Lytton Savings and Loan Association Building, Canoga Park, California Kurt Meyer and Associates, architect Johnson and Nielsen, structural engineers Western Concrete Structures Co. Inc., post-tensioning
The structure includes an 8,000 sq. ft. ground floor area and a 6.000 sq. ft. mezzanine level. The roof is framed
with post-tensioned beams 10 ft. on centre, with a clear span of 76 ft. and cantilevers of 8 ft. on each end.
The post-tensioned beams frame into reinforced concrete girders 8 ft. deep by 28 in. wide, with clear spans of 76 ft., and with 21 ft. cantilevers on each end. The use of the long- span post-tensioned roof beams thus provided large column-free areas, per- mitting complete freedom of interior layout and design.
་་་
The First National Bank Building; San Diego, California, Tucker, Sadler and Bennett, architects and engineers
Otto Buehner and Co., precast panels
The exterior of this 25-storey building is formed of precast concrete panels which feature white quartz. vertine was also precast on panels as a veneer.
Tra-
The panels, which measure 5 ft. by 14 ft., with the fins projecting 18 in. for sun control, were pre-glazed and delivered to the site for erection,
The 388 ft. tall tower is 84 ft. by 124 ft. Its struc- tural frame is supported on 12 columns spaced 40 ft. on
centre.
The jury commented. "A particularly appropriate use of precast concrete. Rapid and economical building en- closure was accomplished by the design of sculptured panels of precast concrete
The Century Building; Seattle, Washington Bystrom and Greco, architects Anderson-Bjornstad-Kane, engineers
The four-storey office building with connected park- ing facility employs both post-tensioned and pretensioned concrete. It houses a bank on the first oor and offices above, and is located on a 120 ft. by 119 ft. site near downtown Seattle. The building has endured a moderately severe earthquake without exhibiting any damage.
Sun control is achieved without obstruction of the
view.
The architect stated, "The construction method has provided a fireproof structure for the owner well within his budget. A distinct economic advantage was revealed when compared to other systems, and particularly where fire protection was necessarily provided by a ceiling.
Far East Architect & Builder February, 1967
Page 20Page 21
Lytton Saving and Loan Association Building;
Oakland, California
Kurt Meyer and Associates, architect Johnson and Nielsen,
structural engineers
Western Concrete Structures Co., Inc., post-tensioning
The structure consists of three
storeys and a basement, with the third-floor reinforced concrete flat plate slab ingeniously suspended from the prestressed roof system. The roof is framed with a clear-span, two-way waffle-type system with a 4 in. slab, employing post-tensioned concrete beams at 9 ft. 4 in. centres which span 93 ft. 4 in. in one direction and 79 ft. 4 in. in the other. The beams are 4 ft. in depth, with widths varying from 8 in. to 12 in.
The third-floor slab is suspended from the prestressed roof system with 24 in. diameter high-strength steel hangers at alternate beams, 18 ft. 8 in.
on centre.
Estancia High School; Newport Beach, California
William E. Blurock and
Associates, architects
John A. Martin and
Associates, engineers
The Prescon Corp., post-tensioning
The school, with an enclosed area of 200,000 sq.
serves 2,000 students.
ft..
Use of a prestressed concrete waffle system was selected by the architects to provide for maximum column spac- ing, and to accommodate a variety of educational spaces, with maximum flexibility.