Appendix II-Contd.

CATEGORY D

(Items which are estimated to cost less than $100,000 and which could be proceeded with as and when opportunity offers)

P.61 Provision of Moorings and Lock-up Storage in Government Camber, Kowloon

NEW TERRITORIES

P.62 Tide and Wind Gauges at Tai Po

P.63 Pier at Ho Tung Lau, Tide Cove

P.64 Boom at Gin Drinker's Bay Refuse Dump

P.65 Repairs to Seawalls and Dykes at:

(a) Nam Chung

(b) Shuen Wan

(c) Luk Keng

(d) Sai Wan (Sai Kung)

(e) Lai Chi Wo

(ƒ) So Lo Pun

(g) Sham Chung

(h) Yung Shue Au

(i) Kuk Po

(j) Fung Hang

(k) Pak Tam Chung

(1) Yim Tso Ha

HONG KONG

W.1

W.2

W.3

WATER SUPPLIES

CATEGORY A(i)

(Items under construction at 1st January, 1961)

Eastern and Albany Filters Conversion Scheme and Tin Hau Temple Road Supply Aberdeen Water Supply, Stage I

Salt Water Flushing System:

(a) North Point

(b) Chai Wan

W.4

Shau Kei Wan Supply, Stage I

W.5 Supply to Reservoir at 650′ Level below Magazine Gap Road

KOWLOON

W.6

W.7

W.8

W.9

Kwun Tong Development, Stages I and II and Housing Zone I Additional Service Reservoir at King's Park

Salt Water Flushing System:

(a) Cheung Sha Wan

(b) Jordan Valley

(c) Wong Tai Sin (Kai Tak)

(d) Kwun Tong

Water Supply for Tsz Wan Shan and Wang Tau Hom Resettlement Estates

NEW TERRITORIES

W.10 Cheung Chau Island Water Supply Extension, Stage I

W.11

Tai Lam Chung Scheme

W.12

W.13

Tsuen Wan Supply

Western New Territories Water Supply, Stage II

W.14 Sham Chun, Stage I

W.15 Sham Chun, Stage II

W.16 Irrigation Works in the New Territories:

(a) Tsing Tam

(b) Ho Pui

(c) Minor Works

W.17 Connecting Pipe Line-Jubilee Reservoir Tsuen Wan Filters

(Consulting Engineers Works)

W.18

Shek Pik Scheme

W.19 Plover Cove-Hebe Haven Integrated Scheme:

(a) Preliminary Investigations

(b) Stage I

175