Table E (i).-DETAIL of Field Works to be constructed-continued.
Detail of Working Parties. R.E. Supervision.
Tools required.
CHAPTER III (E).
52
30
10
10
10
6
2
20
: 2 88 :::*
1
6
300
2 days
20
* :*999
6
200
**
2
23
300
4 hours
2 weeks..
For general superintendence in sub-Section
(0).
:
•
6
10
10
3 days
10
2 weeks..
1 hour
50
50
5
5
*
5
1,000
2
2
"J
1
I week
1
3 weeks..
Considered unnecessary,
No.
of Wark.
Nature of Work.
N.C.OS.
N.C.Os.
Time required.
Remarks.
Officers. and Coolios. Officers, and
Men,
Men.
Pickaxes. Shovels.
Crow- bars.
Axes.
Bill- hooks.
Sand-bags.
No. 1 (WESTERN) SECTION—contă.
Sub-Section (b), Belcher, &c.
1+
11+
20
•
:::::::
:::::::
20
2
30
16
Stockade east of cattle pier near Kennedy
Town for 20 men
17*
Work on top of Mount Davis for 10 men
Water supply for ditto
·
18*
Position at Sandy Bay Gap for 20 men
19
Line of clearing between 16 and 17
20 Line of clearing between 17 and 18
ON 32
Clearing in front of 18
Mount Davis
21
22
Rifle pits or sangars at look-out post west of
::
23
Reserve position
50
24
Improve path from Victoria Battery to south
10
පුළු
පූප
10
10
coast past
25
Improve path between guns at Elliott Battery
and S.C. post
b
28*
Strengthen wire fence round Elliott Battery
2
-
: & :89880
20
20
30
20
20
20
NNNG!
::
Wire Entanglements generally.
Round infantry post on Mount Davis..
Across front and flanks of pusition at Sandy Bay
Gap
In front of rifle pits at look-out post west of
Mount Davis
Stonecutters generally as in items
•
High wire entanglements round coast of Stone-
cutters, including lacing among rocks
Fence and entanglements round electric light
emplacements on Praya
Lacing between fences round batteries
Total barbed wire
pickets
plain wire
..
::
:
::
::
Barbed wire.
Yards.
1 day
::
::
:
::
:::
::
:
:::
2+
11,200
3,000
1,000
14,200
160,000
3,000
20,000
::
As these works cannot be undertaken except in succession, as men are available, the propor tion of tools is to be as for the probable working party, and not as for the work to be done.
3 bags high wire entanglement.
I picket to 27 yards wire.
54 yards wire to 1 yard run of fence.
2 yards plain wire to 1 yard run of fence.
:::
212,400
7,000 7,800
1 (a) = 1,500.
(b) = 5,500.
For general superintendence, No. 11 Section.
(Completed.)
31+
30
30
10
2
6
600
4 hours..
:
30
30
10
2
6
600
3 days
::
20
20
2
5
500
3
10
10
1
2
2,500
3
Water to be stored inside.
4
4
2
2
500
2
12
4
4
2
2
500
2 17
120
120
20
6
10
600
7
(Completed.)
40
40
3
2
5
2,000
4
Water to be stored inside.
30
30
6
10
10
200
2
30
30
6
10
15
15
3
30
30
6
10
12
12
2
සස
10
10
949"
200
5
100
3
200 100 Barbed wire.
ลง ส.ส
2
2
2
2
>>
Yards,
:
95,000
See note to Section I.
27,000
18,000
140,000
:
::
::
:
::
::::
No. II (CENTRAL) SECTION
:
29*
Preparation of site and approach for 2-15-pr.
1
25
guns at Wong-nei-Cheong
30*
Preparation of site and approach for 1--4'7 gün
1
25
on spar of Mount Nicholson near Wong-nei-
Choong Gap
32*
Blockhouse at Wong-nei-Cheong Gap
1
25
10
33*
Putting in s
state of defence the P.W.D.
15
foreman's quarters at Tytum
34*
Putting in a state of defence the cable landing
8
place at Tytam Bay
35*
Putting in a state of defence the cable landing
8
place at Deep Water Bay
:
36
Preparation of site and approach for gun on
1
50
100
High West
37*
Smail redoubt, Aberdeen, and defences generally
1
50
38
Shelter trenches, clearing, and entanglements at
High West
1
50
39
Ditto at reserve position, Mountain Lodge
50
40
Ditto at Mount Kellett, gun position..
25
41
Ditto at Sanitarium
50
42
Ditto at Deep Water Bay
20
::
::::
Wire required for surrounding gun emplacements, blockhouses, defensible buildings, and to form entanglements in front of entrenchments
Wire required to surround now magazine with
bigh wire entanglement, 3 bays deep
Wire required to surround old magazine with
high wire entanglement, 3 bays deep
Total barbed wire
*
:
*
:
::::
:::
:::
5,600 5,200
53
CHAPTER III (E).
35
300
2 weeks..
1 week ..
6 hours.. 2 days
For general superintendence in No. III Section, For preparation of site and laying out road,
2,300 yards runt road by contract.
700 yards runt road by contract.
100 yards runt road by contract,
1,200 yards runt road by contract (2 relief?).
1,200 yards runt road by contract.
10.
-
7 st
1,000 yards runt road by contract.
300
1 day
To prepare position.
2 days
100 yards runt road by contract.
20
20
2
200
1 day
>
pickets
"
plain wire
43*
44*
45*
No. III (EASTERN) SECTION
Preparation of site and approach from Tytam Gap, Lyemun Road, for 1-47 Q.F. gun on slopes of Mount Parker above Boa Vista Proparation of approach to howitzer position,
Boa Vista, up north-east slope of hill Preparation of site for approach from Tytam Gap, Lyemun Road, for 2-15-prs, on kuoll, south- east of Tytam Gap
:::
:
:::
:::
++
17
1
20
1
20
1
12
20
20
46
Road from Tytam Gap to infantry position,
Mount Collinson
47
Improvement of existing path from Boa Vista to
Quarry Gap as gun road
48
Road for infantry from Mount Parker to Quarry
Gap
49
Approach road and preparation of position for 2-15-pr. guns near Saiwan Redoubt and fire
20
20
20
trenches
Page 55
:
Page 55
Page 55Page 56