P.W.E. Kowloon.

Q.72

(xii.) Laying 6" sewer in lane rear of K.I.L. 1217 from Hamilton Street, Mongkoktsui, (completed),

(xiii) Extension of 6" sewer in lane rear of K.I.L. 1261 at junction of Argyle Street and Nathan Road, (completed),

(xiv.) Drain connections (20) and other minor works:-

Cost of Work, $ 212.19 Less contributions by various lessees, etc.... 443.98 $1,723.47 1916 Estimates, 633.50 1916. Sup. Vote, 1,089.97 $10,000.00 3,000.00 $13,000.00 1916 Expenditure, 9,020.42

Item (i). This was a continuation of the work referred to in item (ix) of last year's Report.

Items (ii), (iii), (iv), (ix), (x), (xii) & (xiii). Extensions were required in all these cases to take the drainage from new houses erected on the various lots mentioned.

Item (v). An extension of the stormwater drain was required to take the surface water from the newly-formed roadway opposite K.I.L. 1296.

Item (vi). A temporary drain and channels were laid to take the sullage drainage from houses erected on K.I.L. 1292 until the neighbourhood is more developed.

Items (vii) & (viii). Extensions of these stormwater drains were required in connection with the formation of the roadways mentioned.

Item (xi). As stormwater from the compound of Tsimshatsui Police Station discharged on to Crown land, forming pools in which mosquitoes were liable to breed, a cement concrete channel and down-shaft were formed and connected to the stormwater drain in Middle Road.

Item (xiv). This calls for no comment.

119. Extensions of Lighting. The following lamps were erected:--

Gas Lamps. Canton Road and Reclamation Street between Waterloo Road and Pitt Street, 4 Sham Chun Street, 2 Argyle Street, 2 Pitt Street, 1 Hamilton Street, Cheung Lok Street, 1* Increase in Gas Lamps, 11 * Provided under Private Street Improvements and charged to lessee of lot.

Edit History

2026-05-06 14:37:09 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
P.W.E. Kowloon. Q.72 (xii.) Laying 6" sewer in lane rear of K.I.L. 1217 from Hamilton Street, Mongkoktsui, (completed), (xiii) Extension of 6" sewer in lane rear of K.I.L. 1261 at junction of Argyle Street and Nathan Road, (completed), (xiv.) Drain connections (20) and other minor works:- Cost of Work, $ 212.19 Less contributions by various lessees, etc.... 443.98 $1,723.47 1916 Estimates, 633.50 1916. Sup. Vote, 1,089.97 $10,000.00 3,000.00 $13,000.00 1916 Expenditure, 9,020.42 Item (i). This was a continuation of the work referred to in item (ix) of last year's Report. Items (ii), (iii), (iv), (ix), (x), (xii) & (xiii). Extensions were required in all these cases to take the drainage from new houses erected on the various lots mentioned. Item (v). An extension of the stormwater drain was required to take the surface water from the newly-formed roadway opposite K.I.L. 1296. Item (vi). A temporary drain and channels were laid to take the sullage drainage from houses erected on K.I.L. 1292 until the neighbourhood is more developed. Items (vii) & (viii). Extensions of these stormwater drains were required in connection with the formation of the roadways mentioned. Item (xi). As stormwater from the compound of Tsimshatsui Police Station discharged on to Crown land, forming pools in which mosquitoes were liable to breed, a cement concrete channel and down-shaft were formed and connected to the stormwater drain in Middle Road. Item (xiv). This calls for no comment. 119. Extensions of Lighting. The following lamps were erected:-- Gas Lamps. Canton Road and Reclamation Street between Waterloo Road and Pitt Street, 4 Sham Chun Street, 2 Argyle Street, 2 Pitt Street, 1 Hamilton Street, Cheung Lok Street, 1* Increase in Gas Lamps, 11 * Provided under Private Street Improvements and charged to lessee of lot.
Baseline (Original)
P.W.E. Kowloon. Q.72 (xii.) Laying 6" sewer in lane rear of K.I.L. 1217 from Hamilton Street, Mongkoktsui, (com- pleted), (xiii) Extension of 6" sewer in lane rear of K.I.L. 1261 at junction of Argyle Street and Nathan Road, (completed),. (xiv.) Drain connections (20) and other minor works:- Cost of Work, Less contributions by various lessees, etc.... 1916 Estimates, 1916. Sup. Vote, $ 212.19 443.98 $1,723.47 633.50 1,089.97 $10,000.00 3,000.00 $13,000.00 1916 Expenditure, 9,020.42 Item (i). This was a continuation of the work referred to in item (ix) of last year's Report. Items (ii), (iii), (iv), (ix), (x), (xii) & (xiii). Extensions were required in all these cases to take the drainage from new houses erected on the various lots mentioned. Item (v). An extension of the stormwater drain was required to take the surface water from the newly-formed roadway opposite K.I.L. 1296. Item (vi). A temporary drain and channels were laid to take the sullage drainage from houses erected on K.I.L. 1292 until the neighbourhood is more developed. Items (vii) & (viii). Extensions of these stormwater drains were required in connection with the formation of the roadways mentioned. Item (xi). As stormwater from the compound of Tsimshatsui Police Station discharged on to Crown land, forming pools in which mosquitoes were liable to breed, a cement concrete channel and down-shaft were formed and connected to the stormwater drain in Middle Road. Item (xiv). This calls for no comment. 119. Extensions of Lighting. The following lamps were erected :-- Gas Lamps. Canton Road and Reclamation Street be- tween Waterloo Road and Pitt Street, 4 Sham Chun Street, 2 Argyle Street, 2 Pitt Street, 1 Hamilton Street, } Cheung Lok Street, 1* Increase in Gas Lamps, 11 * Provided under Private Street Improvements and charged to lessee of lot.
2026-05-06 14:37:09 · Baseline
View content

