HONG KONG GOVERNMENT
Piling for Kennedy Town Abattoir. Franki Piling and Hong Kong. $1,524.640
Superstructure and ancillary road- works for Nairn Road/Waterloo Road flyover. $3,254,721
Site formation for a resettlement estate at Kwai Chung North, Stage II. Tsuen Wan, $4,628,341
Engineering (Hong Kong) Ltd.
Paul Lee Engineering Co.
Oriental Pioneer velopment Co., Ltd.
Demolition & removal of Blake Pier Cheung Sun Kee and temporary vehicular ferry berth
at Rumsey Street. $88,000
Construction of seawall fronting Chai Yau Wing Co., Ltd. Wan Reclamation-Stage I. Phase I. $925,356
Construction of domestic resettlement housing (Blocks Nos. 1 & 2) Yuen Long, N.T. $4.333,088
Construction of resettlement flatted factory (No. 1). Yuen Long. N.T.
$1,583.742
De-
&
Site formation for quarters for Dis- Henry Engineering
trict Commissioner. New Territories. Construction Co., Ltd. and approved school for boys at Kau Wah Keng, New Territories. $156.262
Site formation at Sheung Li Uk Hop Kee Construction Garden, Tai Po Road, Kowloon. Co.
$30,522
Supply of metal windows for exten- China Steel Works, sions to freight building at Kai Tak Ltd. Airport, Kowloon. $25.986
Supply of metal windows for com- China Steel munity centre at Tai Hang Tung. Ltd. Kowloon. $28.322 Supply and
Works,
Goodman Corporation (Engineers & Builders) Ltd.
laying mastic asphalt Precast Products Ltd. roofing to Factories Nos. 4 and 5 at Cheung Sha Wan Resettlement Estate, Kowlcon. $39,347
Fook Lee & Co.
Construction of seawall at Cheung Sha Yau Wing Co. Ltd.
Wan. $964,025
Construction of resettlement housing Wan Hin & Co., Ltd (Blocks A and B) at Shek Pai Wan. Hong Kong. $6.272.356 Removal
of overburden from Mount Fook Lee & Co. Butler Quarry. April 1965 to March
1966. $480,000
Vibro annex
Piling to foundations for 2
Piling and schools and Blocks Nos. 3. 4 & 5 at International Founda- Yuen Long Resettlement Estate. tion Co.. Ltd. $883.215
Supply & installation of 5 passenger The Jardine Engineer. lifts in Resettlement Housing (Block ing Corporation. Ltd. "F** Extension) at Ham Tin (Area
"B"). Kowloon. $260,550
Construction of domestic low cost Cheong Lee Construc- housing (Blocks 1 & 3) Ngau Tau Kok tion Co., Ltd. (Area "A"), Kowloon. $7.287,340
Site Investigations. 1965. (Scheduled The Oriental Boring rates minus 10%)
Service Co., Ltd.
Removal of overburden from Diamond Winley Construction Hill Quarry, April 1965 to March 1966. Co. $265,000
Construction of resettlement housing Wan Yu & Co., Ltd. (Block 9) Shek Lei (Area "B"), Tsuen
Wan. N.T. $2,977,665
Yuen Long Flood Control
Scheme, Chi
Fuk
Construction
Stage II (2nd Sect.) Construction of Co.
Nullah. $579.915
Supply of G.I. pipes for use in reset- Ng Tai Kee (H.K.) Co.
tlement licensed areas centres. $161,658
and transit
detachable Jardine Engineering fittings for Kwai Corp. Ltd.
Supply of A.C. pipes,
and C.I.
joints Chung salt water main. $100,100; Arnhold & Co., Ltd. $56,697
Supply of 30 in. steel
and Gilman & Co., Ltd. pipes specials for Kai Tak/Wong Tai Sin salt water pumping main. $866,426
Supply and laying mastic asphalt Sino-British
to roofing Government quarters at Kong) Ltd. Magazine Gap. Hong Kong. $21,424
Piling to foundations for Fire Station
(Hong
Western Franki Piling & En- and quarters at New gineering (Hong Kong) Praya, Kennedy Town, Hong Kong. Ltd. $134.610
Supply and installation of an aircon- International Engineer- ditioning system at Police Headquar- ing Ltd. ters, Arsenal Street.
$40,950
Hong Kong.
Remedial work to roof lights, E. & M. William Jacks & Co. workshop, Kowloon. $13,824
Electrical installation at Ham Tin Resettlement Estate (Area 'B'), Block 'F' extension & annex school. Kow- loon. $191.100
(Hong Kong) Ltd.
The British General Electric Co., Ltd.
Electrical installation for Ngau Tau British General Elec- Kok low cost housing estate (Area tric Co., Ltd. 'A'). Block 2, Kowloon. $130,200
Ltd.
Gilman & Co., Ltd.
Supply of metal windows and doors Canton Metal Window for Urban Services Department Depot. Manufacturing Co., Causeway Bay, Hong Kong. $45.205 Electrical installation at operation block and radio-diagnosis block at Queen Mary Hospital Extension, Hong Kong. $222.320
Supply & installation of 3 passenger The Jardine Engineer- lifts in resettlement housing at Tsz ing Corpn., Ltd. Wan Shan (Area 'A'). Block A-13, Kowloon.
$158,300
Supply of metal windows and doors The Canton Metal for standard urban clinic & maternity Window Manufactur- home at Cheung Sha Wan. Kowloon. ing Co., Ltd. $16,853
Supply and laying mastic asphalt Precast Products Ltd. roofing to Yuen Long District Branch
and Office, Clinic Territories. $25,870
Quarters,
New
Piling to foundations for pavilion. Kee Yip Construction
caretakers quar- Co., Ltd. store, lavatory and
ters at Tai Po Playground, New Ter- ritories. $26.630
BRUNEI
Government contracts awarded during the last four months.
Power Station in Temburong District. Shing Yin Co., Brunei. Foundations: M $193.851 plus $5,000
for contigencies
Complete power station: M$3,803,065
Utility Finance, Singapore
Air conditioning the Sultan's palace International Co.
(Darul Hanna).
M$537,900 plus an Singapore.
additional $23.500 for mineral wool,
acoustic lining
Piling for new building for Radio Wong Brothers, Brunei and Language
M$134,710
Construction of
fire а
Building. Brunei.
station
and Borneo Builders, other works at Brunei Airport. Brunei. M $99,500.
Far East Architect & Builder May, 1965
Veterinary clinic.
M $55,775
Awang Tengah bin Hassip, Brunei,
Construction of six blocks of 4-door Hiew Builders. barracks. at Seria (oil town), Brunei. M$226,800
Earthworks
Arabic Secondary China Construction
M$197,601 Co., (B) Ltd. School for Girls. Brunei.
(including $10,000 for contigencies)
Construction of a power station and Mak Kum Wah, stores foundation in Gadong. Brunei. Brunei. $318.500
Construction of sea retaining wall, Wein Kee Construc- tennis court and market (shopping tion Co., Brunei. centre) at The Brunei Malay Regiment Camp at Berakas. M $437,977
$5