The second to 13th floors will be available as offices. A spacious duplex penthouse will contain a residence (which Madam Lee pro- poses to occupy) and a mess for the bank staff. The bank again will take threequarters of the overall

area.

Piling work has begun but some troublesome soil conditions have been encountered. Once these have been overcome it is estimated con- struction will occupy 12 months.

A striking feature of the external design of the building is an Oriental motif, which will be executed in tiles recessed in the wall fronting Des Voeux Road. The Oriental influence will be carried into the entrance lobby where there will be Chinese carvings in the walls.

Site of the building, which will comprise 17 storeys plus basement, is I.L. 2180 and Sec. B. Sec. C. and R.P. of L.L. 2179, at 29, 31, 33, 35. 37 Des Voeux Road Central. building area is 5.381 sq.ft.

The

Another high office building is to be erected next to the United Chinese Bank Building, on the former On Lok Yuen site.

However, an

area of 17 ft. between these two buildings has not yet been committed to any purpose. It is owned by the Siberian Fur Company.

It is understood there were nego- tiations to have this land brought into the United Chinese Bank scheme. but that no finality could be reached.

General contractor: Hsin Chong

Co.

Waterproof tanking: Dreyer & Co.

Ltd.

High tensile steel: Cheung & Tang

Ltd.

Piling:

The Pressure Piling Co., (H.K.) Ltd.

Steel Windows: The Canton Metal

Window Mfg. Co.

Chubb & Son's Lock & Safe Co.

44

Ltd. Safe Deposit Equipment, 7 in. Steel Finish Main Door. Tangbar

DOUGLAS

STREET

SHOP

NOTH

DN

UP

DN

RIGHT OF WAY

-ON

SAVINGS DEPT.

ZOFT

POWER

DN

-UP

DN

ACCOUNTANT

DEPT.

BANKING

HALL

CURRENT ACCOUNTS

DEPT.

UP

ON

VOEUX

ROAD

CENTRAL

DES

Ground floor plan.

ON

ON

OFFICE

Reinforcement:

PART

OF

HALL

UPPER

BANKING

TRAVEL SERVICE

DEPT.

MANAGER'S

OFFICE

GENERAL

OFFICE

CANOPY

First floor plan.

The

Jardine

Engineering Corp. Ltd.

Lifts: Three Autotronic High-Speed

DN

UP

LOT

BOUNDARY

LOT

BOUNDARY

Gearless Passenger Elevators, 3000 lbs. at 500 FPM. from Basement, 2nd to 13th floors Otis.

THE HONG KONG & FAR EAST BUILDER

VOLUME 14. NUMBER 5

Share This Page