P.W.E. Kowloon.

Q.72

(xii.) Laying 6" sewer in lane rear of K.I.L. 1217 from Hamilton Street, Mongkoktsui, (com- pleted),

(xiii) Extension of 6" sewer in lane rear of K.I.L. 1261 at junction of Argyle Street and Nathan Road, (completed),.

(xiv.) Drain connections (20) and other minor works:-

Cost of Work,

Less contributions by various

lessees, etc....

1916 Estimates,

1916. Sup. Vote,

$ 212.19

443.98

$1,723.47

633.50

1,089.97

$10,000.00

3,000.00

$13,000.00

1916 Expenditure,

9,020.42

Item (i). This was a continuation of the work referred to in item (ix) of last year's Report.

Items (ii), (iii), (iv), (ix), (x), (xii) & (xiii). Extensions were required in all these cases to take the drainage from new houses erected on the various lots mentioned.

Item (v). An extension of the stormwater drain was required to take the surface water from the newly-formed roadway opposite K.I.L. 1296.

Item (vi). A temporary drain and channels were laid to take the sullage drainage from houses erected on K.I.L. 1292 until the neighbourhood is more developed.

Items (vii) & (viii). Extensions of these stormwater drains were required in connection with the formation of the roadways mentioned.

Item (xi). As stormwater from the compound of Tsimshatsui Police Station discharged on to Crown land, forming pools in which mosquitoes were liable to breed, a cement concrete channel and down-shaft were formed and connected to the stormwater drain in Middle Road.

Item (xiv). This calls for no comment.

119. Extensions of Lighting. The following lamps were erected :--

Gas Lamps.

Canton Road and Reclamation Street be-

tween Waterloo Road and Pitt Street, 4

Sham Chun Street,

2

Argyle Street,

2

Pitt Street,

1

Hamilton Street,

}

Cheung Lok Street,

1*

Increase in Gas Lamps,

11

* Provided under Private Street Improvements and charged to lessee of lot.

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.