32

SECTION CC

EXISTINO BULDUNG

CORRIDOR

Operating theatre block

SETAR

TYPICAL FLOOR PLAN

-A

VERANDAM

STORE

OPERAMS THEATRE,

DISPOSING

STERILIZING

OPERATING THEATRE

I]

CORRIDOR

RECORD RA

OFFICE

PATIENTS CJ LANDING

PASTRY

LIFT MALL

LINC

CORRIDOR

SECTION AA

Radiodiagnosis block

LEPOSED FILAÇ

SISTE

EXISTING BUILDING

WAITING HALL

OFFICE

VERANDAN

I.

Cost

Main building works Air-conditioning

PABX and other equipment

Phase I (including new roof kitchen, central linen store, generator room, and pre- paration work)

נננננ

L-RAINA

CORRIDOR

->

-WAY NA

རུང་་་་་་་

CONFERENCE

CORRIDON

HE

FIRST FLOOR PLAN

REST R

117431

C

CORRIDOR

REPITING R

OFFICE

HK$

5,398,000

1,000,000

468,000

1,340,000

Total 8,206,000

L.

Sub-contractors & Suppliers

Electrical installation

Gilman & Co. Ltd.

Medical gases Hong Kong Oxygen & Ace-

tylene Co. Ltd.

Sterilizing equipment — Lead works for radium works

Co.

Danby & Hance Ltd.

Kwong Hing

Sino British

Mastic asphalt roofing works

(H.K.) Ltd.

Mosaic tile flooring Hutchinson (Bldg.) Ltd. Vinyl tile flooring The Swedish Trading Co.

Ltd.

Metal windows and doors

Dodwell & Co.

Ltd. (Crittall Metal window) & Canton Metal Window Mfg. Co. Ltd.

Metal lockers Yue Tek Steel Furniture Mfg.

Ltd.

Metal racks

Sin Hwa Steel Furniture & Office

Equipment Co.

X-Ray filming racks

ment) Ltd.

Shewan Tomes (Equip-

Separate Contractors

Air-conditioning

& Builders) Ltd. Elevator installation

Corporation Ltd. Steam installation

Winsome & Co. (Engineers

The Jardine Engineering

Engineering Services (super-

vised by E. & M. Office)

Far East Architect & Builder September, 1967