11

In connection with the increase in the dimensions of Stormwater drainage pro- vision on the Reclamation, Government has given up a strip of land 8,000 sq. ft. in area to provide space for the 36 feet wide Bowrington Nullah and satisfactory widths of roadway on each side of the Nullah

The cost to participants of reclaiming the areas which they have been allotted under the Scheme amounts to:-

Total Cost of Scheme

Total Area Allotted.

$5,421,493.38

2,249,000 sq. ft.

Cost as per original

=

$2.41 per S.F.

Estimates

Excess

HONG KONG, 13th June, 1930.

$1.505 $0.905,,

>>

A. ANDERSON,

Engineer-in-Charge.