[161]
Page 54
Table E (i).—DETAIL of Field Works to be constructed.‡
Note.-Works to be commenced at the Precautionary Stage are marked with an asterisk (*).
Detail of Working Parties. R.E. Supervision,
Tools required.
::
400
400
2 days
2
**
2
1 day
Page 54
For general superintendence in sub-Section
(a).
::
No.
of Work.
Nature of Work.
N.C.Os.
N.C.Os.
Crow-
Officers. and
Coolies. Officers. and Pickaxes. Shovels,
Axes.
bars.
Bill- hooks.
Time required.
Remarks.
Sand-bags.
Men.
Men.
:
::
::
5+
25
::*:
20
::
::
::
1
2师
3
4#
5
ཨ
6#
7
West Battery Scarp ramp at north-east corner Central Battery-Clearing trees to give arc of
fire to guns
No. I (WESTERN) SECTION.
Sub-Section (a), Stonecutters
Earthwork at South Shore Battery for 25 men.. Constructing barbed wire fence round South
Shore Battery and water tank
Earthwork on north shore for 25 men
Enclose electric light emplacement on north
shore with wire fence
:
::
1
25
: 22 **
:
20
10
2
2
2
10
10
29
2
Central Battery-100 yards barbed wire fence to
protect north side
4
2
8*
9*
Albion Battery, north-east-Enclose with fence Electric light at Albion Battery-Enclose with
fence
10
12
2
22
10
Centurion Battery, south-east-Enclose with
fence
8
12
12
13
Central Battery, P.F. cell-Enclose with fence.. Water supply, north of married quarters, south
shore-Enclose with fence
2
26
2
14*
Preparation of site and approach for 2—15-pr. guns on hill east of barracks: to face north
20
→
15
Iron fences round East and West Batteries-
Improve with 2 strands of barbed wire
6
Р
Page 54
::
•
20
: 2: 2:
:
::
:
2
22
6
25
2
1
6
1
to a
2
10
2:
10
2:
::
::
::
13
15
..
•
..
5
5
1
2
::
2 days
1 day
得
"
~ ~
2
2
::
2
2
:
2
2
:
::
2 days 1 day
2 days
1 day 1 "
4 days
1 day
This has been done.
51
The plans, &c., relating to the above table were last examined and compared with the Defence Scheme on the 15th October, 1906. They are not required and do not exist for Nos. 2–13, 15, 28, 54, 60, 62–65, 68-71.
Page 54
CHAPTER III (E).
34
Page 54