundry, (K.I.L. 1157), for drainage of Pitt Street, (completed),...

(ix) Extension of 6" sewer and 9′′ stormwater drain to K.M.L.'s 58-63, (completed),

(x.) Extension of 6" sewer in Ship Lane, Taikoktsui, between K.I.L.'s 178 & 182, (completed),

(xi.) Constructing 15" channel from junction of Ashley and Middle Roads to Tsimshatsui Police Station and connecting same to stormwater drain, (completed),

1,733.76

637.26

275.23

141.39