of the Island This was completed in 1904, partly with filling material obtained from Chinese territory. The limits in Victoria of these two earlier major reclamations are marked by Des Voeux Road and Connaught Road respectively. During the next 30 years reclamation continued on the Island, the largest schemes being those at Tai Koo for the dockyard (21ha which included 13ha of land site formation, completed 1908), Wan Chai (36ha, completed 1929) and around North Point (nearly complete before the Pacific war), together with a smaller reclamation at Shau Kei Wan.

Soon after the cession of Kowloon under the Convention of Peking in 1860 there was some reclamation adjoining deep water in Tsim Sha Tsui, primarily for wharfs, and at Hung Hom for the dockyard, to be followed by extensive reclamation in Tai Kok Tsui and Yau Ma Tei and, to a lesser extent, at To Kwa Wan, Sham Shui Po and Lai Chi Kok, the latter two both lying just to the north of Boundary Street. Subsequently an important reclamation was formed by the Kowloon-Canton Railway in Tsim Sha Tsui and Hung Hom bays (16ha, completed 1910) primarily for its own use which included three deep sea berths on the extreme south-east tip of the Kowloon peninsula. In the period after 1922 there was considerable reclamation in and near Kowloon just as there was in Wan Chai on the Island. Large areas were reclaimed at Sham Shui Po (26ha, completed 1928), Kai Tak (83ha, completed 1931) and Lai Chi Kok (c35ha), all these areas lying in the New Territories close to the old Kowloon/China boundary with much of the filling being obtained from Kowloon Tong, then being developed as a garden city. Just before the Pacific war, reclamations were also started in three other areas of Kowloon Bay, at Ma Tau Kok, Ngau Tau Kok and Kwun Tong.

Roadworks

Construction of Queen's Road in Victoria was started in May 1841, only four months after the British landed on the Island, by the Royal Engineers following the alignment of a narrow bridle/tow path high above the beach which extended some 7 kilometres from the water's edge at Kennedy Town on the west to within a short distance of Happy Valley on the east. Another road, from Wong Nei Chong to Shau Kei Wan was built at the same time, a causeway with two bridges being constructed to carry it across what is now known as Causeway Bay.

