174
NEW TERRITORIES
P.25 Tsuen Wan Reclamation, Stage I
P.26 Tung Chung Pier
P.27 Ma Wan Pier
P.28 Sha Tau Kok Pier
Appendix II-Contd.
P.29 Silver Mine Bay Seawall and Reclamation
CATEGORY B(i)
HONG KONG
(Items the planning of which has commenced or should commence during 1961/62)
P.30 Aberdeen Reclamation and Typhoon Shelter
KOWLOON
P.31
Kwun Tong New Town, Reclamation for Industrial Zone 5, Sections C, D & E P.32 Cheung Sha Wan Reclamation, Landing Stages
P.33
Tai Po/Castle Peak Road Link
P.34
Area East of Kwun Tong Police Station
P.35
Waterloo Road Hill Development
NEW TERRITORIES
P.36
Lai Chi Chong Pier
P.37 Ping Chau Pier (Mirs Bay)
P.38
Sham Chung Pier, Tolo Harbour
CATEGORY B(ii)
(Investigations of Major Development Schemes)
P.39
P.40
Ho Man Tin Development, Investigations
Incineration Plant, Hong Kong Island (By Consulting Engineers)
HONG KONG
P.41
KOWLOON
CATEGORY C
(Items considered desirable, the details of which require further consideration or for which no design staff can be made available)
Reclamation at Aldrich Bay (including Pier at Shau Kei Wan)
P.42 Tai Wan Seawall
P.43 Development of Lai Chi Kok, O Pui Shan Area
P.44 Hung Hom Reclamation, Stage II
P.45 Kwun Tong New Town, Roads and Drainage for Industrial Zone 5, Sections C, D & E
P.46 Ngok Yue Shan, Kwun Tong, Roads and Drainage
Kwun Tong New Town, Roads and Drainage for Industrial Zone 6
P.47
P.48
Cha Kwo Ling Seawall
P.49
Extension to Seawall at To Kwa Wan
P.50 To Kwa Wan Public Pier
NEW TERRITORIES
P.51
Pier at Ap Chau, Sha Tau Kok P.52 Yung Shue Wan Pier, North Lamma P.53 Sha Tau Kok Development
P.54 Cheung Chau Typhoon Shelter
P.55 Kat 0 Typhoon Shelter
P.56 Sai Kung Typhoon Shelter
P.57 Tai O Typhoon Shelter
P.58 Tap Mun Typhoon Shelter
P.59
Pier at Po Toi Island
P.60
Pier at High Island