CAB80-32 — Page 348

National Archives 英國國家檔案館 All

Page 348

}

Page 348

ANNEX I (Contd.)

Scale

PORT

Existing

Approved

Recommended

Mauritius

3-6 450

No change

2-6" 150

2-12 pdrs.

Seychelles

2-6" Naval No change

2-6" Naval

Coccs

Islands

-6" Naval No dhange

2-6" Naval

Dar-es- Salaam

1-6" Naval No change

1-6" Naval

findi

Mombasa

3-611 450

No change

2-6" 150

REMARKS

280

Page 348

Two of the 6" 45° are now waiting shipment,

Reconnaissance may prove that an additional C.A. battery is required.

2-9.2" 150 2-6"(Q.F.) 2-6" Naval 1-18 pār.

2-9.2" 35° 6-6" Naval

0.A. defences are not justified as this base is unlikely to present a favourable target to a raider.

Two of the 6" 450 guns are due from production in February 1942 and construction of the new battery is proceeding.

Two 9.2" 55° are due from production in April and May, 1942.

The port being well up the river, the threat of long range bombardment is remote.

Reconnaissance may however

prove it desirable to instal an additional C.A. battery.

Durban

2-9.2" 35'

No change

2-6" (Q.F.)

2-6" Naval 1-6 par.

Hobart

2-6" 150 1-4" Naval

No change

2-6" 150 1-4 Naval

Freemantle

2-9.2" 35° 6-6" Naval

No change

Sydney

3-9.2" 35° 6-6" 150

No change

1-12 pår.

2-9.2" 35° 6-6" 150 1-12 pår.

2-6 pers.

The two 6 pdrs. are about to be shipped from this country.

The Port Defence Committee are considering separately the question of Anti Motor Torpedo Boat Defences. It is expected that the major part of the requirement can be met from early new production.

--4--

Page 348

Page 348

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.