P.W.E. Kowloon.

70 =

(ix.) Argyle Street—Kerbing, channelling and laying decomposed granite footway, raising carriageway (half width) to new levels, surfacing with decomposed granite and providing the necessary drainage opposite K.I.L. 1262,

(x.) Shanghai Street—Kerbing and channelling in front and on south side of K.I.L. 1287, including concreting scavenging lane at rear of lot and providing drainage,

(xi.) Reclamation Street—Raising carriageway, kerbing, channelling and laying granolithic footway opposite K.I.L. 960,

(xii.) Saigon Street—Paving with granite setts in front of dust bin,

(xiii.) Kansu Street—Kerbing, channelling and laying granolithic paving in front and on south side of K.I.L. 1296 and providing the necessary drainage,

(xiv.) Chatham Road—Laying cast-iron rain-water channels across footway opposite K.I.L. 570,

(xv.) Austin Road—Laying cast-iron rain-water channel across footway opposite K.I.L. 1171,

$595.56

$514.50

$513.73

$449.43

$277.70

$158.94

$122.61

Most of the foregoing items were rendered necessary by the erection of buildings on the various lots mentioned. The only items calling for special mention are the following:-

• Item (ii). The construction of this road was carried out in accordance with the special conditions attached to the sale of New Kowloon Farm Lots 7 & 8. Including a length of 1,200 feet of old road, which was widened, the total length of the road is 3,050 feet.

• Item (iv). As the road to Kowloon City was periodically damaged by heavy rainfalls, owing to flood water carrying with it detritus from the quarries, it became necessary to construct the walling and to lay the channelling mentioned.

• Item (vi). The completion of the Waterloo Road nullah between the points mentioned enabled the old, untrained streamcourse, which ran along Pitt Street, to be filled in and the carriageway to be widened and surfaced.

• Item (xii). This work was rendered necessary by the removal of the dust bin to a new position.

117. Training Nullahs.—General Works. The following is a statement of the works carried out under this heading:

Length trained. Lin. Ft. Expenditure. (i.) Extension of south wall and invert of nullah in Boundary Street, Fuk Tsun Heung, (completed),—north wall built by lessee of N.K.I.L.'s 46-48 (vide item (i) of last year's Report), $144.09