Table E (i).-DETAIL of Field Works to be constructed.
Note.-Works to be commenced at the "Precautionary" Stage are marked with an asterisk (*).
Detail of Working Parties. R.E. Supervision.
Tools required.
:
:
:
Page 51
For general superintendence in sub-Section
(a).
No.
of Work.
Nature of Work.
N.C.Os.
N.C.Os. Officers. and Coolies. Officers. and
Men.
Men.
Crow-
Pickaxes. Shovels.
Axes.
bars.
Bill- hooks.
Time required.
Remarks.
Sand-bags.
:
•
5t
51
Earthwork at South Shore Battery for 25 men..
Constructing barbed wire fence round South
Shore Battery and water tank
Earthwork and machine gun emplacement on
north shore for 25 men
Enclose electric light emplacement on north
shore with wire fence
West Battery Scarp ramp at north-east corner Central Battery-Clearing trees to give arc of
fire to guns
Central Battery-100 yards barbed wire fence to
protect north side
Albion Battery, north-east-Enclose with fence
Electric light at Albion Battery-Enclose with
fence
Centurion Battery, south-east-Enclose with
fence
East Battery-Complete fence round..
Central Battery, P.F. cell-Enclose with fence.. Water supply, north of married quarters, south
shore-Enclose with fence
Preparation of site and approach for 2-15-pr. guns on hill east of barracks; to face north Iron fences round East and West Batteries—
Improve with 2 strands of barbed wire
::
20
10
223
25
ཙཚ
2
2
10
10
4
2
•
10
2
::
:
:::
:
15
12
22
8
12
00
1
20
20
22 0
6
:
:
::
•
:
:
::
:
:
20
20
8:
25
: 2:
10
*
::
:::
2:35
10
:
15
15
:
::
::
6
400
2 days
2
2
""
2
6
400
2
23
2
NN
::
1 day
2 days
5
1 day
1
1 21
2
2 days
2
1 day
2
2
2 days
2
2
"
2
1 day
2
1
""
2
4 days
1 day
NEN
:
NNNNN
海
::
The plans, &c., relating to the above table were last examined and compared with the Defence Scheme on the 4th July, 1905. They are not required and do not exist for Nos. 2−13, 15, 28, 54, 60, 62–65, 68–71.
No. I (WESTERN) SECTION.
Sub-Section (a),
Stonecutters
1
༥
2*
3
4*
5
6*
7
8*
9*
10*
13
=**
11
12
14*
15
Р
Page 51
Page 51
CHAPTER III (E),
31
Page 51