P.W.E. Kowloon.

P.W.E. KOWLOON.

116. Roads,--General Works.-The following is a statement of the works executed under this heading :-

(i.) Canton Road and Reclamation Street between Waterloo Road and Pitt Street-Raising, kerbing, channelling, macadamising carriageways, laying granolithic footways, concreting scavenging lane and providing the necessary drainage,

(ii.) Constructing a road, 8′0′′ wide, to give access to N.K.F.L.'s 7 and 8,

$3,526.81

(iii) Nathan Road :-

Kerbing, channelling and laying granolithic paving adjoining K.I.L. 571, (half width only),

Forming, channelling and surfacing with decomposed granite (half width of roadway) at rear of K.I.L. 1293; adjusting kerbing, laying new channelling and granolithic paving in front of lot,

1,357.02

$1,310.04

1,181.32

2,491.36

(iv) Hunghom-Kowloon City Road--Erecting dwarf wall and forming channelling opposite Shek Shan Quarry Lot No. 6 to prevent the road being damaged by heavy rains,

(v.) Sham Chun Street-Raising, kerbing and channelling adjoining K.I.L.'s 58-63 including concreting side lane and providing the necessary drainage,

(vi.) Pitt Street (between Disinfecting Station and Steam Laundry)-Relaying kerbing and channelling and reforming and macadamising carriageway,

(vii.) Jordan Road-Kerbing, channelling and surfacing road (half width) on east side of K.I.L. 1294 and laying granolithic footway on north, south and east sides of lot,

1,115.78

855.78

$51.74

673.01

(viii) Portland Street:-

Raising carriageway, kerbing, channelling and laying decomposed granite footway opposite K.I.L. 1217,

$611.43

Kerbing, channelling and laying granolithic paving opposite K.I.L. 1218,

182.52

Channelling and paving scavenging lane at rear of K.I.L.'s 948, 949 and 975,

175.34

969.29

Edit History

2026-05-06 14:36:37 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Q 69 P.W.E. Kowloon. P.W.E. KOWLOON. 116. Roads,--General Works.-The following is a statement of the works executed under this heading :- (i.) Canton Road and Reclamation Street between Waterloo Road and Pitt Street-Raising, kerbing, channelling, macadamising carriageways, laying granolithic footways, concreting scavenging lane and providing the necessary drainage, (ii.) Constructing a road, 8′0′′ wide, to give access to N.K.F.L.'s 7 and 8, $3,526.81 (iii) Nathan Road :- Kerbing, channelling and laying granolithic paving adjoining K.I.L. 571, (half width only), Forming, channelling and surfacing with decomposed granite (half width of roadway) at rear of K.I.L. 1293; adjusting kerbing, laying new channelling and granolithic paving in front of lot, 1,357.02 $1,310.04 1,181.32 2,491.36 (iv) Hunghom-Kowloon City Road--Erecting dwarf wall and forming channelling opposite Shek Shan Quarry Lot No. 6 to prevent the road being damaged by heavy rains, (v.) Sham Chun Street-Raising, kerbing and channelling adjoining K.I.L.'s 58-63 including concreting side lane and providing the necessary drainage, (vi.) Pitt Street (between Disinfecting Station and Steam Laundry)-Relaying kerbing and channelling and reforming and macadamising carriageway, (vii.) Jordan Road-Kerbing, channelling and surfacing road (half width) on east side of K.I.L. 1294 and laying granolithic footway on north, south and east sides of lot, 1,115.78 855.78 $51.74 673.01 (viii) Portland Street:- Raising carriageway, kerbing, channelling and laying decomposed granite footway opposite K.I.L. 1217, $611.43 Kerbing, channelling and laying granolithic paving opposite K.I.L. 1218, 182.52 Channelling and paving scavenging lane at rear of K.I.L.'s 948, 949 and 975, 175.34 969.29
Baseline (Original)
Q 69 P.W.E. Kowloon. P.W.E. KOWLOON. 116. Roads,--General Works.-The following is a statement of the works executed under this heading :- (i.) Canton Road and Reclamation Street between Waterloo Road and Pitt Street-Raising, kerbing, channelling, macadamising carriageways, laying granolithic footways, concreting scavenging lane and providing the necessary drainage, (ii.) Constructing a road, 8′0′′ wide, to give access to N.K.F.L.'s 7 and 8, (iii) Nathan Road :--- Kerbing, chaunelling and laying gra- nolithic paving adjoining K.I.L. 571, (half width only), Forming, channelling and surfacing .$3,526.81 1,357.02 $1,310.04 with decomposed granite (half width of roadway) at rear of K.I.L. 1293; adjusting kerbing, laying new channelling and granolithic paving in front of lot,. 1,181.32 2,491.36 (iv) Hunghom-Kowloon City Road--Erecting dwarf wall and forming channelling opposite Shek Shan Quarry Lot No. 6 to prevent the road being dam- aged by heavy rains, (v.) Sham Chun Street-Raising, kerbing and chan- nelling adjoining K.I.L.'s 58-63 including con- creting side lane and providing the necessary drainage, (vi.) Pitt Street (between Disinfecting Station and Steam Laundry)-Relaying kerbing and chan- nelling and reforming and macadamising car- riageway, (vii.) Jordan Road-Kerbing, channelling and surfac- ing road (half width) on east side of K.I.L. 1294 and laying granolithic footway on north, south and east sides of lot, 1,115.78 855.78 $51.74 673.01 (viii) Portland Street:-- Raising carriageway, kerbing, chan- nelling and laying decomposed granite footway opposite K.I.L. 1217, $611.43 Kerbing, channelling and laying gra- nolithic paving opposite K.I.L. 1218,. 182.52 Channelling and paving scavenging lane at rear of K.I.L.'s 948, 949 and 975, 175.34 969.29
2026-05-06 14:36:37 · Baseline
View content

