86

Reclamation

Victoria Harbour, the raison d'etre for Hong Kong's foundation, formed the focal point around which the new settlers clustered and around which the banks, business houses, the shipyards and, later, commercial factories were built. Hemmed in by hills both to the north and the south, the population around the harbour became concentrated on the limited flat or less steeply sloping land available along the coast. Expansion was only possible by reclamation into the sea (and later by higher buildings), spoil being obtained from nearby hills thus providing additional building land. Until the advent of motor vehicles, reclamations were unable to benefit from more remote fill sources, like the Peak where site development necessitated balanced cut and fill. In all several hundred hectares of land were reclaimed in the hundred years up to 1941 (compared with many thousands in the 50 years following).

Some of the people who were lucky enough to lease the first lots of land fronting on the sea, which had been auctioned in 1841, extended their lots by illicit reclamation over the foreshore absorbing such land as could easily be reclaimed, a procedure which was soon forbidden. Quite early, probably in 1842-3, some valuable land was reclaimed in Victoria, part of which was subsequently occupied by the Hong Kong Cricket Club (now Chater Garden).

The first formal praya (waterfront) reclamation scheme was partly carried out in 1851, by the filling of a small creek in the Bonham Strand area, but as might be expected it aroused stiff opposition from affected lessees who claimed marine rights. This, compounded by the destruction of part of the original praya wall by severe typhoons in 1867 and 1874, delayed matters but, despite these problems, by 1886 an 8km-long near-continuous strip of land (the major discontinuance being the section adjacent to the naval and military areas), perhaps broadly averaging around 100m wide was formed between Kennedy Town and North Point, the seawalls providing much needed access for handling marine cargo. In 1887 further reclamation was recommended to alleviate overcrowding in the city. As a result, the Praya Reclamation Ordinance was gazetted in 1890 and a year later Paul Chater (later Sir Paul) initiated a band of reclamation, totalling 26 hectares and extending three kilometres westward from Murray Road along the northern foreshore.

