The ambulance bridge has been designed as a rigid frame structure. For the two and three tier car park a grid system of framing was adopt- ed to widen the spans between columns in both directions and to facilitate

an easy manoeuvring of traffic flow and parking.

For the special radiation protective measures around the Betatron and Linear Accelerators. barytes concrete has been used in order to save exces- sively thick, expensive or incon- venient walls which would otherwise be required. The barium sulfide aggregates which were obtained from mines in China are about 50% heavier than ordinary stone aggre gates and gave concrete densities of about 220 lbs a cubic foot.

of

The boiler flue has been designed with maximum temperatures 1500 F. in wind. After allowing for the thermal insulation of the special insulating fire bricks the concrete was designed for

સ temperature gradient of 185°F.

Quantity of Material

The total tonnage of mild steel bars used on the main hospital was about 4,500 tons and the volume of concrete poured was over two and quarter million cubic feet thus giving an approximate total weight of about 150.000 tons for the structure alone.

ENGINEERING SERVICES (A) Steam

Steam is being used for the following services: -- autoclaves dis- infector and sterilizers generally; hot water; air-conditioning for operat ing the turbine condensers, chilled water pump and heating ventilation plants; kitchens-including ward sterilizing sinks; laundry; quarters— hot water for nursing and house of ficers blocks only.

Four Wilson Multipac' horizontal packaged oil fired boilers have been installed each capable of raising 22,000 pounds of steam per hour at a pressure of 180 pounds per square inch.

A six-inch welded steel pipeline which follows that of the two sea water mains, delivers the oil fuel from barges by their own pumps to two

COST ANALYSIS-

1. Main hospital building

a) Building

including site formation. piling & external works; Menial Staff Block. Animal House Manifold room etc. excluding medical, kitchen and laundry equipment and all engineer- ing services other than plumbing & electrical installation

b) Kitchen equipment

c) Laundry equipment total capacity 180.000 lbs. per week to serve all Government hospitals and clinics

c) Engineering Services

Total Cost HKS

Cost per bed (1,380 beds)

$30.800.000

$22.320

250.000

180

1.200.000

870

i) Lifts (14 lifts & 5 dumbwaiters) ii) Air-conditioning iii) Steam installation

1.650.000

5.500.000

including

etc.

T

boilers, service piping, fuel storage

iv) Remaining services - including sea water mains, switch boards. emergency generator, compressed air supply, telephones. radio etc.

2. Medical equipment

27

a) Sterilizing equipment b) Laboratory c) Physiotherapy d) Theatre

el Radiotherapy f) Radiodiagnostic

g) Remaining

"

**

>

(e.g. dental pharmacy, mortuary. instruments, surgical furniture etc.) Total: HK$ 9.700,000

3. Quarters

a) Nurses & Sisters Quarters & Nurses Training School (114 sisters & 450 nurses)

Total: HKS 11,000.000

2.600.000

8.515

2.000.000

1.100.000

300,000

200.000

1.500.000

3.200.000

900.000

2.500.000

7.030

5,800.000 5.200.000

7.970

b) Duty rooms and 46 staff flats

4. Furniture elc.

a) Hospital beds

630.000

b) Stores. records & office

160.000

c) General including linen, messes &

quarters

3,185.000

d) Crockery & outley

25,000

Total: HKS 4,000,000

including consultants

2.900

1,300,000

940

$50,725

5. Miscellaneous

fees

THE HONG KONG & FAR EAST EUILDER — VOLUME 18. NUMBER 5

Grand total: $70,000,000

85