The west apartments will have large living and dining rooms separated by curtains when necessary, a breakfast room, kitchen and three bedrooms.

In all the apartments each bed- room will have an attached bath- room and, in addition, there will be a guest lavatory. Bathrooms to mas- ter bedrooms will be fitted with the best quality coloured sanitary fix- tures. Ample closet space will be provided together with a box room. There will be balconies to each apartment on the front of the build- ing, and utility balconies at the back from which will open the servants' quarters.

The large apartments on the four upper floors will have real fireplaces In their living rooms, while the others will have electric fireplaces.

BATH

UTILITY

SVT. BOX KIT

SVT.

BATH

SVT.

BALCONY

BAT

BED ROOM

DINING KIT BOX

ROOM

VP

HALL

HALL

CORRIDOR

CLT

T

ICL.

MASTER BED ROOM

BED ROOM

LIVING £

LIVING ROOM

BED ROOM

DINING ROOM

BATH

MASTER BED ROOM

BALCONY

BALCONY

Plan of the first floor

year.

hangers. Alternate bays on the bal- the ground floor, space is provided Projecting out from the service contes contain plant boxes and these for a central air-conditioning system balconies will be the laundry drying have been staggered on the different and the necessary ducts installed so racks. These will be concealed by floors to avoid monotony.

that the entire building may be air- concrete screen walls to avoid an

conditioned conveniently at some Construction differs from conven- future date. The building is expected unsightly appearance from the road above.

tional methods in that the building to be completed by March of next is cantilevered out on all four sides, and all

columns being well within the on the upper roof, the lift machine building. Some of the columns room and water tanks.

the ground floor are surrounded by The front elevation of the building grilles formed by galvanized iron Construction Co. is symmetrical, but the plan is not pipes. Not only do these achieve because there is one large apartment their primary purpose of hiding the down pipes, but they also protect the columns from damage by cars.

On the

roof are store rooms

on

Architect: Eric Cumine, F.R.I.B.A. General Contractors: Hsin Heng

Plumbing Installation: Dodwell & Co. Ltd.

Electrical Installation: Wah Tung

Co.

on each floor and one small one. Consequently, the lift is to one side of centre; in addition it was a re-

Internal finishes include: coloured quirement of the owners that the lift

Schindler Lift & Hope Windows: should go up to the roof, so that the mosaic tile floors to the entrance

hall, main stairs, lift machine room is one floor higher bathrooms and balconies; teak par-

landings. The Jardine Engineering Corp., Ltd.

than usual. This would have resulted

Roofing: William Jacks & Co., Ltd. quet floors in all principal rooms: in a tall asymmetrical projection

and generally lime plaster walls and Sanitary Fittings: Universal Run- above the roof which would have spoilt the entire facade. An archi- ceilings. Most rooms, including those die (Lee Yu Kee), Eljer (Hochang & on the ground floor, will have false Co.) & Shanks (Engineering Equip- tectural feature has, therefore, been made at this level with a screen con- ceilings to hide beams and conceal ment Co., Ltd.) sisting of R.C.C. fins, which gives a

wiring. balanced appearance.

Provision has been made for the Sun breaks, consisting of reinforc- installation of individual air-condi- Hardware: Schlage (Shewan, ed concrete louvres, are fitted above tioning units in the master bedrooms Tomes & Co., Ltd.) & Union (WII- each balcony with decorative steel without spoiling the elevations. On liam Jacks &

OP C

REMOVABLE

3:07

TEAK

Naco Louvre Windows: John D. Hutchison & Co., Ltd.

Co., Ltd.).

ET

(Above) Photograph of the model from the south (Right) Details of master bedroom airconditioning duct and part section through the building.

343

NAC UNIT

PLAN

DETAILS

SERVICE

BALCON

FALSE CEILING

DODA

SECTION

OF

A.C. DUCT

LIFT DODA

DRIVE WAY!

*14***

4:01

AIRBED

CUTER

SLAN

#IFT

WALL

SC Ai C

CURTAIN GOI

S-FALSE =CEILING

FIAST

FLOOR

COLUMN

COLUMN WITH PIPE FACING

PLANT

101

4 RCC

LOUVRE

ИСС COLUMN

PLANT

BOL

COLOURED TILE DADOL

COLOURED TILE

JASHER GRANO

DRIVE WAY

4" STONE

CURS

(1640)

SECTION OF ENTRANCE HALL & BALCONIES, ETC.

18

Page 20Page 21

Share This Page