32
SECTION CC
EXISTINO BULDUNG
CORRIDOR
Operating theatre block
SETAR
TYPICAL FLOOR PLAN
-A
VERANDAM
STORE
OPERAMS THEATRE,
DISPOSING
STERILIZING
OPERATING THEATRE
I]
CORRIDOR
RECORD RA
OFFICE
PATIENTS CJ LANDING
PASTRY
LIFT MALL
LINC
CORRIDOR
SECTION AA
Radiodiagnosis block
LEPOSED FILAÇ
SISTE
EXISTING BUILDING
WAITING HALL
OFFICE
VERANDAN
I.
Cost
Main building works Air-conditioning
PABX and other equipment
Phase I (including new roof kitchen, central linen store, generator room, and pre- paration work)
נננננ
L-RAINA
CORRIDOR
->
-WAY NA
རུང་་་་་་་
CONFERENCE
CORRIDON
HE
FIRST FLOOR PLAN
REST R
117431
C
CORRIDOR
REPITING R
OFFICE
HK$
5,398,000
1,000,000
468,000
1,340,000
Total 8,206,000
L.
Sub-contractors & Suppliers
Electrical installation
Gilman & Co. Ltd.
Medical gases Hong Kong Oxygen & Ace-
tylene Co. Ltd.
Sterilizing equipment — Lead works for radium works
Co.
Danby & Hance Ltd.
Kwong Hing
Sino British
Mastic asphalt roofing works
(H.K.) Ltd.
Mosaic tile flooring Hutchinson (Bldg.) Ltd. Vinyl tile flooring The Swedish Trading Co.
Ltd.
―
Metal windows and doors
Dodwell & Co.
Ltd. (Crittall Metal window) & Canton Metal Window Mfg. Co. Ltd.
Metal lockers Yue Tek Steel Furniture Mfg.
Ltd.
Metal racks
Sin Hwa Steel Furniture & Office
Equipment Co.
X-Ray filming racks
ment) Ltd.
Shewan Tomes (Equip-
Separate Contractors
Air-conditioning
& Builders) Ltd. Elevator installation
Corporation Ltd. Steam installation
Winsome & Co. (Engineers
The Jardine Engineering
Engineering Services (super-
vised by E. & M. Office)
Far East Architect & Builder September, 1967