Page 120

Page 121

Edit History

2026-05-13 09:02:21 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
87 of the Island This was completed in 1904, partly with filling material obtained from Chinese territory. The limits in Victoria of these two earlier major reclamations are marked by Des Voeux Road and Connaught Road respectively. During the next 30 years reclamation continued on the Island, the largest schemes being those at Tai Koo for the dockyard (21ha which included 13ha of land site formation, completed 1908), Wan Chai (36ha, completed 1929) and around North Point (nearly complete before the Pacific war), together with a smaller reclamation at Shau Kei Wan. Soon after the cession of Kowloon under the Convention of Peking in 1860 there was some reclamation adjoining deep water in Tsim Sha Tsui, primarily for wharfs, and at Hung Hom for the dockyard, to be followed by extensive reclamation in Tai Kok Tsui and Yau Ma Tei and, to a lesser extent, at To Kwa Wan, Sham Shui Po and Lai Chi Kok, the latter two both lying just to the north of Boundary Street. Subsequently an important reclamation was formed by the Kowloon-Canton Railway in Tsim Sha Tsui and Hung Hom bays (16ha, completed 1910) primarily for its own use which included three deep sea berths on the extreme south-east tip of the Kowloon peninsula. In the period after 1922 there was considerable reclamation in and near Kowloon just as there was in Wan Chai on the Island. Large areas were reclaimed at Sham Shui Po (26ha, completed 1928), Kai Tak (83ha, completed 1931) and Lai Chi Kok (c35ha), all these areas lying in the New Territories close to the old Kowloon/China boundary with much of the filling being obtained from Kowloon Tong, then being developed as a garden city. Just before the Pacific war, reclamations were also started in three other areas of Kowloon Bay, at Ma Tau Kok, Ngau Tau Kok and Kwun Tong. Roadworks Construction of Queen's Road in Victoria was started in May 1841, only four months after the British landed on the Island, by the Royal Engineers following the alignment of a narrow bridle/tow path high above the beach which extended some 7 kilometres from the water's edge at Kennedy Town on the west to within a short distance of Happy Valley on the east. Another road, from Wong Nei Chong to Shau Kei Wan was built at the same time, a causeway with two bridges being constructed to carry it across what is now known as Causeway Bay. Page 120 Page 121
Baseline (Original)
87 of the Island This was completed in 1904, partly with filling material obtained from Chinese territory. The limits in Victoria of these two earlier major reclamations are marked by Des Voeux Road and Connaught Road respectively. During the next 30 years reclamation continued on the Island, the largest schemes being those at Tai Koo for the dockyard (21ha which included 13ha of land site formation, completed 1908), Wan Chai (36ha, completed 1929) and around North Point (nearly complete before the Pacific war), together with a smaller reclamation at Shau Kei Wan. Soon after the cession of Kowloon under the Convention of Peking in 1860 there was some reclamation adjoining deep water in Tsim Sha Tsui, primarily for wharfs, and at Hung Hom for the dockyard, to be followed by extensive reclamation in Tai Kok Tsui and Yau Ma Tei and, to a lesser extent, at To Kwa Wan, Sham Shui Po and Lai Chi Kok, the latter two both lying just to the north of Boundary Street. Subsequently an important reclamation was formed by the Kowloon- Canton Railway in Tsim Sha Tsui and Hung Hom bays (16ha, completed 1910) primarily for its own use which included three deep sea berths on the extreme south-east tip of the Kowloon peninsula. In the period after 1922 there was considerable reclamation in and near Kowloon just as there was in Wan Chai on the Island. Large areas were reclaimed at Sham Shui Po (26ha, completed 1928), Kai Tak (83ha, completed 1931) and Lai Chi Kok (c35ha), all these areas lying in the New Territories close to the old Kowloon/China boundary with much of the filling being obtained from Kowloon Tong, then being developed as a garden city. Just before the Pacific war, reclamations were also started in three other areas of Kowloon Bay, at Ma Tau Kok, Ngau Tau Kok and Kwun Tong. Roadworks Construction of Queen's Road in Victoria was started in May 1841, only four months after the British landed on the Island, by the Royal Engineers following the alignment of a narrow bridle/tow path high above the beach which extended some 7 kilometres from the water's edge at Kennedy Town on the west to within a short distance of Happy Valley on the east. Another road, from Wong Nei Chong to Shau Kei Wan was built at the same time, a causeway with two bridges being constructed to carry it across what is now known as Causeway Bay. Page 120Page 121
2026-05-13 09:02:21 · Baseline
View content

87

of the Island This was completed in 1904, partly with filling material obtained from Chinese territory. The limits in Victoria of these two earlier major reclamations are marked by Des Voeux Road and Connaught Road respectively. During the next 30 years reclamation continued on the Island, the largest schemes being those at Tai Koo for the dockyard (21ha which included 13ha of land site formation, completed 1908), Wan Chai (36ha, completed 1929) and around North Point (nearly complete before the Pacific war), together with a smaller reclamation at Shau Kei Wan.

Soon after the cession of Kowloon under the Convention of Peking in 1860 there was some reclamation adjoining deep water in Tsim Sha Tsui, primarily for wharfs, and at Hung Hom for the dockyard, to be followed by extensive reclamation in Tai Kok Tsui and Yau Ma Tei and, to a lesser extent, at To Kwa Wan, Sham Shui Po and Lai Chi Kok, the latter two both lying just to the north of Boundary Street. Subsequently an important reclamation was formed by the Kowloon- Canton Railway in Tsim Sha Tsui and Hung Hom bays (16ha, completed 1910) primarily for its own use which included three deep sea berths on the extreme south-east tip of the Kowloon peninsula. In the period after 1922 there was considerable reclamation in and near Kowloon just as there was in Wan Chai on the Island. Large areas were reclaimed at Sham Shui Po (26ha, completed 1928), Kai Tak (83ha, completed 1931) and Lai Chi Kok (c35ha), all these areas lying in the New Territories close to the old Kowloon/China boundary with much of the filling being obtained from Kowloon Tong, then being developed as a garden city. Just before the Pacific war, reclamations were also started in three other areas of Kowloon Bay, at Ma Tau Kok, Ngau Tau Kok and Kwun Tong.

Roadworks

Construction of Queen's Road in Victoria was started in May 1841, only four months after the British landed on the Island, by the Royal Engineers following the alignment of a narrow bridle/tow path high above the beach which extended some 7 kilometres from the water's edge at Kennedy Town on the west to within a short distance of Happy Valley on the east. Another road, from Wong Nei Chong to Shau Kei Wan was built at the same time, a causeway with two bridges being constructed to carry it across what is now known as Causeway Bay.

Page 120Page 121

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.