116. Roads,--General Works.-The following is a statement of the works executed under this heading :-
(i.) Canton Road and Reclamation Street between Waterloo Road and Pitt Street-Raising, kerbing, channelling, macadamising carriageways, laying granolithic footways, concreting scavenging lane and providing the necessary drainage,
(ii.) Constructing a road, 8′0′′ wide, to give access to N.K.F.L.'s 7 and 8,
$3,526.81
(iii) Nathan Road :-
Kerbing, channelling and laying granolithic paving adjoining K.I.L. 571, (half width only),
Forming, channelling and surfacing with decomposed granite (half width of roadway) at rear of K.I.L. 1293; adjusting kerbing, laying new channelling and granolithic paving in front of lot,
1,357.02
$1,310.04
1,181.32
2,491.36
(iv) Hunghom-Kowloon City Road--Erecting dwarf wall and forming channelling opposite Shek Shan Quarry Lot No. 6 to prevent the road being damaged by heavy rains,
(v.) Sham Chun Street-Raising, kerbing and channelling adjoining K.I.L.'s 58-63 including concreting side lane and providing the necessary drainage,
(vi.) Pitt Street (between Disinfecting Station and Steam Laundry)-Relaying kerbing and channelling and reforming and macadamising carriageway,
(vii.) Jordan Road-Kerbing, channelling and surfacing road (half width) on east side of K.I.L. 1294 and laying granolithic footway on north, south and east sides of lot,
1,115.78
855.78
$51.74
673.01
(viii) Portland Street:-
Raising carriageway, kerbing, channelling and laying decomposed granite footway opposite K.I.L. 1217,
$611.43
Kerbing, channelling and laying granolithic paving opposite K.I.L. 1218,
182.52
Channelling and paving scavenging lane at rear of K.I.L.'s 948, 949 and 975,
175.34
969.29
Q 69
P.W.E. Kowloon.
P.W.E. KOWLOON.
116. Roads,--General Works.-The following is a statement of the works executed under this heading :-
(i.) Canton Road and Reclamation Street between Waterloo Road and Pitt Street-Raising, kerbing, channelling, macadamising carriageways, laying granolithic footways, concreting scavenging lane and providing the necessary drainage,
(ii.) Constructing a road, 8′0′′ wide, to give access
to N.K.F.L.'s 7 and 8,
(iii) Nathan Road :---
Kerbing, chaunelling and laying gra- nolithic paving adjoining K.I.L. 571, (half width only),
Forming, channelling and surfacing
.$3,526.81
1,357.02
$1,310.04
with decomposed granite (half width of roadway) at rear of K.I.L. 1293; adjusting kerbing, laying new channelling and granolithic paving in front of lot,.
1,181.32
2,491.36
(iv) Hunghom-Kowloon City Road--Erecting dwarf wall and forming channelling opposite Shek Shan Quarry Lot No. 6 to prevent the road being dam- aged by heavy rains,
(v.) Sham Chun Street-Raising, kerbing and chan- nelling adjoining K.I.L.'s 58-63 including con- creting side lane and providing the necessary drainage,
(vi.) Pitt Street (between Disinfecting Station and Steam Laundry)-Relaying kerbing and chan- nelling and reforming and macadamising car- riageway,
(vii.) Jordan Road-Kerbing, channelling and surfac- ing road (half width) on east side of K.I.L. 1294 and laying granolithic footway on north, south and east sides of lot,
1,115.78
855.78
$51.74
673.01
(viii) Portland Street:--
Raising carriageway, kerbing, chan- nelling and laying decomposed
granite footway opposite K.I.L.
1217,
$611.43
Kerbing, channelling and laying gra- nolithic paving opposite K.I.L.
1218,.
182.52
Channelling and paving scavenging
lane at rear of K.I.L.'s 948, 949
and 975,
175.34
969.29