Page 42
Page 42
62
as they can be constructed. The number and extent of these, with estimated time for construction, are shown in detail in the several Sectional Schemes.
Schedule VIII (c), annexed to this Chapter, gives an estimate of the cost of these mat-sheds.
Nearly all the sites for projected works and encampments being on unoccupied ground belonging to the Colonial Government, there will be but little difficulty or cost in connection with utilizing the sites as proposed.
Extension of Piers. It is very desirable that a pier should be erected opposite to North Point Battery, and that the stone pier on the south-east of Stonecutter's Island should be lengthened, for facilitating communications and landing of troops, &c., at those points.
SCHEDULE VIII (a).
ESTIMATE of Cost of Work to be done by Troops.
Sections.
Works.
Dollars.
IV
Carriage of tools
1
Materials for block-house, including carriage Materials for magazine, including carriage
80
10
V
Carriage of tools
1
VI
Carriage of tools
1
VII
Carriage of tools
1
Materials for block-house, including carriage Materials for magazine, including carriage
80
10
VIII
Carriage of tools
Materials for magazine, including carriage
10
Materials for 3 block-houses, including carriage..
240
IX
Magazine for howitzer battery
10
XII
Materials for 4 block-houses
320
768
SCHEDULE VIII (6).
ESTIMATE of Cost of Work to be done by Contractor, assuming that 1,000 coolie labourers are obtainable, which may safely be reckoned on.
Sections.
Works.
IV
Entrenchments
Magazines for 3 9-prs.
V
3 block-houses
Entrenchments
VI
1 block-house
Entrenchments
VII
VIII
Entrenchments
Inclosed work, Bennet's Hill,
Emplacement for 3 9-prs.
Platforms for 3 9-prs.
Entrenchments
:
Page 42
Men.
Dollars.
}
900
200
10
255
175
500
85
175
700
200
1,150
100
250
125
950
1,000
4,775
Page 42
鼻
Page 42