HONGKONG.
DIAGRAM OF THE MONG-KOK-TSUI BREAKWATER SHEWING PROGRESS
OF STONE DEPOSITING TO 30TH JUNE, 1913.
Laid before the Legislative Council by Command of His Excellency the Governor, July 31st, 1913.
HIGH WAT
ORDINARY SPRING TIDES
LOW WATER ORDINARY SPRING TIDES
HEIGHT
MUD LEVEL
AV
STONE
POSIT
44′3
38′9′′
12
No. 1913
HIGH WATER ORDINARY SPRING TIDES
HOW WATER ORDINARY SPRING TIDES
30TH
JUNE 1913
MUD LEVEL
AVERAGE LEVEL
BOTTOM
DREDGED
TRENCH
192'--0
BREAKWATER
SHEWING
STONE
AVERAGE CROSS SECTION OF THE
DEPOSITED ΤΟ 30th JUNE 1913 THUS:-
Note.-The above Average Heights are continuous from the Centre of the North Head to the Centre of the South Head.
10th July, 1913.
SCALE, 1 INCH=20 FEET.
Total Area of Average Cross Section of Breakwater shewn above Area of Stone Deposited to 30th June, 1913,
=
4,790 Sq. Ft.
3,772
Proportion of Stone Area to Total Area of Cross Section
-
783
47