The floor covering is p.v.c. tiles in bathrooms and kitchens and teak par- quet in the other rooms.

Calacatta Cremo marble is used as a wall facing in the main entrance and lift lobby, and Carrara B marble is laid for stair treads and risers.

Piling on the site took two months. Building work was started in October 1964 and was completed in January this year.

The general contractor was Hsin Chong and Co., Ltd. Piling was car- ried out by Gammon (H.K.) Ltd.

Sub-contractors included:

Plumbing Dodwell and Co., Ltd.

Electrical installation, switchgear, miniature ciruit breakers and switch- boards Gilman and Co. Ltd.

J

Lift- Jardine Engineering Corp., Ltd. (Schindler)

Metal windows and doors Dod-

well and Co., Ltd. (Crittall)

Luxury block built on hillside

Ironmongery

William Jacks and

Co., Ltd.

Paint and marble

Duro Indus-

tries. Ltd.

EXIT

DRIVE

EXISTING RETAINING WALL

WAY

CAR PARK

LOT BOUNDARY

CAR

PARK

PORTER'S

STORE

CAR

PARK

-AM.

COVERED

CAR

PARKING

ENTRANCE! HALL

ENTRANCE HALL

STORE

LAWN

CAR PARK

CAR

PARK

LAWN

bB bc

DRIVE

WAY

GROUND FLOOR PLAN

Far East Architect & Builder June, 1966