Edit History

2026-05-13 09:02:14 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
86 Reclamation Victoria Harbour, the raison d'etre for Hong Kong's foundation, formed the focal point around which the new settlers clustered and around which the banks, business houses, the shipyards and, later, commercial factories were built. Hemmed in by hills both to the north and the south, the population around the harbour became concentrated on the limited flat or less steeply sloping land available along the coast. Expansion was only possible by reclamation into the sea (and later by higher buildings), spoil being obtained from nearby hills thus providing additional building land. Until the advent of motor vehicles, reclamations were unable to benefit from more remote fill sources, like the Peak where site development necessitated balanced cut and fill. In all several hundred hectares of land were reclaimed in the hundred years up to 1941 (compared with many thousands in the 50 years following). Some of the people who were lucky enough to lease the first lots of land fronting on the sea, which had been auctioned in 1841, extended their lots by illicit reclamation over the foreshore absorbing such land as could easily be reclaimed, a procedure which was soon forbidden. Quite early, probably in 1842-3, some valuable land was reclaimed in Victoria, part of which was subsequently occupied by the Hong Kong Cricket Club (now Chater Garden). The first formal praya (waterfront) reclamation scheme was partly carried out in 1851, by the filling of a small creek in the Bonham Strand area, but as might be expected it aroused stiff opposition from affected lessees who claimed marine rights. This, compounded by the destruction of part of the original praya wall by severe typhoons in 1867 and 1874, delayed matters but, despite these problems, by 1886 an 8km-long near-continuous strip of land (the major discontinuance being the section adjacent to the naval and military areas), perhaps broadly averaging around 100m wide was formed between Kennedy Town and North Point, the seawalls providing much needed access for handling marine cargo. In 1887 further reclamation was recommended to alleviate overcrowding in the city. As a result, the Praya Reclamation Ordinance was gazetted in 1890 and a year later Paul Chater (later Sir Paul) initiated a band of reclamation, totalling 26 hectares and extending three kilometres westward from Murray Road along the northern foreshore.
Baseline (Original)
86 Reclamation Victoria Harbour, the raison d'etre for Hong Kong's foundation, formed the focal point around which the new settlers clustered and around which the banks, business houses, the shipyards and, later, commercial factories were built. Hemmed in by hills both to the north and the south, the population around the harbour became concentrated on the limited flat or less steeply sloping land available along the coast. Expansion was only possible by reclamation into the sea (and later by higher buildings), spoil being obtained from nearby hills thus providing additional building land. Until the advent of motor vehicles, reclamations were unable to benefit from more remote fill sources, like the Peak where site development necessitated balanced cut and fill. In all several hundred hectares of land were reclaimed in the hundred years up to 1941 (compared with many thousands in the 50 years. following). Some of the people who were lucky enough to lease the first lots of land fronting on the sea, which had been auctioned in 1841, extended their lots by illicit reclamation over the foreshore absorbing such land as could easily be reclaimed, a procedure which was soon forbidden. Quite early, probably in 1842-3, some valuable land was reclaimed in Victoria, part of which was subsequently occupied by the Hong Kong Cricket Club (now Chater Garden). The first formal praya (waterfront) reclamation scheme was partly carried out in 1851, by the filling of a small creek in the Bonham Strand area, but as might be expected it aroused stiff opposition from affected lessees who claimed marine rights. This, compounded by the destruction of part of the original praya wall by severe typhoons in 1867 and 1874, delayed matters but, despite these problems, by 1886 an 8km-long near- continuous strip of land (the major discontinuance being the section adjacent to the naval and military areas), perhaps broadly averaging around 100m wide was formed between Kennedy Town and North Point, the seawalls providing much needed access for handling marine cargo. In 1887 further reclamation was recommended to alleviate overcrowding in the city. As a result, the Praya Reclamation Ordinance was gazetted in 1890 and a year later Paul Chater (later Sir Paul) initiated a band of reclamation, totalling 26 hectares and extending three kilometres westward from Murray Road along the northern foreshore
2026-05-13 09:02:14 · Baseline
View content

86

Reclamation

Victoria Harbour, the raison d'etre for Hong Kong's foundation, formed the focal point around which the new settlers clustered and around which the banks, business houses, the shipyards and, later, commercial factories were built. Hemmed in by hills both to the north and the south, the population around the harbour became concentrated on the limited flat or less steeply sloping land available along the coast. Expansion was only possible by reclamation into the sea (and later by higher buildings), spoil being obtained from nearby hills thus providing additional building land. Until the advent of motor vehicles, reclamations were unable to benefit from more remote fill sources, like the Peak where site development necessitated balanced cut and fill. In all several hundred hectares of land were reclaimed in the hundred years up to 1941 (compared with many thousands in the 50 years. following).

Some of the people who were lucky enough to lease the first lots of land fronting on the sea, which had been auctioned in 1841, extended their lots by illicit reclamation over the foreshore absorbing such land as could easily be reclaimed, a procedure which was soon forbidden. Quite early, probably in 1842-3, some valuable land was reclaimed in Victoria, part of which was subsequently occupied by the Hong Kong Cricket Club (now Chater Garden).

The first formal praya (waterfront) reclamation scheme was partly carried out in 1851, by the filling of a small creek in the Bonham Strand area, but as might be expected it aroused stiff opposition from affected lessees who claimed marine rights. This, compounded by the destruction of part of the original praya wall by severe typhoons in 1867 and 1874, delayed matters but, despite these problems, by 1886 an 8km-long near- continuous strip of land (the major discontinuance being the section adjacent to the naval and military areas), perhaps broadly averaging around 100m wide was formed between Kennedy Town and North Point, the seawalls providing much needed access for handling marine cargo. In 1887 further reclamation was recommended to alleviate overcrowding in the city. As a result, the Praya Reclamation Ordinance was gazetted in 1890 and a year later Paul Chater (later Sir Paul) initiated a band of reclamation, totalling 26 hectares and extending three kilometres westward from Murray Road along the northern foreshore