Bond Street styling for the first floor shops

Another view of the first floor arcades

tino. The pedestrian bridge is finished in White Carrara slabs.

Building Times

Demolition of the old Prince's Building started in December 1962, followed by excavation and piling in April 1963. The substructure was started in August 1963, and the superstructure in December 1963. The superstructure was completed in May this year.

Consultants

Architects:

Palmer and Turner.

Hong Kong.

Consulting engineers: W.V. Zinn

and Associates.

Quantity surveyors:

Every (Far East).

Langdon and

Decorative panels: Antonio Casadei

Contractors

General contractor: Sung Foo Kee,

Ltd.

Foundations

and substructure:

Gammon (Hong Kong) Ltd.

Sub-contractors

Supply of Larssen sheet piling, York air-conditioning installation, Schindler lift installation, and Dorman Long bridge structural members Jardine Engineering Corp., Ltd.

T

Plumbing Dodwell & Co. Ltd.

Electrical installation (Mitsubishi)

China Engineers, Ltd.

High tensile steel rods

ing & Co. Ltd.

Metal windows (Crittall)

Co. Ltd.

Pre-mix concrete

(H.K.) Ltd.

Harry Wick-

-

Dodwell &

Pioneer Concrete

Aluminum shop fronts Petman Ltd. Armour plate glass doors (Pilkington) Shewan, Tomes (Equipment)

Ltd.

Marble and terrazzo work Vannini

Construction Co. Ltd.

Metal work

-

Jeh Hsing Metal Works,

and Shing Fat.

Wood flooring supply)

Hawker

Siddeley Bldg. Supplies Pty., Ltd.

Wood flooring (laying) Hong Kong

Teakwood Works Ltd.

Acoustic tile ceilings (Johns-Manville)—

American Engineering Corp.

Accoustic tile ceilings (Armstrong)

Getz Bros. Ltd.

Waterproofing (basement)

Jacks & Co. Ltd. Waterproofing (roofs)

(Hong Kong) Ltd. Hardware

William

Rheopanol

China Engineers, Ltd., William Jacks & Co. Ltd., Shewan, Tomes (Equipment) Ltd., Dreyer & Co. Ltd., and Jeh Hsing Metal Works.

Calcinator incinerators

bert Bros., Ltd.

Wallem Lam-

Sino-

Mosaic and wall tiles (supply)

British (HK), Ltd.

Paint and supply of glass mosaics

Duro Industries, Ltd.

Escalator approaches to first floor lobby

54

Far East Architect & Builder August, 1965