Q 69

P.W.E. Kowloon.

P.W.E. KOWLOON.

116. Roads,--General Works.-The following is a statement of the works executed under this heading :-

(i.) Canton Road and Reclamation Street between Waterloo Road and Pitt Street-Raising, kerbing, channelling, macadamising carriageways, laying granolithic footways, concreting scavenging lane and providing the necessary drainage,

(ii.) Constructing a road, 8′0′′ wide, to give access

to N.K.F.L.'s 7 and 8,

(iii) Nathan Road :---

Kerbing, chaunelling and laying gra- nolithic paving adjoining K.I.L. 571, (half width only),

Forming, channelling and surfacing

.$3,526.81

1,357.02

$1,310.04

with decomposed granite (half width of roadway) at rear of K.I.L. 1293; adjusting kerbing, laying new channelling and granolithic paving in front of lot,.

1,181.32

2,491.36

(iv) Hunghom-Kowloon City Road--Erecting dwarf wall and forming channelling opposite Shek Shan Quarry Lot No. 6 to prevent the road being dam- aged by heavy rains,

(v.) Sham Chun Street-Raising, kerbing and chan- nelling adjoining K.I.L.'s 58-63 including con- creting side lane and providing the necessary drainage,

(vi.) Pitt Street (between Disinfecting Station and Steam Laundry)-Relaying kerbing and chan- nelling and reforming and macadamising car- riageway,

(vii.) Jordan Road-Kerbing, channelling and surfac- ing road (half width) on east side of K.I.L. 1294 and laying granolithic footway on north, south and east sides of lot,

1,115.78

855.78

$51.74

673.01

(viii) Portland Street:--

Raising carriageway, kerbing, chan- nelling and laying decomposed

granite footway opposite K.I.L.

1217,

$611.43

Kerbing, channelling and laying gra- nolithic paving opposite K.I.L.

1218,.

182.52

Channelling and paving scavenging

lane at rear of K.I.L.'s 948, 949

and 975,

175.34

969.29